Procurement, Installation, Maintenance of Generator for Division of Corporations

Closed State & local contract opportunity Posted

Solicitation number
ITN-07500
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

This state and local contracting opportunity is for the Procurement, Installation, Maintenance of Generator for the Division of Corporations, issued by the Florida Department of State. The contract is for the procurement, installation, and maintenance of a generator for the Division of Corporations, located in Leon County, Tallahassee, Florida. The vendor will be responsible for the engineering, drawings, and design of the generator. The Department will provide copies of the last 12 months of utility bills to the vendors who attended the mandatory site visit, and the generator fuel tank should be sized to provide at least 72 hours of continuous operation at 100% load before requiring refueling. The original ITN solicitation number is DOS-ITN-23/24-034, with proposals due on January 8, 2024 at 2:00 P.M. Eastern Time.

The addendum clarifies that the vendor will be responsible for the engineering, drawings, and design of the generator, but does not address any specific fencing or bollard requirements. This is not a new solicitation, and replies will only be accepted from those respondents attending the mandatory site visit, which was held on December 15, 2023. The contract does not appear to have any set-aside designations or restrictions on the types of organizations that can respond, and the addendum does not mention any incumbent vendors or current contractors. The budget range for the contract is not specified in the provided information.

Opportunity text

Update: 12/22/2023- Addendum No. 1- Department's Response to Vendor Written Questions.

**Please note: This is not a new solicitation. In accordance with Section 2.2 Mandatory Site Visit, "Replies will only be accepted from those respondents attending the mandatory site visit." The site visit was held on December 15, 2023.

Files

File Type Posted
DOS-ITN-23.24-034 Addendum No. 1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors