Potrero Tenant Improvement and Fire Alarm Control Unit Replacement
Open State & local contract opportunity Posted
- Solicitation number
- PW 887
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Joe Chin joe.chin@sfdpw.org
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The San Francisco Department of Public Works is soliciting bids for a tenant improvement and fire alarm control unit replacement at the Mental Health Rehabilitation Center on the Zuckerberg San Francisco General Hospital campus, 887 Potrero Avenue, with bids due December 2, 2026 at 2:30 p.m. PST. The notice requires a Class "B" California contractor license to bid. All contractors and subcontractors must be registered with the Department of Industrial Relations under Labor Code Section 1725.5. The notice identifies no set-aside or preference program.
The scope includes a new nurse call communication system; conversion of isolation rooms to locked seclusion rooms with ligature-resistant features at select locations; accessibility improvements at restrooms, kitchenettes, drinking fountains, and paths of travel to ground-level exits; leveling of the main entry threshold and nearby sidewalk; and card readers at select locations. The facility-wide fire alarm work replaces components with like-for-like, new Edwards EST-4 fire alarm control units and select devices. Replaced items include remote annunciators, fire alarm boxes, smoke and duct smoke detectors, and addressable modules. New elevator shunt trip devices and heat detectors are added to the elevator system.
The estimated construction cost is approximately $5.4 million. The project allows 460 consecutive calendar days for completion, and the stated project start date is October 28, 2026. Prevailing wage, paid sick leave, and healthcare security ordinance requirements apply.
A pre-bid meeting was scheduled for November 4, 2026 at 1:00 p.m. at the project site, with attendees required to arrive by 12:50 p.m. and wear face masks. Bidders obtain project documents at no cost from the DPW Electronic Bid Documents Download Site and must monitor for addenda distributed by email to registered plan holders. Project Manager Joe Chin handles inquiries at (628) 206-7177 or Joe.Chin@sfdpw.org.
Opportunity text
This project involves multiple upgrades to the Mental Health Rehabilitation Center (MHRC) at the San Francisco Zuckerberg General Hospital campus intended to expand and improve MHRCs capacity to serve adult patients requiring intensive mental health treatment and care. The work includes upgrades to the facilitys nurse call communication system for use between nursing staff and patients requiring assistance; conversion of isolation rooms to locked seclusion rooms with ligature-resistant features at select locations; accessibility improvements at restrooms, kitchenettes, drinking fountains, and paths of travel to ground-level exits; leveling of the main entry threshold and nearby sidewalk for accessibility compliances; and installation of card readers at select locations to control access to sensitive areas. Additionally, the project includes a facility-wide fire alarm control unit replacement to replace the outdated facility-wide fire alarm components with like-for-like, new Edwards EST-4 fire alarm control units and select fire alarm devices. The system components to be replaced include remote annunciators, fire alarm boxes, smoke detectors, duct smoke detectors, and addressable modules along with new elevator shunt trip and heat detectors added to the elevator system.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity