Bid Notice.pdf
PDF 210 KB Posted
- Solicitation number
- PW 887
- Issued by
- San Francisco County, San Francisco City, California
About this file
This is a Bid Notice issued by the City and County of San Francisco, Department of Public Works (DPW), for a tenant improvement and fire alarm control unit replacement project at the Mental Health Rehabilitation Center located at 887 Potrero Avenue. The project involves comprehensive upgrades to the MHRC at San Francisco Zuckerberg General Hospital, including installation of a new nurse call communication system, conversion of isolation rooms to locked seclusion rooms with ligature-resistant features, accessibility improvements throughout the facility, leveling of entry thresholds and sidewalks for ADA compliance, installation of card readers for access control, and replacement of the facility-wide fire alarm system with new Edwards EST-4 fire alarm control units and associated components. The scope of work includes replacement of remote annunciators, fire alarm boxes, smoke detectors, duct smoke detectors, addressable modules, elevator shunt trip devices, and heat detectors. The project allows 460 consecutive calendar days for completion with an estimated construction cost of approximately $5,400,000. A pre-bid meeting is scheduled for Wednesday, November 4, 2026, at 1:00 PM at the project site, with attendees required to arrive by 12:50 PM and wear face masks during the visit. Bids are due by December 2, 2026, at 2:30 PM PST. The project start date is October 28, 2026.
A Class "B" California contractor license is required to bid on this project. All contractors and subcontractors must be registered with the Department of Industrial Relations (DIR) as required by Labor Code Section 1725.5. Bidders should obtain project documents from the DPW Electronic Bid Documents Download Site at no cost and monitor for addenda distributed via email to registered plan holders. Applicable prevailing wage, paid sick leave, and healthcare security ordinance requirements apply. The City of San Francisco is the contracting entity, and Project Manager Joe Chin can be reached at (628) 206-7177 or Joe.Chin@sfdpw.org for inquiries. No specific set-asides, incumbent information, or funding source details are identified in the bid notice.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Events Search Event :
SFGOV-
0000012033
(mailto:?subject=Sharing CCSF Event&body=I'm sharing a CCSF Event with you, you can
EXT DPW | PW 887 Ptrr Tnnt Imprv & Fire Due by: 12/02/2026 02:30 PM PST Start Date: 10/28/2026 12:00AM PDT
Details
887 Potrero Tenant Improvement and Fire Alarm Control Unit Replacement
The Scope of Work: This project involves multiple upgrades to the Mental Health Rehabilitation Center (MHRC) at the San Francisco Zuckerberg General Hospital campus intended to expand and improve MHRC’s capacity to serve adult patients requiring intensive mental health treatment and care. The work includes upgrades to the facility’s nurse call communication system for use between nursing staff and patients requiring assistance; conversion of isolation rooms to locked seclusion rooms with ligature-resistant features at select locations; accessibility improvements at restrooms, kitchenettes, drinking fountains, and paths of travel to ground-level exits; leveling of the main entry threshold and nearby sidewalk for accessibility compliances; and installation of card readers at select locations to control access to sensitive areas. Additionally, the project includes a facility-wide fire alarm control unit replacement to replace the outdated facility-wide fire alarm components with like-for-like, new Edwards EST-4 fire alarm control units and select fire alarm devices. The system components to be replaced include remote annunciators, fire alarm boxes, smoke detectors, duct smoke detectors, and addressable modules along with new elevator shunt trip and heat detectors added to the elevator system.
The time allowed for completion is 460 consecutive calendar days. The estimated construction cost is approximately $5,400,000. For more information, contact the Project Manager Joe Chin by phone:
(628) 206-7177 or email: Joe.Chin@sfdpw.org (mailto: Joe.Chin@sfdpw.org).
A pre-bid meeting has been scheduled at the project site on Wednesday, November 4, 2026, at 1:00 PM. Located at 887 Potrero Avenue, San Francisco. All attendees that will be attending the pre-bid meeting shall arrive and meet in front of the building by no later than 12:50 PM. All attendees will be escorted by City staff promptly at 1:00 PM to the meeting location inside the building. Any attendees that arrive late will need to wait for the next available City staff to escort them inside the building and to the meeting. All attendees will also be required to wear a face mask while inside the building. After the formal pre-bid presentation by the City Team, attendees will be escorted on a guided site walk by
11/2/26, 8:56 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012033&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012033&AUC_ROUND=1… 1/4 javascript:void(0);
javascript:void(0);
mailto:?subject=Sharing%20CCSF%20Event&body=I%27m%20sharing%20a%20CCSF%20Event%20with%20you,%20you%20can%20view%20it%20here:%20%20sfcitypartner.sfgov.org%2Fpages%2FEvents-BS3%2Fevent-redirect.aspx%3FeventId%3D0000012033 mailto: Joe.Chin@sfdpw.org mailto: Joe.Chin@sfdpw.org
Payment Terms
City staff through the project work area. During the site walk, photos of the facility and work area will be allowed but neither the residents at the facility nor any personal information of the residents may be photographed.
