RFQ Quick Quote Dillon Hydrant 5TD0.docxRFQ Quick Quote Dillon Hydrant 5TD0.docx

DOCX document 4 MB Posted

Attached to
PWC Dillon Dump Station Waterline Replacement
Solicitation number
SRC0000043040
Issued by
Montgomery County, Ohio

About this file

This is a Request for Quote (RFQ) document issued by the Ohio Department of Natural Resources, Division of Parks and Watercraft, for the installation of new feeder waterlines and two supplied dump station hydrants at Dillon State Park in Nashport, Ohio. The project involves comprehensive site work including excavation of approximately 100 linear feet of trenches (minimum 12 inches wide and 36 inches deep below frost line), saw cutting of asphalt and concrete surfaces across two dump station lanes, installation of 1-inch black PE4710 service tubing with copper or brass fittings, installation of two supplied Murdock M275RV tower dump station water hydrants, and surface restoration using 6 inches of concrete meeting ODOT compliance standards. Mandatory site visits are available by appointment Monday through Friday between 7:00 a.m. and 3:00 p.m., with contact information provided for Dave Finley (740-506-5786) and Eric Keplar (614-935-6064). The project completion date is April 1, 2027, and the contract will be awarded to the lowest responsive and responsible bidder based on low lot total by multiplying unit costs by estimated usage and summing all line items.

The contract is issued on an F.O.B. Destination/Pre-Paid/Allowed basis, with all freight costs and risk of loss borne by the contractor until title passes to the State upon acceptance. The State will apply preferences pursuant to Ohio Administrative Code 123:5-1-06, including a five percent preference for Buy American domestic source end products, two percent for Buy Ohio Offerors (if applicable to products exceeding 50% of total cost), and two percent for certified Veteran-Friendly Business Offerors. Invoices must be submitted directly to Ohio Shared Services and include the purchase order number, supplier name, ship-to address, invoice number, service date, itemized services and materials, line charges, and remit-to address; no Ohio sales tax should be included. Bidders must bid all items to be considered responsive, and failure to request a mandatory site visit will not be grounds for contract release following award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Ohio Department of Natural Resources is requesting bids for: Division of Parks and Watercraft, installation of new feeder waterline and installation of two, supplied dump station hydrants.

Name or Title of the Service or Supply: Installation of two supplied Murdock M‑275‑RV tower dump station water hydrants, and Installation of new feeder waterlines.

Ordering Division and address: Ohio Dept of Natural Resources, Div of Parks and Watercraft

Project Location:Dillon State Park
4405 Dillon Hills Dr.
Nashport, OH 43830

Location of Dump Station

Overview of dump station/waterline lay out

Specifications Contractor is responsible for acquisition of all materials and supplies except for the two Murdock M‑275‑RV tower dump station water hydrants which are supplied and onsite.

1. Excavation and Exposure

· Locate and expose existing water and drain valves near the backflow preventer.

· Excavate a trench minimum 12″ wide and 36″ deep (below frost line) from the backflow preventer to the concrete/asphalt interface crossing the dump station lanes.

· Approximate linear feet of trenching is 100 feet.

2. Saw‑Cutting Requirements

· Lane #1: Saw‑cut asphalt to 39″ width up to the first hydrant bay.

· Saw‑cut through the concrete island at minimum 12″ width.

· Lane #2: Saw‑cut asphalt to 27″ width.

· Saw‑cut concrete to minimum 12″ width around the backside of both hydrant bays, through curb lines, and around existing hydrants.

3. Trenching for Hydrant Drains

· Excavate all feeder trenches to 36″ depth.

· Excavate additional depth as required to install 3 cubic feet of large round stone beneath each hydrant drain stem.

· Approximate linear footage of trenching is 100 feet.

4. Water Line and Hydrant Installation

· Install 1″ black PE4710 service tubing for all feeder lines.

· All fittings shall be copper or brass only (no plastic fittings).

· Install supplied Murdock M‑275‑RV hydrants (supplied)

· Wrap the hydrant drain openings in filter fabric and place a minimum of 3 cubic feet of large round stone (3”–5”) beneath each wrapped drain.

· Purge all water lines.

· Connect the 1″ feeder line to each hydrant’s ¾″ inlet using proper reducers.

· Ensure hydrants are installed plumb and adjust outer casing, so the bottom of the flared base is at grade.

5. Backfilling

· Backfill all non‑roadway trenches with excavated material.

· Backfill all roadway trenches with #57 limestone aggregate to a depth 6″ below finished grade to allow for concrete placement.

· Compact fill in proper lift heights appropriate for the soil and aggregate type.

6. Surface Restoration

· Restore grass areas using excavated material brought to final grade.

· Restore roadway surfaces, dump station bays, and bay curbs using 6″ of concrete meeting the specifications below.

7. Concrete Specifications (ODOT Compliance) All concrete supplied for this project shall:

· Conform to ODOT C&MS Section 499 and Item 451.

· Achieve minimum 28‑day compressive strength of 4,000 psi.

· Use 1″ nominal maximum size coarse aggregate.

· Contain 7% design air content.

· Use cementitious materials, aggregates, admixtures, and mixing water in compliance with ODOT Sections 701, 703, 705, and 499.

· Include a submitted and approved mix design per ODOT 499.03 and ACI 301 prior to production.

· Placement, finishing, jointing, and curing shall follow ODOT Item 451 requirements.

Fiber Reinforcement

· Concrete shall incorporate an approved synthetic fiber per ODOT C&MS 499.02.

· Fibers shall be added at the manufacturer‑approved dosage rate.

· Slump may vary per DS‑23063, with a target slump of up to 5″ (maximum 6″).

Photos:

Shows saw cuts/trench excavation (widths-12”, 27”, and 39”) across both lanes #1 and #2 to both tower locations:

Shows existing hydrant location for lane #2 – white paint marks on hydrant curb (red circle) indicate saw cut/exaction location for that tower hydrant:

Shows edge of lane #1 looking back toward the backflow preventer/water valves (Red Circle):

Shows existing hydrant location for lane #1- white paint marks indicate saw cut/exaction through hydrant area curb.

Delivery: Dillon State Park, campground dump station, 4405 Dillon Hills Dr., Nashport, OH 43830, Dave Finley, 740-506-5786, david.finley@dnr.ohio.gov Completion Date: April 1, 2027 F.O.B. DESTINATION/PRE-PAID/ALLOWED. The Contractor must provide Deliverables under this Contract F.O.B. Destination/Pre-Paid/Allowed. The place of destination will be specified by the Ordering Agency on the agency’s purchase order or other ordering document. Cost of the freight must be borne and paid by the Contractor unless otherwise stated.

All risk of loss, regardless of the cause, will remain with the Contractor until title to the Deliverable passes to the State. Unless otherwise provided in this Contract, the State will determine whether the Contractor provided each Deliverable required in this Contract and has fully met all work requirements of this Contract. Title to any Deliverables will pass to the State on Acceptance of the Deliverable.

Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.

Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by line item.

Preferences:

The State will apply all preferences pursuant to Ohio Administrative Code 123:5-1-06.

Following the initial evaluation and scoring, all Proposals will be considered for preferences. Preferences will be calculated at a rate of five percent (5%) for the first preference and two percent (2%) each for the second and third preferences. The preferences shall be combined and applied as a total percentage of the original Proposal to determine the score for evaluation purposes.

Preferences will only be applied if there is at least one Offeror that does not qualify for that particular preference. For purposes of qualifying for a preference, an Offeror failing to complete the certification for each preference will be deemed as not qualifying for that preference.

(a) For the Buy American preference, if any Offeror offers a product that is not a domestic source end product, the State will add the applicable percentage of the total available points to the total score of each Offeror offering a domestic source end product.

(b) For the Buy Ohio preference, if any Offeror is a Buy Ohio Offeror claiming the preference, the State will add the applicable percentage of the total available points to each Buy Ohio Offeror’s total score.

(c) If claiming the preferences in (a) and (b) based on the product(s) offered, an Offeror is only eligible to receive the preference if the cost of the product(s) offered exceeds 50% of the total offered cost for products and services. A Buy Ohio Offeror is also eligible to receive the Buy Ohio preference based on its significant economic presence in Ohio or a border state.

(d) For the Veteran-Friendly Business preference, the State will add the applicable percentage of the total available points to any certified veteran-friendly business Offeror’s total score.

Site Visit & Point of Contact Site visits are mandatory and available by appointment only Monday, 7:00am through Friday, 3:00pm. To schedule an appointment, contact: Dave Finley, 740-506-5786 OR Eric Keplar, 614-935-6064 Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.

Bill to information:

Invoicing Invoices Origin-DNR-456 (A unique number will be provided with each invoice.)

All invoices must be submitted DIRECTLY to Ohio Shared Services (OSS).

There are three options available to submit invoices to OSS:

· EMAIL the invoice to: invoices@ohio.gov

· FAX the invoice to: 1-614-485-1039

· MAIL the invoice to: Ohio Shared Services, PO Box 182880, Columbus, Ohio 43218-2880 In order to process your invoice, please make sure all the required information listed below is on your invoice before submitting it to OSS or they will be returned for not being a proper invoice.

1. Must include the Purchase Order (PO) number assigned. You may shorten it to the last five digits.

2. Supplier full name as it appears on your PO.

3. The Ship to and/or service facility name and full address

4. Unique invoice number

5. Date of service or date work was completed.

6. Complete itemization of services performed, materials or goods supplied and/or labor furnished.

7. Line charge(s). If parts are included, please break out the line charges with product and charges separately.

8. No State of Ohio sales tax

9. Remit to address must match our records for payment All fields mentioned above are required to count as a correct invoice; failure to provide this information will result in a returned invoice and delayed payment.

Contract Negotiations. Negotiations will be scheduled at the convenience of DNR. The selected Offeror(s) are expected to negotiate in good faith.

image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png