This is a Request for Proposal (RFP) issued by the Wicomico County Public Schools (WCPS) Purchasing Division for the replacement of the existing Network 8000 HVAC Controls system at Pemberton Elementary School with a modern, fully BACnet-integrated building automation system (BAS). The scope of work includes controller replacement and demolition for boiler systems, ventilation, domestic hot water, chilled water systems, air handling units (2 AHUs), variable air volume units (46 VAVs), rooftop units (4 RTUs), kitchen ventilation, unit ventilators (8 UVs), and fan coil units (5 FCUs); lighting control integration; installation of field sensors including space temperature, duct, flow, and differential pressure sensors; complete replacement of all existing valve and damper actuators with proportional actuators (Schneider MS51-7103-105 or equivalent); network infrastructure with BACnet/IP ethernet; system programming and graphics; and comprehensive system training. A site walk-through is scheduled for December 9, 2026, at 4:00 PM at Pemberton Elementary School, 1300 Pemberton Drive, Salisbury, MD 21801. Sealed proposals are due December 22, 2026, by 2:00 PM EST and must be submitted electronically through the Bonfire portal. All work must be completed during the summer of 2027, with the facility fully operational prior to the 2027-2028 academic year. The contract period begins upon award and continues until project completion on or before August 26, 2027, with options for one three-year term and two additional one-year options for maintenance and warranty work, all subject to mutual agreement.

The RFP requires a lump-sum base bid with detailed line-item breakdowns and includes three special add alternates: Advanced Facility-Wide Space Sensor Upgrade (combining temperature, relative humidity, and CO2 sensors), Core System Active Reheat Dehumidification and Demand-Controlled Ventilation Logic Sequences, and B-Wing Micro-Climate Sequences with ceiling dehumidifier integration. Pricing excludes federal excise and state sales and use taxes, with WCPS providing exemption certificates upon request. No set-asides are explicitly established, though certified Minority Business Enterprises are encouraged to respond without an MBE Plan requirement. The project is funded by a Maryland Energy Administration grant subject to the locality provision requiring at least 80 percent of workers to reside in Maryland or within 50 miles of Maryland's borders. Evaluation will follow a "Best Value" determination with scoring criteria weighted as follows: Technical Adherence and Compliance (30 points), Timeline and Construction Schedule (15 points), K-12 Project Experience (15 points), Energy Modeling and Incentive Support (10 points), and Pricing (30 points). The contractor must provide comprehensive energy modeling services to quantify projected savings for utility incentive applications and furnish all required insurance documentation, including workers' compensation ($100,000/$100,000/$500,000), commercial general liability ($2,000,000 each occurrence), and business automobile liability ($2,000,000 combined single limit). Liquidated damages of up to $1,500 per calendar day may be imposed for contractor-caused delays, and the contractor guarantees work against defects in materials and workmanship for two years from final acceptance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wicomico County Public Schools (WCPS) prohibits illegal discrimination based on race, ethnicity, color, ancestry, national origin, religion, immigration status, sex, gender, gender identity, gender expression, sexual orientation, family/parental status, marital status, age, physical or mental disability, poverty and socioeconomic status, language, or other legally or constitutionally protected attributes or affiliations and provides equal access to the Boy Scouts and other designated youth groups. Discrimination undermines our community’s long-standing efforts to create, foster, and promote equity, inclusion, and acceptance for all.

RFP 91036-271

PEMBERTON ELEMENTARY SCHOOL

HVAC NETWORK CONTROLS

Published by:

Wicomico County Public Schools Purchasing Division purchasing@mywcps.org mailto:purchasing@mywcps.org

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS TOC -1

TABLE OF CONTENTS

PROPOSAL DOCUMENTS

The RFP Documents consist of the following:

00030 – Notice to Proposers

00090 – Instruction to Proposers

00095 – Specifications and Scope of Work

00100 – General Conditions

00110 – Supplementary Conditions

00111 – Technical Proposal Instructions

00201 – Technical Proposal Form (Separate Writable PDF)

00301A – Proposal Pricing Form (Separate Writable PDF)

00301B – Proposal Pricing Sheet (Separate Writable Excel spreadsheet)

Attachment A – Project References (Separate Writable PDF)

Attachment B – Bid/Proposal Affidavit (Separate Writable PDF)

EXHIBIT A – Existing ATC Drawings

EXHIBIT B – 2019 Chiller Replacement Documentation

EXHIBIT C – Current Controls Pics

EXHIBIT D – Pemberton First Floor Plan & Exterior Door Numbers 8-20-2025

Business Support Services

NOTICE TO PROPOSERS

The Board of Education of Wicomico County will receive sealed Proposals for RFP 91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS on December 22, 2026, by 2:00 PM EST.

A site walk-through will be held on December 9, 2026, at 4:00 PM at Pemberton Elementary School, 1300 Pemberton Dr, Salisbury, MD 21801.

Brief Description of Work:

Wicomico County Public Schools (WCPS) is seeking competitive proposals to replace the existing Network 8000 HVAC Controls system at Pemberton Elementary School with a modern, fully BACNET integrated building automation system (BAS).

Proposal responses must be submitted registered vendors electronically at:

Euna/Bonfire Registration and Portal Access:

https://wicomicoschools.bonfirehub.com/portal/?tab=openOpportunities

No Proposer may withdraw their Proposal prior to ninety (90) days of the date and time of RFP opening. The Board of Education may extend the time and place for the opening of Proposals by notification via addendum in the above designated portal.

The Board of Education of Wicomico County reserves the right to reject any or all Proposals and waive formalities, informalities, and technicalities therein. The Board reserves the right to contact a Respondent for clarifications and may, at its sole discretion, allow a Respondent to correct any and all formalities, informalities and technicalities in the best interest of the Board.

Certified Minority Business Enterprises (MBE) are encouraged to respond to this solicitation notice, but an MBE Plan is not required.

Rick D Konrad Rick D Konrad, NIGP-CPP Procurement Manager rkonrad@mywcps.org https://wicomicoschools.bonfirehub.com/portal/?tab=openOpportunities

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00090-1

INSTRUCTIONS TO PROPOSERS

1. QUESTIONS & CLARIFICATIONS

A. If any person who contemplates submitting an offer is in doubt as to the true meaning of any part of the Terms and Conditions, Proposal Documents, and/or Request for Proposal (RFP), they may submit a written request for an interpretation thereof, delivered to purchasing@mywcps.org with a cc to rkonrad@mywcps.org no fewer than seven (7) working days by 4:00 PM EST prior to the time and date the offers are due. Answers will be provided within three (3) working days of the solicitation deadline.

B. WCPS will not be responsible for any other interpretations or explanations of the

Terms, Conditions, and Specifications that are not provided in writing via addendum.

2. EXCEPTIONS

A. It shall be the responsibility of the Contractor to include with their Proposal a list of exceptions of any deviations from or qualifications of the Terms and Conditions and Specifications.

B. The list must be attached to the Proposal Form - Price.

C. WCPS will not negotiate exceptions after the submission of the Proposal.

D. Failure to provide a list of all exceptions may result in withdrawal of award.

3. INTERPRETATION OF THE TERM "EQUAL"

The WCPS reserves the right to evaluate the quality of articles offered as alternate or equal, and reserves the right to reject any or all articles judged not equal.

4. DETERMINATION OF GRADE OR QUALITY

WCPS reserves the right to award an item to other than the lowest price Proposal if, in its judgment, there is sufficient reason to believe that another item is a better grade, quality or that it will better serve the interests of the Board, whether based on product samples, objective test, subjective test, or experience.

5. EVALUATION OF PROPOSALS

The Procurement Office may request additional documentation during the evaluation of Proposals. This additional information may include, but is not limited to, the following:

A. Schedule of Values.

B. List of sub-contactors.

C. Evidence of licensing of Prime contractor and sub-contractors.

D. Evidence of insurance, bonding, etc.

6. PROPOSAL SUBMISSIONS

mailto:rkonrad@mywcps.org

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00090-2

All Proposals must be submitted as per below and must include the Techincial Proposal Form and Pricing Proposal Form included in the RFP Documents signed by an officer capable of committing the respondant to contractual relationships.

A. Any Proposal may be withdrawn prior to the RFP’s due date and time; however, all

Proposals are considered final after the date and time for receipt of Proposals. Final Proposals may not be altered, withdrawn, or canceled, for a period of 90 days after the time and date designated for receipt of Proposals.

