Poudre River Ranch, River Run Pond Outfall Improvement
Closed State & local contract opportunity Posted
- Solicitation number
- F25-04-028
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 460 Hose, Accessories, And Supplies: Industrial, Commercial, And Garden
- 493 Laboratory Equipment, Accessories, And Supplies: Biochemistry, Chemistry, Environmental Science, Etc.
- 545 Machinery And Hardware, Industrial
- 557 Mass Transportation, Transit Bus Accessories And Parts
- 578 Miscellaneous Products (Not Otherwise Classified)
- 670 Plumbing Equipment, Fixtures, And Supplies
- 720 Pumping Equipment And Accessories
- 745 Road And Highway Building Materials, Asphaltic
- 750 Road And Highway Building Materials, Non Asphaltic
- 820 Steam And Hot Water Boilers And Steam Heating Equipment
Show all 23
- 885 Water And Wastewater Treating Chemicals
- 890 Water Supply, Groundwater, Sewage Treatment, And Related Equipment, Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water
- 906 Architectural Services, Professional
- 910 Building Maintenance, Installation And Repair Services
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 918 Consulting Services
- 925 Engineering Services, Professional
- 926 Environmental And Ecological Services
- 936 Equipment Maintenance And Repair Services For General Equipment
- 939 Equipment Maintenance And Repair Services For Computers, Office, Photographic, Radio And Television Equipment
- 959 Marine Construction And Related Services; Marine Equipment Maintenance And Repair
- 961 Miscellaneous Services, No. 1 (Not Otherwise Classified)
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Greeley, located in Weld County, Colorado, is seeking bids for the Poudre River Ranch River Run Pond Outfall Improvements Project (Bid #F25-04-028). This infrastructure project involves constructing comprehensive improvements to a detention pond located north of River Run Drive and east of N 83rd Avenue, with specific objectives including modifications to existing outlet structures, sidewalk widening, and constructing a concrete bypass structure with a gated outfall to the Poudre River. The project encompasses 21 primary bid items, including clearing and grubbing, concrete removal, excavation, slide gate installation, and concrete pavement installation. Bidders must be registered in the System for Award Management (SAM) and perform at least 48% of the contract work with their own organization. The bid evaluation will be based on three key criteria: price (65 points), schedule (25 points), and related experience (10 points). The pre-bid conference is scheduled for April 24, 2025, at 1:30 PM via Microsoft Teams, with bid submissions due on May 22, 2025, before 12:30 PM MST. The contract time is 30 calendar days from the Notice to Proceed, with substantial completion expected by June 9, 2025.
Bidders will be required to submit a 5% bid bond or certified check and provide performance and payment bonds upon contract award. The project will necessitate obtaining several permits, including a Floodplain Development Permit and a Department of the Army Nationwide Permit. While no specific set-aside designations for disadvantaged enterprises are mentioned, the project will be funded by the City of Greeley and requires compliance with City of Greeley Design Criteria and Construction Specifications, CDOT standards, and environmental regulations. The project involves work on property owned by the City of Greeley and a Drainage Easement owned by the River Run Homeowners Association. Specialized equipment for the project includes Waterman Valve slide gates, Tideflex Checkmate inline check valves, and Neenah grated manway access installations. The total estimated project value is $141,778.90, with the work involving technical infrastructure improvements designed to enhance detention pond functionality, maintenance access, and river outfall management.
Opportunity text
The City of Greeley will construct improvements to the detention pond located north of River Run Drive and east of N 83rd Avenue (County Road 27). The pond is adjacent to the northern boundary of Outlot A as indicated on the Plat for River Run at Poudre River Ranch Filing 2. The construction will include improvements to the existing outlet structures within the pond, sidewalk widening for better maintenance access, and construction of a concrete bypass structure with gated outfall to the Poudre River. A portion of the work will be done within Outlot B as shown on the River Run at Poudre River Ranch First Filing, First Replat, which is a Drainage Easement and owned by the River Run Homeowners Association. The existing detention pond and outlet structures are located on property owned by the City of Greeley.
Files
| File | Type | Posted |
|---|---|---|
| F25-04-028 BID - Poudre River Ranch - River Run Pond Outfall Improvements.pdf | ||
| PRR River Run Pond Outfall Improvements Bid Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity