Pmaa-2016-sela-construct concrete walls, curbs and flatwork
Awarded State & local contract opportunity Posted
- Solicitation number
- DQ1 PMAA 2016001009 3
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Raven Lopez raevena.lopez@state.co.us (303) 866-3292
Updated .
About this opportunity
Colorado Parks and Wildlife, Southeast Regional Office, is soliciting competitive bids for concrete construction work at Lathrop State Park's Martin Beach Boat Ramp and Day Use Area located west of Walsenburg in Kit Carson County. This invitation for bids encompasses the construction of concrete walls, curbs, and flatwork, including a shoreline retaining wall installation, island curb reconfiguration, site improvements, and associated site restoration activities. The project scope includes ten line items: mobilization, geotechnical engineering services for material testing (sub-grade compaction, asphalt compaction, and concrete strength testing), demolition, earthwork, turf removal and replacement, aggregate base course (34 tons), concrete paving (100 square feet of 5-inch thick concrete), concrete retaining walls (37 cubic yards with epoxy-coated rebar), concrete curb and gutter (70 linear feet), and asphalt paving (103 square yards). Contractors must provide surveying and staking, verify and protect existing utilities, maintain traffic flow, manage debris removal and disposal, achieve specified soil compaction standards (95% Standard Proctor for structures and flatwork; 90% for other areas), obtain required permits, and ensure all work complies with Colorado Department of Transportation 2012 Construction Standards and Specifications, OSHA requirements, and state and local safety codes. The mandatory pre-bid meeting was held on February 18, 2016, at 10:00 a.m. at the Lathrop State Park Visitor Center with three contractors in attendance. Written questions were due by February 25, 2016, and sealed bids were due on February 29, 2016, at 1:00 p.m. Work must be completed within 60 calendar days from the Notice to Proceed, with a project completion deadline of May 15, 2016, and liquidated damages assessed at $150 per day for delays beyond contract time.
The solicitation does not identify any set-aside designations or restrictions specific to disadvantaged enterprises or minority-owned businesses. No incumbent vendors or current contractors are referenced in the available documentation. The contract award will be made to the lowest responsive bidder, provided the total bid amount falls within available funding; however, specific budget figures or award value ranges are not disclosed in the procurement documents. Successful contractors must obtain proper insurance coverage including Workers' Compensation, Commercial General Liability with $1,000,000 per-occurrence limits, and Automobile Liability with $1,000,000 combined single limits, with the State of Colorado named as an additional insured. Performance and payment bonds equal to 100 percent of the contract amount may be required if the project value exceeds $100,000, though the specific threshold for this project is not explicitly stated in the available documents. Colorado Parks and Wildlife is exempt from sales tax under Colorado Revised Statutes 39-26-114, and all contractors are responsible for all project costs including materials, labor, equipment, permits, utility protection, property damage repairs, and surface maintenance.
Files
| File | Type | Posted |
|---|---|---|
| Bid Documents.pdf | ||
| ADDENDUM 1.pdf | ||
| Bid Plans.pdf | ||
| ATTENDANCE LIST FOR THE PRE BID.pdf | ||
| ADDENDUM 2.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity