Professional Engineering Services For Coring, Bituminous Testing And Concrete Testing Services On Various Warren County Projects For 2027 - 2028
Closed State & local contract opportunity Posted
- Solicitation number
- WC2693FO
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Warren County, New Jersey is soliciting professional engineering services for bituminous core drilling, laboratory analysis, and concrete testing on various county projects for 2027 through 2028, with responses due November 13, 2026. No set-aside, preference, or eligibility restriction appears in the source.
Work requires core drilling to N.J.D.O.T. specifications and ASTM/AASHTO procedures, including random sampling calculations, field sample mark-out, and supply of the drilling unit and labor. The contractor fills and compacts sample holes with high-performance patch materials approved by the County Engineer. Laboratory work covers extraction analysis for mix composition, bulk specific gravity and void analysis for density, and maximum theoretical specific gravity. Per lot, the contractor tests five larger-diameter cores and five smaller-diameter cores, with the smaller set required only when no in-plant inspection services are provided. Testing must be completed within seven days of paving a lot, with no exceptions. The contractor also calculates penalties from in-place quantities supplied by the county and prepares the N.J.D.O.T. final test report required for project acceptance and cost reimbursement. Basic traffic control, consisting of two flaggers and advance warning signs, is included in the price. Surface and base course testing and any work beyond base scope require prior approval from the County Engineer.
Opportunity text
ENGINEERING SERVICES FOR CORING, BITUMINOUS TESTING AND CONCRETE TESTING A. BITUMINOUS CONCRETE CORE DRILLING Core drilling performed in accordance with N.J.D.O.T. specifications - ASTM/AASHTO procedures. Perform random sampling calculations and sample mark out in field. Supply drilling unit and labor to obtain samples of finished pavement. Filling and compacting sample holes with high performance patch materials as approved by the County Engineer. B. LABORATORY ANALYSIS Extraction Analysis (composition of mix) AASHTO procedure T-308-8. Bulk specific gravity and void analysis (density) AASHTO procedure T-166. Maximum theoretical specific gravity AASHTO procedure T-209. C. CALCULATIONS OF PENALTIES (IF APPLICABLE) AND FINAL REPORT Calculation of penalties based upon in place quantities supplied by client. Preparation of the required N.J.D.O.T. final report of test results for submittal to the N.J.D.O.T. for project acceptance and cost reimbursement. D. CORE SAMPLES AND TESTS PER LOT Five (5) each 6.00 diameter samples to be tested for bulk specific gravity, maximum theoretical gravity, void analysis and thickness measurements. If both surface and base courses must be tested the additional cost will be approved by the County Engineer prior to performing the services. Five (5) each 8.00 diameter samples to be tested for mix composition will be needed when no in plant inspection services are provided. If necessary, this work shall be directed and approved by the County Engineer prior to performing the services. Must be performed within 7 days of completion of a paved lot and/or lots no exceptions. (Reference also Construction Procedures Handbook, Section IV, Subsection F-14) E. TRAFFIC CONTROL Basic traffic control will include TWO (2) Traffic Control Flaggers and all necessary advanced warning signs. The cost for basic traffic control will be included in the price for coring and testing. Should local traffic conditions, traffic volumes, road geometry, limited sight distance, etc. require additional Traffic Control Flaggers, this work would be paid for from the Additional Traffic Control Flagger line item after authorization by the County Engineer. The roads which require additional traffic control will be specified by the County Engineer prior to any field work. All traffic control signs, devices, installations and procedures shall be as specified in the most current edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways." All traffic control signs and devices shall be kept in good and clean condition throughout the project. Signs or devices that show noticeable color fading, illegible lettering, or significant residue or abrasions shall not be used. Before beginning work on any phase of the project, the Contractor shall furnish and install all specified warning signs, barricades, lights, flashers, traffic cones, etc. which in the opinion of the Engineer, are necessary to protect the public during that phase of the operations. All signs and traffic control measures are to be in place and approved by the County Representative before any work is allowed to begin. Advanced signing prior to flaggers locations, as per the "Manual on Uniform Traffic Control Devices for Streets and Highways", will be required. Flaggers shall be positioned in a highly visible location on the side of the roadway. Approaching traffic must be able to see the flagger in time to react and come to a complete stop at the flagger location. Flaggers shall use the proper hand signals and procedures as stated in the "Manual on Uniform Traffic Control Devices for Streets and Highways". Flaggers shall use stop/slow paddles to direct traffic in lieu of flags. Flaggers shall wear safety apparel meeting the requirements of ISEA "American National Standard for High-Visibility Apparel" and labeled as meeting the ANSI 107- 1999 standard performance for Class 2 risk exposure. Flaggers are also required when the contractor is working in shoulder areas not fully protected by temporary crash barrier systems. No work shall be done until qualified flaggers are on duty. Where companion flaggers are greater than 500 apart or out of sight of each other, each shall be equipped with a portable two-way radio to maintain communications. Higher volume County roads may also require an additional flagger and truck mounted crash cushion to protect workers due to field conditions. Additional Traffic Control Flagger: When conditions warrant and/or when directed by the County Engineer, the Contractor will furnish at least ONE (1) additional Traffic Control Flagger with the necessary stop/slow paddles and safety clothing. Additional flaggers will be on duty at all times and it will be their sole duty to regulate and control traffic. F. NUCLEAR DENSITY TESTING Nuclear density testing will be performed to ensure compliance with the compaction specifications. Testing shall be performed as directed by the County Engineer. An inspection report with test results shall be submitted to the County for each days work. G. IN PLANT INSPECTION SERVICES In plant inspections will be performed to ensure compliance with the bituminous mix specifications. The inspector shall monitor the production and testing of the bituminous material prior to shipping to the job site. A rsum with qualifications and experience will be submitted with the proposals for each inspector who may be assigned to the project. Scheduled plant inspections may be canceled due to inclement weather or other circumstances. The County will notify the Testing Company as soon as possible if plant inspection is not needed for the day. No payment will be made if the plant inspection is cancelled prior to 4:30 PM the day before work is scheduled. A payment of 25% of the daily rate will be made if the plant inspection is cancelled prior to 7:00 AM on the day the work is scheduled. A payment of 50% of the daily rate will be made if the plant inspection is cancelled after 7:00 AM on the day the work is scheduled. H. CONCRETE FIELD TECHNICIAN Quality Control testing as needed to ensure compliance with the requirements for the concrete in accordance with N.J.D.O.T. specifications and ASTM/AASHTO procedures. Concrete Field Technician to be certified by ACI as a Concrete Field Technician, Grade 1 Sampling fresh mixed concrete - AASHTO procedure T-141 Making and curing concrete test specimens in the field - AASHTO procedure T-23 Testing for slump of hydraulic cement concrete - AASHTO procedure T-119 Testing for air entrainment - AASHTO procedure T-152 or T-196 Provide report of testing results. Scheduled field technicians may be canceled due to inclement weather or other circumstances. The County will notify the Testing Company as soon as possible if field technician is not needed for the day. No payment will be made if the field technician is cancelled prior to 4:30 PM the day before work is scheduled. A payment of 25% of the daily rate (8 hours) or half daily rate (4 hours), whichever was scheduled, will be made if the field technician is cancelled prior to 7:00 AM on the day the work is scheduled. A payment of 50% of the daily rate (8 hours) or half daily rate (4 hours), whichever was scheduled, will be made if the field technician is cancelled after 7:00 AM on the day the work is scheduled. I. PICKUP OF CONCRETE TEST CYLINDERS Concrete test cylinders to be picked up and delivered to testing facility after initial onsite cure period (24-48 hours) as directed by the County Engineer. J. COMPRESSIVE STRENGTH OF TEST CYLINDERS Compressive Strength to be determined in accordance with N.J.D.O.T. specifications and ASTM/AASHTO procedures. Compressive strength of concrete cylinders - AASHTO procedure T-22 All testing in accordance with ASTM C-39 Provide report of testing results.
Files
| File | Type | Posted |
|---|---|---|
| warren C.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity