The Ohio Department of Natural Resources, Division of Parks and Watercraft, is soliciting bids for a new feeder waterline and two supplied Murdock M275RV tower dump station water hydrants at Dillon State Park, with bids due December 11, 2026. The procurement carries preference programs rather than a set-aside: a 5% preference for Buy American domestic source end products, a 2% preference for Buy Ohio offerors where applicable to products exceeding 50% of total cost, and a 2% preference for certified Veteran-Friendly Business offerors, all applied under Ohio Administrative Code 123:5-1-06.
The scope includes excavating approximately 100 linear feet of trench (minimum 12 inches wide and 36 inches deep below frost line), saw cutting asphalt and concrete across two dump station lanes, installing 1-inch black PE4710 service tubing with copper or brass fittings, installing the hydrants, and restoring surfaces with 6 inches of concrete meeting ODOT compliance standards. Bidders must bid all items to be considered responsive, and project completion is April 1, 2027. Mandatory site visits are available by appointment Monday through Friday, 7:00 a.m. to 3:00 p.m., through Dave Finley (740-506-5786) or Eric Keplar (614-935-6064). Failure to request a mandatory site visit will not be grounds for contract release after award.
Award goes to the lowest responsive and responsible bidder based on low lot total, calculated by multiplying unit costs by estimated usage and summing all line items. The contract is F.O.B. Destination, Pre-Paid and Allowed, so the contractor bears freight and risk of loss until title passes on acceptance. Contractors must carry commercial general liability and business automobile liability with a minimum $2 million aggregate, naming ODNR and the State of Ohio as additional insureds. A performance bond is required if the work constitutes a public improvement. The addendum imposes prevailing wage under Ohio Revised Code Chapter 4115 and Ohio law with jurisdiction in Franklin County. The State's Affirmation and Disclosure Form requires certification that no services or State data will be located offshore and that no purchases will come from Russian institutions, plus disclosure of all performance and data-storage locations, including subcontractors. Standard terms require NIST 800-53 moderate-baseline security, SOC 2 Type 2 audits, and data kept within the contiguous United States across two geographically separated data centers. The jurisdiction is recorded as Montgomery County.
Opportunity text
The Ohio Department of Natural Resources is requesting bids for: Division of Parks and Watercraft, installation of new feeder waterline and installation of two, supplied dump station hydrants. Name or Title of the Service or Supply: Installation of two supplied Murdock M‑275‑RV tower dump station water hydrants, and Installation of new feeder waterlines. Ordering Division and address: Ohio Dept of Natural Resources, Div of Parks and Watercraft Project Location: Dillon State Park 4405 Dillon Hills Dr. Nashport, OH 43830