Class "B" license is required to bid.
1. DPWs Contracts & Bid Opportunities, https://bidopportunities.apps.sfdpw.org/ (https://bidopportunities.apps.sfdpw.org/): to obtain Advertisements, Tabulation of Bids, and Awards information.
2. DPW Electronic Bid Documents Download Site, https://bsm.sfdpw.org/ContractAdmin/Login.aspx (https://bsm.sfdpw.org/ContractAdmin/Login.aspx) to obtain Bid Documents, Plan Holders Lists and Addendum information; may be downloaded at no cost.
3. OLSE, http://sfgsa.org/index.aspx?page=391 (http://sfgsa.org/index.aspx?page=391): Office of Labor Standards Enforcement (OLSE) website to obtain documents distributed at the pre-bid conference and other information.
Documents include:
-Healthcare Security Ordinance
-Pre-bid and pre-construction information
-Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site.
DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.
Event ID: SFGOV-0000012033 Format/Type: Sell Event RFx Round: 1 Version: 1
My Bids: 0 Edits to Submitted Bids: Allowed Multiple Bids: Allowed
11/2/26, 8:56 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012033&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012033&AUC_ROUND=1… 2/4 https://bidopportunities.apps.sfdpw.org/ https://bidopportunities.apps.sfdpw.org/ https://bidopportunities.apps.sfdpw.org/ https://bsm.sfdpw.org/ContractAdmin/Login.aspx https://bsm.sfdpw.org/ContractAdmin/Login.aspx https://bsm.sfdpw.org/ContractAdmin/Login.aspx http://sfgsa.org/index.aspx?page=391 http://sfgsa.org/index.aspx?page=391
Bid Package
See Attachments
To ensure that your bid is successfully placed please review the attachments and submit the required documents.
Place Bid
Find Partner
View Partner Requests
Contact Information
Joe Chin Phone:
Email Joe.Chin@sfdpw.org (mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20-- %20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replace resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restro level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewa wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facil wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST- 4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system 7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on% bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A- Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A- Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20n
Requirements
Line Description Unit Requested Quantity Status
11/2/26, 8:56 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012033&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012033&AUC_ROUND=1… 3/4 mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20registered%20with%20the%20DIR%20as%20required%20by%20Labor%20Code%20section%201725.5%20%5Bwith%20limited%20exceptions%20from%20this%20requirement%20for%20bid%20purposes%20only%20under%20Labor%20Code%20section%201771.1(a)%5D.%0A%0ADISCLAIMER%3A%20The%20information%20provided%20below%20is%20a%20summary%20of%20the%20project.%20Addenda%20and%20other%20bid%20changes%20will%20be%20distributed%20by%20email%20only%20to%20Plan%20Holders%20with%20email%20addresses%2C%20and%20will%20be%20posted%20on%20the%20DPW%20Electronic%20Bid%20Documents%20Download%20Site.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.
mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20registered%20with%20the%20DIR%20as%20required%20by%20Labor%20Code%20section%201725.5%20%5Bwith%20limited%20exceptions%20from%20this%20requirement%20for%20bid%20purposes%20only%20under%20Labor%20Code%20section%201771.1(a)%5D.%0A%0ADISCLAIMER%3A%20The%20information%20provided%20below%20is%20a%20summary%20of%20the%20project.%20Addenda%20and%20other%20bid%20changes%20will%20be%20distributed%20by%20email%20only%20to%20Plan%20Holders%20with%20email%20addresses%2C%20and%20will%20be%20posted%20on%20the%20DPW%20Electronic%20Bid%20Documents%20Download%20Site.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.
mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20registered%20with%20the%20DIR%20as%20required%20by%20Labor%20Code%20section%201725.5%20%5Bwith%20limited%20exceptions%20from%20this%20requirement%20for%20bid%20purposes%20only%20under%20Labor%20Code%20section%201771.1(a)%5D.%0A%0ADISCLAIMER%3A%20The%20information%20provided%20below%20is%20a%20summary%20of%20the%20project.%20Addenda%20and%20other%20bid%20changes%20will%20be%20distributed%20by%20email%20only%20to%20Plan%20Holders%20with%20email%20addresses%2C%20and%20will%20be%20posted%20on%20the%20DPW%20Electronic%20Bid%20Documents%20Download%20Site.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.
mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20registered%20with%20the%20DIR%20as%20required%20by%20Labor%20Code%20section%201725.5%20%5Bwith%20limited%20exceptions%20from%20this%20requirement%20for%20bid%20purposes%20only%20under%20Labor%20Code%20section%201771.1(a)%5D.%0A%0ADISCLAIMER%3A%20The%20information%20provided%20below%20is%20a%20summary%20of%20the%20project.%20Addenda%20and%20other%20bid%20changes%20will%20be%20distributed%20by%20email%20only%20to%20Plan%20Holders%20with%20email%20addresses%2C%20and%20will%20be%20posted%20on%20the%20DPW%20Electronic%20Bid%20Documents%20Download%20Site.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.
mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20registered%20with%20the%20DIR%20as%20required%20by%20Labor%20Code%20section%201725.5%20%5Bwith%20limited%20exceptions%20from%20this%20requirement%20for%20bid%20purposes%20only%20under%20Labor%20Code%20section%201771.1(a)%5D.%0A%0ADISCLAIMER%3A%20The%20information%20provided%20below%20is%20a%20summary%20of%20the%20project.%20Addenda%20and%20other%20bid%20changes%20will%20be%20distributed%20by%20email%20only%20to%20Plan%20Holders%20with%20email%20addresses%2C%20and%20will%20be%20posted%20on%20the%20DPW%20Electronic%20Bid%20Documents%20Download%20Site.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.
mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20registered%20with%20the%20DIR%20as%20required%20by%20Labor%20Code%20section%201725.5%20%5Bwith%20limited%20exceptions%20from%20this%20requirement%20for%20bid%20purposes%20only%20under%20Labor%20Code%20section%201771.1(a)%5D.%0A%0ADISCLAIMER%3A%20The%20information%20provided%20below%20is%20a%20summary%20of%20the%20project.%20Addenda%20and%20other%20bid%20changes%20will%20be%20distributed%20by%20email%20only%20to%20Plan%20Holders%20with%20email%20addresses%2C%20and%20will%20be%20posted%20on%20the%20DPW%20Electronic%20Bid%20Documents%20Download%20Site.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.
mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20registered%20with%20the%20DIR%20as%20required%20by%20Labor%20Code%20section%201725.5%20%5Bwith%20limited%20exceptions%20from%20this%20requirement%20for%20bid%20purposes%20only%20under%20Labor%20Code%20section%201771.1(a)%5D.%0A%0ADISCLAIMER%3A%20The%20information%20provided%20below%20is%20a%20summary%20of%20the%20project.%20Addenda%20and%20other%20bid%20changes%20will%20be%20distributed%20by%20email%20only%20to%20Plan%20Holders%20with%20email%20addresses%2C%20and%20will%20be%20posted%20on%20the%20DPW%20Electronic%20Bid%20Documents%20Download%20Site.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.
mailto:Joe.Chin@sfdpw.org?subject=SFGOV-0000012033%20--%20887%20Potrero%20Tenant%20Improvement%20and%20Fire%20Alarm%20Control%20Unit%20Replacement%0A%0AThe%20Scope%20of%20Work%3A%C2%A0%20This%20project%20involves%20multiple%20upgrades%20to%20the%20Mental%20Health%20Rehabilitation%20Center%20(MHRC)%20at%20the%20San%20Francisco%20Zuckerberg%20General%20Hospital%20campus%20intended%20to%20expand%20and%20improve%20MHRC%E2%80%99s%20capacity%20to%20serve%20adult%20patients%20requiring%20intensive%20mental%20health%20treatment%20and%20care.%20The%20work%20includes%20upgrades%20to%20the%20facility%E2%80%99s%20nurse%20call%20communication%20system%20for%20use%20between%20nursing%20staff%20and%20patients%20requiring%20assistance%3B%20conversion%20of%20isolation%20rooms%20to%20locked%20seclusion%20rooms%20with%20ligature-resistant%20features%20at%20select%20locations%3B%20accessibility%20improvements%20at%20restrooms%2C%20kitchenettes%2C%20drinking%20fountains%2C%20and%20paths%20of%20travel%20to%20ground-level%20exits%3B%20leveling%20of%20the%20main%20entry%20threshold%20and%20nearby%20sidewalk%20for%20accessibility%20compliances%3B%20and%20installation%20of%20card%20readers%20at%20select%20locations%20to%20control%20access%20to%20sensitive%20areas.