Rabun County WSA Package Water Treatment System Replacement

Closed State & local contract opportunity Posted

Solicitation number
PE-98850-NONST-2025-000000006
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 45

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The Rabun County Water and Sewer Authority in Georgia is seeking bids for the Package Water Treatment System Replacement at the Lake Rabun Water Treatment Plant. The project involves restoring two 1.0 MGD package filter units and associated controls, converting them from a Roberts system to a Trident system manufactured by Westech Engineering, Inc. Additionally, the existing blowers will be replaced with new air piping, and any interior coating failures in the filters will be repaired. The filter equipment package has already been furnished by the Authority and is in storage near the site. Bids will be accepted until 1:00 PM on October 8, 2024, and the project is to be completed within 90 consecutive calendar days for substantial completion and 150 consecutive calendar days for final completion from the date of the Notice to Proceed. The Authority intends for the contractor to begin work and prepare to take the first filter offline for upgrades in early January 2025. The award of the contract will be based on several criteria, including bid prices, experience, and references.

The contract opportunity does not mention any set-aside designations or restrictions on the types of organizations that can respond. The filter equipment package is already provided by the Authority, and the work is focused on the restoration and conversion of the existing filter units. The current value or budget range for the project is not specified in the provided information.

Opportunity text

ADVERTISEMENT FOR BIDS: Package Water Treatment System Replacement Lake Rabun Water Treatment Plant Rabun County Water and Sewer Authority Sealed bids will be received by the Rabun County Water and Sewer Authority, Georgia for furnishing materials, labor, tools, equipment, and any other miscellaneous items necessary for the construction of Package Water Treatment System Replacement- Lake Rabun Water Treatment Plant. bids will be received at Rabun County Water And Sewer Authority, 137 Hiawassee Street, Clayton, GA 30525 until 1:00 p.m. on October 8, 2024. Any bid received after said time and date of bid opening will not be considered by OWNER. The Project consists of, but is not limited to the following major elements: Enhancements to existing 2.0 MGD Water Treatment Facility. Major components include restoration of 2 each 1.0 MGD package filter units and associated controls with new filter media and associated internal components of each filter unit. Each filter unit will be converted from a Roberts system to a Trident system, manufactured by Westech Engineering, Inc.. All controls shall be upgraded as well. And existing blowers shall be replaced as well with new air piping. Work also includes repairing any interior coating failures in each filter. Note: the filter equipment package by Westech Engineering, Inc for the 2 each 1.0 MGD package filter units shall be furnished by the Authority and is already in storage at a facility near the Water Treatment Plant site. Time of completion for all work associated with this project shall be ninety (90) consecutive calendar days to achieve substantial completion and 150 consecutive calendar days to achieve final completion. It is the intention of the Authority that the contractor begin work and have initial, necessary work completed to be prepared to take the first filter off-line for upgrades in early Jan. 2025 For documents regarding this project contact Russ Brink at 770-361-6090 rbrink@eminc.biz

Files

File Type Posted
ADVERTISEMENT FOR BIDS.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity