Pre-Advertisement Notice for DWM Peachtree Raw Water Pump Station Project

Closed State & local contract opportunity Posted

Solicitation number
PE-66062-NONST-2027-000000495
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Atlanta, Department of Watershed Management, is conducting a multi-step sealed bid process for a Progressive Design-Builder to provide design, preconstruction, and construction services for the Peachtree Raw Water Pump Station improvements, with prequalification submissions due October 30, 2026, followed by an Invitation for Bid.

Firms must demonstrate successful experience delivering Progressive Design-Build or comparable water infrastructure projects of similar size, scope, and complexity. Required capabilities include professional design and engineering expertise, construction capabilities, staffing, project management, and resources. Bidders must show ability to coordinate design and construction activities, advance project design, perform constructability and cost evaluations, and support development of a Guaranteed Maximum Price prior to construction.

The scope encompasses rehabilitation and replacement of existing pumps, improvements to Pump Buildings 1 and 2, electrical distribution system improvements, evaluation of raw water main alternatives, and development of a dedicated raw water main serving Pumps 1 and 2. The facility is a fully operational raw water intake station serving two treatment plants and must remain operational throughout construction, with brief coordinated outages permitted as necessary. Design deliverables must be completed in BIM format using Autodesk Revit across architectural, structural, process mechanical, HVAC, plumbing, and electrical disciplines. The project requires detailed topographic surveys, Subsurface Utility Engineering investigations to Quality Level B, geotechnical investigations with Standard Penetration Testing, 3D laser scanning to create Building Information Models, structural evaluation, and detailed construction sequencing. Work must comply with current Georgia Building Codes, the International Existing Building Code (2018 Edition with Georgia Amendments), City of Atlanta Standards, and industry standards including AWWA, ASME, and Hydraulic Institute guidelines. Deliverables include new vertical turbine pumps, pump refurbishment, replacement yard valves, new traveling screens, VFD and RVSS installations, and control system upgrade utilizing Rockwell Automation ControlLogix PLCs integrated with the existing Foxboro IA distributed control system. The project includes 30-day acceptance testing with contractor support during City operational responsibility transition.

A Pre-Solicitation Conference will be noticed separately to provide additional details and address questions from interested bidders.

Opportunity text

The City of Atlanta, on behalf of the Department of Watershed Management (DWM), will shortly undergo a MultiStep Sealed Bid process comprised of a prequalification phase as the initial step, followed by an Invitation for Bid (IFB), towards the procurement of a qualified Progressive Design-Builder to provide design, preconstruction, and construction services for the Peachtree Raw Water Pump Station (PRWPS) improvements. The scope includes, but is not limited to, rehabilitation and replacement of existing pumps, improvements to Pump Buildings 1 and 2, electrical distribution system improvements, evaluation of raw water main alternatives, and development of a dedicated raw water main serving Pumps 1 and 2. Interested firms during the prequalification phase must demonstrate experience and capacity successfully delivering Progressive Design-Build or comparable water infrastructure projects, including the professional design and engineering expertise, construction capabilities, staffing, project management, and resources necessary to perform work of similar size, scope, and complexity. Firms must demonstrate the ability to coordinate design and construction activities, advance the project design, perform constructability and cost evaluations, and support development of a Guaranteed Maximum Price (GMP) prior to construction. A Pre-Solicitation Conference will be noticed and held to provide more details and address questions. We hope to see you there.