About this opportunity

Wakulla County is requesting statements of qualifications from professional engineering firms for surveying, flood risk reduction analysis, engineering design, plans preparation, permitting coordination, and bid proposal preparation services for Phase 1 of the Wakulla Gardens Stormwater Infrastructure project under RFQ 2026-09, with proposals due June 8, 2026.

Phase 1 is a planning and design phase with no construction. The scope encompasses evaluation and development of flood risk reduction measures within the Wakulla Gardens subdivision in Wakulla County, including the Cypress Quarters CDP. Phase 2, not included in this RFQ, is anticipated to include acquisition of approximately sixteen parcels and construction of six stormwater retention basins designed to provide protection against the 10-year storm event.

The source does not identify an estimated contract value, contract term, evaluation criteria, or timeline for questions and pre-bid activities for the RFQ itself. No incumbent is named.

The source also identifies two related but separately issued construction solicitations: the City of Newberry is requesting bids under ITB 2026-09 for Historic Newberry Power Plant Phase 1 restoration (bids due June 9, 2026), and the Jefferson County Board of County Commissioners is requesting bids under ITB 2026-09 for widening and resurfacing CR 149 Boston Highway Phase I from SR 57 to Still Road (bids due June 4, 2026). The Historic Newberry Power Plant project requires compliance with the Secretary of the Interior's Standards and Guidelines; bidders must hold a valid Florida Certified or Registered General Contractor License, maintain at least three years of Florida experience under the current business name, and carry General Liability, Workers' Compensation, and Automobile Liability insurance. Lead-based paint was detected during testing on December 23, 2025; the contractor is responsible for all lead abatement. Liquidated damages of $250 per calendar day apply for failure to meet the December 31, 2026 completion deadline. The pre-bid conference and site visit is May 14, 2026 at 10:00 AM EST; questions are due May 28, 2026. The Boston Highway project evaluation criteria include ability and capacity to perform within specified timeframes, character and integrity, quality of previous contract performance, compliance with applicable laws, financial resources and stability, and qualifications of personnel and licensing. A Cone of Silence was imposed from May 8, 2026 through issuance of the Notice of Award.

Opportunity text

4 versions

Update #4 · Latest ·

Contractor shall provide all labor, materials, tools, equipment, and supervision necessary to furnish and install a propane generator set at the Baker County Fire Rescue Headquarters, 1190 West Macclenny Avenue, Macclenny, FL 32063. The installation of the manufacturers most current product specified below (or equal).

Update #3 ·

Wakulla County (the County) is seeking Statements of Qualifications from qualified professional engineering firms (the Consultant) to provide surveying, flood risk reduction analysis, engineering, design, plans preparation, public notices, permitting coordination, and bid proposal preparation services for Phase 1 for RFQ 2026-09 Professional Services For Wakulla Gardens Stormwater Infrastructure . The purpose of this phase is to evaluate and develop measures to reduce flood risk within the Wakulla Gardens subdivision. No construction activities are included in Phase 1. Phase 2 of the project, which is not included in this RFQ, is anticipated to include the acquisition of approximately sixteen (16) parcels and the construction of six (6) stormwater retention basins designed to provide protection against the 10-year storm event.

Update #2 ·

This project is for the construction services for widening and resurfacing and widening of CR 149 Boston Highway from SR 57 (US 319) FL/GA Parkway to Still Road. The scope will include (2) 12' travel lanes and 3' paved shoulders. Drainage improvements will include evaluating all driveway side drain pipes and miter-end sections due to their condition and to keep drainage connectivity, as needed. Signage exists within the project limits and will be evaluated to determine the need for additional signs, correcting redundant or conflicting signage and the replacement of existing signage, as needed. New thermoplastic striping and RPM's will also be included in the project. All work will be completed within existing right of way.

Update #1 ·

Restoration of the Historic Newberry Power Plant Phase I (Construction). Restoration of the Historic Newberry Power Plant Phase 1 in accordance with the specifications and the accompanying drawings. This project is sponsored in part by the Department of State, Division of Historical Resources and the State of Florida. All project work shall be in compliance with the Secretary of the Interiors Standards and Guidelines available online www.nps.gov/tps/standards.htm.