Wicomico County Public Schools is soliciting competitive proposals to replace the Network 8000 HVAC controls at Pemberton Elementary School in Salisbury, Maryland, with a fully BACnet-integrated building automation system, with a site walk-through on December 9, 2026 and sealed proposals due December 22, 2026 at 2:00 p.m. Eastern. No set-aside is established, though certified Minority Business Enterprises are encouraged to respond without an MBE Plan requirement. The project is funded by a Maryland Energy Administration grant subject to a locality provision requiring at least 80 percent of workers to reside in Maryland or within 50 miles of its borders.

The scope covers controller replacement and demolition across boiler, ventilation, domestic hot water, chilled water, and kitchen ventilation systems, plus 2 air handling units, 46 variable air volume units, 4 rooftop units, 8 unit ventilators, and 5 fan coil units. Work includes lighting control integration, field sensors for space temperature, duct, flow, and differential pressure, replacement of valve and damper actuators with proportional actuators (Schneider MS51-7103-105 or equivalent), BACnet/IP network infrastructure, system programming and graphics, and training. The contractor must also provide energy modeling to quantify savings for utility incentive applications and furnish specified workers' compensation, commercial general liability, and business automobile liability coverage.

Pricing is a lump-sum base bid with detailed line-item breakdowns and three add alternates: an advanced facility-wide space sensor upgrade combining temperature, relative humidity, and CO2 sensors; core system active reheat dehumidification and demand-controlled ventilation sequences; and B-Wing micro-climate sequences with ceiling dehumidifier integration. Pricing excludes federal excise and state sales and use taxes. Evaluation uses a Best Value determination weighted as Pricing (30 points), Technical Adherence and Compliance (30 points), Timeline and Construction Schedule (15 points), K-12 Project Experience (15 points), and Energy Modeling and Incentive Support (10 points).

Work must finish during summer 2027, with the facility fully operational before the 2027-2028 academic year and the contract running from award through August 26, 2027. Options cover one three-year term and two one-year terms for maintenance and warranty work, subject to mutual agreement. Liquidated damages of up to $1,500 per calendar day may apply to contractor-caused delays, and the contractor guarantees workmanship and materials for two years from final acceptance.

Opportunity text

Wicomico County Public Schools (WCPS) is seeking competitive proposals to replace the existing Network 8000 HVAC Controls system at Pemberton Elementary School with a modern, fully BACNET integrated building automation system (BAS).

Files

File Type Posted
855216hvacWcps.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors