DOS-ITN-23.24-034 Addendum No. 1.pdf
PDF 240 KB Posted
- Solicitation number
- ITN-07500
- Issued by
- Leon County, Florida
About this file
This document is an Addendum No. 1 to the Invitation to Negotiate (ITN) for the Procurement, Installation, Maintenance of Generator for the Division of Corporations, issued by the Florida Department of State. The addendum provides written responses to vendor questions regarding the mandatory site visit, including details about utility bills, generator fuel tank size, protective measures, and engineering/design responsibilities. The original ITN solicitation number is DOS-ITN-23/24-034, with proposals due on January 8, 2024 at 2:00 P.M. Eastern Time. The contract is for the procurement, installation, and maintenance of a generator for the Division of Corporations, located in Leon County, Tallahassee, Florida.
The addendum clarifies that the vendor will be responsible for the engineering, drawings, and design of the generator, but does not address any specific fencing or bollard requirements. The Department will provide copies of the last 12 months of utility bills to the vendors who attended the mandatory site visit, and the generator fuel tank should be sized to provide at least 72 hours of continuous operation at 100% load before requiring refueling.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation To Negotiate Addendum Acknowledgement Form Department of State R.A. Gray Building 500 South Bronough Street, Room 428 Tallahassee, Florida 32399-2150
SOLICITATION TITLE:
SOLICITATION NO:
Procurement, Installation, Maintenance of Generator for Division of Corporations
DOS-ITN-23/24-034
Proposals DUE:
January 8, 2024 at 2:00 P.M. (Eastern Time) and may not be withdrawn within: 180 Days after such date and time.
ADDENDUM NO.: 1 DATE:
This Addendum Acknowledgement Form shall be signed an authorized company representative, dated and returned with the proposal.
This Addendum now becomes a part of the original ITN.
RESPONDENT NAME:
RESPONDENT MAILING ADDRESS:
CITY – STATE – ZIP: *Authorized Representative’s Signature
PHONE NUMBER:
TOLL FREE
NUMBER:
*Name and Title of Authorized Representative
FAX NUMBER:
EMAIL ADDRESS: *This individual must have the authority to bind the
Respondent.
FEID NO.:
TYPE OF BUSINESS ENTITY (Corporation, LLC, partnership, etc.):
Date:
RON DESANTIS
Governor
CORD BYRD
Secretary of State
ADDENDUM NO. 1 TO THE FOLLOWING
INVITATION TO NEGOTIATE
PROCUREMENT, INSTALLATION, MAINTENANCE OF GENERATOR
FOR DIVISION OF CORPORATIONS
SOLICITATION NO.: DOS-ITN-23/24-034
Date: December 22, 2023
To: Prospective Respondents to Solicitation No.: DOS-ITN-23/24-034
From: Stephanie Walton, Procurement Officer
Subject: Vendor Questions and Department Responses to Questions
FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3), FLORIDA STATUTES (F.S.) (AS ALTERED BY SUBBSECTION 110.123(3)(D)4, F.S.), OR FAILURE TO POST THE
BOND OR OTHER SECURITY REQUIRED BY LAW WITHIN THE TIME ALLOWED FOR FILING A BOND
SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, F.S.
This Addendum includes the following:
1. Written Responses to Written Questions The questions are reproduced in the exact format in which they were submitted. Answers to these questions are being posted as an Addendum on the Vendor Information Portal (VIP) in accordance with Section 2.5 Timeline of Events and Addendum to Solicitation.
Questions and Responses:
Question # ITN Section
ITN
Page #
Vendor Question Department Response
1 Site Visit N/A
Could we get a copy of the last 12 months electric bills showing a KW demand or peak KW reading.
The Department will request copies of the last 12 months of utilities bills from the landlord. Copies will be emailed to the vendors who attended the mandatory site visit.
2 Site Visit N/A
The generator fuel tank will be sized for a specific run time. How many hours would you like the generator to run at 100% load during a power outage before refueling?
The generator should contain an on-site fuel tank capable of holding enough fuel for at least 72 hours of continuous operation.
3 Site Visit N/A
Will the generator require bollards along the parking lot side to protect from vehicle traffic?
The protective measures around the generator will not be addressed under this ITN.
4 Site Visit N/A
Please confirm that all Engineering, drawings and design are the responsibility of the Contractor
Yes, the contractor will be responsible for the engineering, drawings, and design for the generator.
5 Site Visit N/A Will any type of fencing be required?
The protective measures around the generator will not be addressed under this ITN.
File details come from the government source that posted it. Updated .