%20Additionally%2C%20the%20project%20includes%20a%20facility-wide%20fire%20alarm%20control%20unit%20replacement%20to%20replace%20the%20outdated%20facility-wide%20fire%20alarm%20components%20with%20like-for-like%2C%20new%20Edwards%20EST-4%20fire%20alarm%20control%20units%20and%20select%20fire%20alarm%20devices.%20The%20system%20components%20to%20be%20replaced%20include%20remote%20annunciators%2C%20fire%20alarm%20boxes%2C%20smoke%20detectors%2C%20duct%20smoke%20detectors%2C%20and%20addressable%20modules%20along%20with%20new%20elevator%20shunt%20trip%20and%20heat%20detectors%20added%20to%20the%20elevator%20system.%0A%20%0AThe%20time%20allowed%20for%20completion%20is%20460%20consecutive%20calendar%20days.%20The%20estimated%20construction%20cost%20is%20approximately%20%245%2C400%2C000.%20For%20more%20information%2C%20contact%20the%20Project%20Manager%20Joe%20Chin%20by%20phone%3A%20(628)%20206-7177%20or%20email%3A%20Joe.Chin%40sfdpw.org.%0A%0AA%20pre-bid%20meeting%20has%20been%20scheduled%20at%20the%20project%20site%20on%20Wednesday%2C%20November%204%2C%202026%2C%20at%201%3A00%20PM.%20Located%20at%20887%20Potrero%20Avenue%2C%20San%20Francisco.%20All%20attendees%20that%20will%20be%20attending%20the%20pre-bid%20meeting%20shall%20arrive%20and%20meet%20in%20front%20of%20the%20building%20by%20no%20later%20than%2012%3A50%20PM.%20All%20attendees%20will%20be%20escorted%20by%20City%20staff%20promptly%20at%201%3A00%20PM%20to%20the%20meeting%20location%20inside%20the%20building.%20Any%20attendees%20that%20arrive%20late%20will%20need%20to%20wait%20for%20the%20next%20available%20City%20staff%20to%20escort%20them%20inside%20the%20building%20and%20to%20the%20meeting.%20All%20attendees%20will%20also%20be%20required%20to%20wear%20a%20face%20mask%20while%20inside%20the%20building.%20After%20the%20formal%20pre-bid%20presentation%20by%20the%20City%20Team%2C%20attendees%20will%20be%20escorted%20on%20a%20guided%20site%20walk%20by%20City%20staff%20through%20the%20project%20work%20area.%20During%20the%20site%20walk%2C%20photos%20of%20the%20facility%20and%20work%20area%20will%20be%20allowed%20but%20neither%20the%20residents%20at%20the%20facility%20nor%20any%20personal%20information%20of%20the%20residents%20may%20be%20photographed.%0A%0AClass%20%22B%22%20license%20is%20required%20to%20bid.%0A%0A1.%20DPWs%20Contracts%20%26%20Bid%20Opportunities%2C%20https%3A%2F%2Fbidopportunities.apps.sfdpw.org%2F%3A%20to%20obtain%20Advertisements%2C%20Tabulation%20of%20Bids%2C%20and%20Awards%20information.%0A%0A2.%20DPW%20Electronic%20Bid%20Documents%20Download%20Site%2C%20https%3A%2F%2Fbsm.sfdpw.org%2FContractAdmin%2FLogin.aspx%20to%20obtain%20Bid%20Documents%2C%20Plan%20Holders%20Lists%20and%20Addendum%20information%3B%20may%20be%20downloaded%20at%20no%20cost.%0A%0A3.%20OLSE%2C%20http%3A%2F%2Fsfgsa.org%2Findex.aspx%3Fpage%3D391%3A%20Office%20of%20Labor%20Standards%20Enforcement%20(OLSE)%20website%20to%20obtain%20documents%20distributed%20at%20the%20pre-bid%20conference%20and%20other%20information.%0A%0ADocuments%20include%3A%0A%0A-Healthcare%20Security%20Ordinance%0A%0A-Pre-bid%20and%20pre-construction%20information%0A%0A-Paid%20Sick%20Leave%20Ordinance%20Fact%20Sheet%20Effective%20March%201%2C%202015%2C%20no%20contractor%20or%20subcontractor%20may%20be%20listed%20in%20a%20bid%20for%20a%20public%20works%20project%20unless%20…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .