Pump Station 0812 Relocation and Upgrade

Open State & local contract opportunity Posted

Solicitation number
MCC 7360 RPQ No P16319
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Miami-Dade County is requesting price quotations for the relocation and upgrade of Sewage Pump Station No. 0812, including complete demolition of the existing station and construction of a new facility at 8401 SW 107th Avenue, with electronic bids due December 1, 2026 at 10:00 a.m. A mandatory pre-bid meeting and site visit are scheduled for October 28, 2026 at 10:00 a.m. at the pump station location.

The scope encompasses excavation; demolition and removal of existing pumps, motors, valves, piping, and control systems; installation of two 15 HP submersible pumps; construction of new wet well, valve vault, and sanitary manhole structures; sewer force main removal and replacement; temporary bypass pumping operations; electrical service upgrades with coordination with FPL; SCADA and RTU panel integration; and landscape restoration. Hard copy bids must be postmarked within one business day of electronic submission.

The estimated project value is $1,792,605 excluding contingencies and dedicated allowances, with a projected start date of December 14, 2027 and a 280-calendar-day completion timeline. Liquidated damages are set at $1,000 per day. Bid bonds are required for bids of $200,000 or more; performance and payment bonds are mandatory upon award.

Bidders must hold a Florida Certificate of Competency or Construction Industry Licensing Board certification as a General Engineering Contractor, Pipeline Engineering Contractor, or Underground Utility and Excavation Contractor. Minimum qualifications require successful completion of at least three sewage pump station projects within the seven years preceding the bid date, with at least one completed within a private property easement. By-pass pumping subcontractors must demonstrate successful operation of at least three by-pass pumping operations without spills or overflows. Contractors must comply with E-Verify requirements, maintain workers' compensation insurance, and carry commercial general liability coverage of at least $1,000,000 per occurrence and $2,000,000 aggregate, plus automobile liability insurance of $1,000,000 combined single limit.

No Davis-Bacon prevailing wage, apprenticeship investment, or disadvantaged business enterprise, small business enterprise, or other set-asides apply to this contract.

Opportunity text

A. The project consists of furnishing all materials, labor and equipment necessary to demolish existing Sewage Pump Station and construct proposed Sewage Pumping Station No. 0812 as indicated on plans, the work includes but it is not limited to, excavation, demolition and modification work; removal of existing pumps, motors, valves, piping and fittings; partially removal and backfilling of existing dry well and wet well structures; removal of wet well and dry well top slabs and access hatches; removal of existing power/control panel and concrete slab; removal of existing telemetry antenna and remote terminal unit equipment; existing electric service to remain, meter and main disconnect; removal, transport, salvage and legal disposal of demolition material and equipment; transportation and handling costs, including removal of salvaged equipment to a location designated by the Engineer; removal and replacement of existing PVC sanitary sewer main; furnish, install, operate, and remove temporary sewage effluent bypass pumps, equipment and accessories; furnish and install valve vault structure, top slab and access hatch; furnish and install new wet well structure, top slab and access hatch; furnish and install new sanitary manhole structure, frame and cover; furnish and place suitable backfill material; furnish and install two 15 HP submersible pumps and related equipment; furnish and install leveler control system and related equipment; furnish and install valve vault sump pump and related equipment; furnish and install new water service piping, enclosure and accessories; furnish and install backflow prevention device; coordinate with FPL for installation of electrical service; furnish and install meter and main disconnect; furnish and install the proposed power/control system inclusive of the necessary electrical panel, enclosure, telemetry system and related equipment; install RTU panel and SCADA equipment furnished by the Department; furnish and install RTU and 01 11 00-3 SCADA materials not specifically provided by the Department; electrical work; mechanical work; furnish all materials, equipment and supplies necessary for pump station startup and testing; furnish and install sewage force main pipe and fittings; connection to existing sewage force main; placing asphalt driveway; furnish and install landscape improvements as indicate on plans; temporary and permanent replacement of any sod, sidewalk, pavement and/or driveway damaged by construction; site restoration; and other appurtenant and miscellaneous items and work for a complete, satisfactory and functional installation.