Regional Drought Resiliency Project - Intertie
Closed State & local contract opportunity
- Solicitation number
- RFQ No. WT-23001
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 71131406 Iron sulfide deposit removal services
- 71131410 Pipeline cleaning services
- 71131416 Impurity removal services
- 71131418 Bacterial and fungus control services
- 71131417 Organic fouling control services
- 78102103 Pipeline inline inspection service
- 72141124 Pipe laying service
- 95121640 Pipeline
- 71131409 Chemical treatment monitoring services
- 71131413 Corrosion inhibiting services
Show all 19
- 78102101 Petroleum products transport
- 71131404 Sulfide scavenging services
- 71131405 Flow line hydrate formation control services
- 71131407 Squeeze modeling services
- 71131408 Hydrate formation modeling services
- 71131411 Pipeline flow enhancement services
- 71131414 Scale inhibiting services
- 71131415 Pipeline flow assurance services
- 78102102 Water transport
- Point of contact
-
- Katy Fitzgerald kfitzgerald@santacruzca.gov (831) 420-5200
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Santa Cruz Water Department is seeking a Prime Contractor with a General-A license to execute the Regional Drought Resiliency Project - Intertie, a critical water infrastructure development initiative spanning Santa Cruz County and San Francisco City. The project involves installing approximately 8,000 linear feet of 12-inch diameter PVC pipeline and constructing a pump station to facilitate water supply transfers between the City of Santa Cruz and Scotts Valley Water District. The pipeline will run from the City's Pasatiempo tanks along Firehouse Lane to Sims Road and then along La Madrona Drive to the City of Scotts Valley. The procurement will follow a two-step process, with an initial Request for Qualifications (RFQ) to shortlist three to four Prime Contractors, followed by an Invitation for Bids. The Statement of Qualifications (SOQ) is due on November 10, 2023, at 2:00 PM, with construction expected to start in 2024 and have a duration of approximately 379 calendar days. Contractors must self-perform at least 50% of the work and will be evaluated based on their qualifications, expertise, and ability to meet project specifications.
The project has specific restrictions on contractor participation, requiring a General-A license and mandating that contractors self-perform at least 50% of the work. Potential funding sources include the California Department of Water Resources' Urban and Multibenefit Drought Relief Grant Program and the City's capital improvement budget. Contractors must comply with prevailing wage requirements and local hire regulations. The project requires comprehensive insurance coverage, including commercial general liability, professional liability, automobile liability, workers' compensation, and pollution liability insurance. The estimated construction cost ranges from $4,600,000 to $5,900,000, with the contract awarded to the lowest responsive and responsible prequalified Prime Contractor. The project includes additional infrastructure elements such as line valves, air release valves, isolation valves, sample stations, and hydrants. No specific set-aside designations or disadvantaged enterprise requirements were explicitly mentioned in the procurement documents.
Opportunity text
You are invited to submit a Statement of Qualifications (SOQ) for the Regional Drought Resiliency Project - Intertie to present your special expertise and to substantiate your capabilities to act as a Prime Contractor with a General-A license to install approximately 8,000 LF of 12" diameter PVC pipeline and construct a pump station for water conveyance.
The City is using a two-step procurement process for selecting a Prime Contractor. In Step 1, the City will evaluate all responsive SOQs and shortlist those Prime Contractors that qualify in accordance with the rules, guidelines, and procedures set forth in this RFQ. In Step 2, the short-listed Prime Contractors will receive an Invitation For Bids to construct the Project. The contract award will be made to the responsive and responsible prequalified Prime Contractor offering the lowest price.
Files
| File | Type | Posted |
|---|---|---|
| Regional_Drought_Resiliency_Project-Intertie_RFQ.pdf |