Phifer Hall - Chiller Replacement

Closed State & local contract opportunity Posted

Solicitation number
132-132-WPCC053124
State
North Carolina
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from evp.nc.gov. Updated .

About this opportunity

The state and local contracting opportunity is for the design and construction administration services related to the Phifer Hall Chiller Replacement project at Western Piedmont Community College in Burke County, North Carolina. The project requires designing a system to replace the current air-cooled chiller system and associated equipment, including outlining the DDC controls integration with the existing WPCC system. The scope of work includes assessing the current system, developing options for improved service, creating drawings for the desired solution, generating the scope of work and bidding documents, providing construction monitoring and inspections, issuing any necessary addenda, and delivering close-out documents and prints. The work should also evaluate the feasibility of a spare chill water pump and the advantages of tying into the WPCC's current systems or developing a stand-alone unit. Interested firms must submit a Letter of Interest and their Standard Form 254 by June 13, 2024. The selection will be based on factors such as relevant expertise, past performance, staffing, current workload, design approach, cost and schedule experience, construction administration capabilities, and familiarity with the local area. The project budget is to be determined and will be funded by county (local) funds.

The contracting opportunity does not specify any set-aside designations or restrictions on the types of organizations that can respond. The incumbent vendor or current contractor is not mentioned. The project will require integration with the existing WPCC systems. The project budget is to be determined, but the funding source is identified as county (local) funds.

Opportunity text

Design a system to replace the current air-cooled chiller system and associated equipment and outline DDC controls with WPCC existing system in the Phifer Hall building on the Western Piedmont Community College main campus. The project will require an assessment of the current system, options for improved service, drawings for the desired solution, develop scope of work and bidding documents, construction monitoring and inspections, any addendums needed, and close out documents and prints. The work should also evaluate a spare pump for chill water and/or advantages of tying into the WPCC current systems or develop a stand along unit.

Files

File Type Posted
Advertisement for Mechanical-Electrical Services.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity