The State of Delaware is requesting bids for complete demolition and removal of nine buildings at the former Plummer Community Corrections Center, with bids due November 23, 2026.

The scope includes demolition of all nine existing structures, associated foundations, footings, concrete slabs, and below-grade construction. All demolition debris must be removed from the site and disposed of in accordance with applicable regulations. Existing site utilities must be disconnected, cut, and permanently capped at or immediately adjacent to each building; however, existing site utility distribution systems remain in place and are not to be disturbed. All existing site improvements — asphalt paving, roadways, parking areas, sidewalks, curbing, and perimeter fencing — must remain and be protected throughout demolition activities. Following demolition, building excavations shall be backfilled and rough graded to provide safe, stable, and properly draining conditions. Comprehensive site grading, paving replacement, landscaping, and site redevelopment are not included. Hazardous and regulated material abatement will be completed by others prior to demolition.

No estimated contract value, contract term, evaluation criteria, pre-bid meeting, or question deadline is specified in the posting.

Opportunity text

The project generally consists of the complete demolition and removal of nine (9) existing buildings at the former Plummer Community Corrections Center, including all associated building foundations, footings, concrete slabs, and below-grade building construction. All demolition debris shall be removed from the site and disposed of in accordance with applicable regulations. Existing site utilities shall be disconnected, cut, and permanently capped at or immediately adjacent to each building. Existing site utility distribution systems shall remain in place. All existing site improvements, including asphalt paving, roadways, parking areas, sidewalks, curbing, and perimeter fencing, shall remain and be protected throughout demolition activities. Following demolition, building excavations shall be backfilled and rough graded to provide safe, stable, and properly draining conditions. Comprehensive site grading, paving replacement, landscaping, and site redevelopment are not included in the project scope. Hazardous and regulated material abatement will be completed by others prior to demolition.