B. Proposals must be delivered to the Purchasing Department via the submission portal mentioned in the Notice to Proposers.

C. Technical and Price Proposals shall be submitted separately in one (1) PDF file for each Form in the correct slot.

1) The Technical Proposal file shall include the following:

a. Cover letter

b. Project Narrative

c. Project Experience

d. Technical Proposal Form (signed)

2) The Pricing Proposal Form file shall include the following:

a. Price Sheet

b. Pricing Proposal Form (Signed)

D. There will be separate slots for submitting the following files:

1) Bid/Proposal Affidavit

2) Cut Sheets

3) Attachment A - References

E. Proposal submissions WILL NOT be accepted through eMaryland Marketplace, fax, email, or regular mail.

7. BID/PROPOSAL/CONTRACT AFFIDAVIT

In accordance with the State Procurement Regulation Mandatory Written Solicitation Requirements, CoMar 21.505.08.07, this Proposal requires a signed Proposal Affidavit.

A. This affidavit is submitted in the designated RFP slot in the Portal.

B. Submissions without this document may be considered non-responsive.

8. TAXES

A. Nothing in these Terms and Conditions and Specifications shall be construed as relieving the Contractor of his responsibilities in paying all applicable taxes.

B. Sales of materials used to improve the realty of government entities are taxable. The Maryland Sales and Use Tax Exemption Certificate of the Wicomico County Board of Education should not be used by contractors performing such work.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00090-3

9. MINORITY BUSINESS ENTERPRISE PROCEDURES

A. The Wicomico County Public Schools encourages all qualified Minority Business

Enterprises (MBE) to apply for certification with the Maryland Department of Transportation (MDOT).

B. All qualified MDOT Certified MBE’s are encouraged to respond to this solicitation notice.

C. An MBE Plan is not required for this RFP.

END OF SECTION

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 01000 - 1

SPECIFICATIONS AND SCOPE OF WORK

1. SPECIFICATIONS

Request for Proposal (RFP) Pemberton Elementary School BAS Upgrade Owner:

Wicomico County Board of Education (WCBOE)

Project Location: Pemberton Elementary School, 1300 Pemberton Drive, Salisbury, MD 21801

A. Project Overview

Wicomico County Public Schools (WCPS) is seeking competitive proposals to replace the existing Network 8000 HVAC Controls system at Pemberton Elementary School with a modern, fully BACNET integrated building automation system (BAS).

B. Scope of Work (SoW)

1) Controller Replacement & Demolition: The contractor shall provide, program, and install new controls hardware to replace the existing legacy controllers.

Existing control panels may be reused if new controllers fit inside.

a. Heating Water & Boiler System: Replace existing equipment with appropriately sized networked controllers to handle all required inputs/outputs. This includes control for Boilers B-1 and B-2, primary pumps (P-1, P-2), and secondary hot water pumps with VFDs (P-3A, P-3B).

b. Ventilation & Domestic Hot Water (DHW): Upgrade controls for Ventilation Fan VF-1, combustion dampers (D-1), DHW heaters 1 & 2, and associated circulating pumps.

c. Chilled Water System: Upgrade controls for the chilled water system, including chillers, primary/secondary chilled water pumps, and associated isolation valves. System must integrate with the global outside air temperature sensor to manage chill/heat changeovers and lockout setpoints.

d. Air Handling Units (AHUs 1 & 2): Provide new controllers for AHUs 1 & 2 to manage supply and return fan speeds, mixed air dampers, cooling/heating coil valves, and duct static pressure.

e. Variable Air Volume Units (46 VAVs): Furnish and install new controllers for all 46 VAV units.

f. Roof Top Units (RTUs 1–4): Install modern BAS controllers for RTUs 1 through 4 to manage heating, cooling, economizer damper operations, and supply fan control.

g. Kitchen Ventilation: Upgrade controls for the kitchen ventilation system, including makeup air units and exhaust fans.

h. Unit Ventilators (8 UVs): Replace controllers for all 8 UVs.

i. Fan Coil Units (5 FCUs): Provide new controllers for the 5 FCUs.

j. Area A & B Ventilation: Replace existing legacy controllers for all ventilation equipment serving Areas A & B.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 01000 - 2

k. Demolition: Complete demolition and proper disposal of the existing legacy control system components. (Note: WCPS personnel will evaluate the existing components and determine which of the newer existing actuators and controllers must be salvaged and returned to WCPS inventory. All other materials shall be properly disposed of by the contractor).

2) Lighting Controls: The contractor shall integrate the facility's existing lighting controls into the BAS. Hardware drops, necessary relays, and BACnet integration required to support centralized control are the responsibility of the contractor.

3) End Devices, Valves, and Actuators

a. Field Sensors: Install new space temperature sensors, duct sensors, flow switches, differential pressure sensors, immersion temperature sensors, and freezer/refrigerator temperature sensors. Include a global outside air temperature sensor to energize the heating system when temperatures fall below 60°F. (Note: Advanced humidity/CO2 sensors are requested under Add Alternate 1).

b. Actuator Replacement (All Systems): All existing actuators across the facility must be replaced with new electronic actuators. This applies to 100% of valve actuators and damper actuators serving AHUs, RTUs, VAVs, UVs, FCUs, boiler/chiller loops, and ventilation systems.

2.1 Actuator Specification: For all VAV reheat valves and any other valves operated by the system, the contractor must furnish and install proportional actuators (specifically Schneider MS51-7103-105 or strictly equivalent proportional models). Floating actuators will not be accepted.

c. ATC Valves: The contractor shall inspect all existing Automatic Temperature Control (ATC) valves and replace the packings on any valves found to be leaking.

d. Dampers: Existing dampers are to remain in place.

4) Network, Software, and Integration

a. Reuse existing control wiring where possible. Install a new BACnet/IP ethernet local area network between the new controllers. All system input wiring to controllers must be shielded.

b. Data Archiving: The contractor shall configure the Building Automation System (BAS) to continuously collect, archive, and manage historical data and trend logs for all integrated mechanical equipment. The archiving strategy must support comprehensive runtime analytics, fault detection, and sensor history. The data retention should be at least 1 month.

c. Programming & Graphics: Full programming of new controllers and associated equipment is required. Update system and floor plan graphics to accurately reflect current school room numbers.

d. Sensor Drops: Implement data drops as needed for smart space sensors.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 01000 - 3

5) BAS Programming & System Integration

a. Setpoints & Global Control: Implement standardized WCPS setpoints across all mechanical equipment, allowing authorized personnel to globally adjust or override local setpoints. The DHW system must be configured to maintain a 140°F storage tank temperature. The system should respond to Global Commands issued by the primary controller located in the WCPS Facility Operations building (BACNET Obj ID: 510000)

b. WCPS Occupancy Scheduling/Setpoints: System shall be programmed in line with the WCPS approved occupancy scheduling: Monday – Friday 6AM- 6PM. In addition to corresponding with the unoccupied/occupied setpoints:

c. WCPS Events System Integration: System should allow for integration with

WCPS Mazevo Event Management System to allow equipment to be enabled outside of WCPS standard schedule to accommodate after hours events. Mazevo utilizes an API connection to interface with a locally hosted program, events2HVAC to schedule HVAC/lighting for events scheduled during unoccupied hours.

d. System Training and Technical Documentation: Following successful facility commissioning and prior to contract closeout, the awarded Contractor shall provide comprehensive operation and maintenance training sessions for designated Wicomico County Public Schools (WCPS) facility managers, energy managers, and technical maintenance personnel. The pricing proposal must include at least one complete, on-site dedicated training block combining structural classroom instruction and practical field walkthroughs with relevant WCPS personnel.

This curriculum must deliver an exhaustive system overview detailing the new BACnet backbone architecture, specific hardware controller layouts, override protocols, safety parameter profiles, dynamic graphics navigation, and localized diagnostic tracking strategies. The Contractor shall deliver all master user manuals, final as-built control diagrams, controller admin credentials, point schedules, and operational sequences in both indexed hardcopy binders and organized digital formats prior to scheduling this instructional session.

6) Energy Modeling and Utility Incentive Support

OCCUPIED SETPOINTS UNOCCUPIED SETPOINTS

COOLING: 72° - 76° F COOLING: 74° F

HEATING: 68 - 72° F HEATING: 70° F

https://mymazevo.com/

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 01000 - 4

Proposed Modeling: The awarded Contractor shall provide comprehensive energy modeling services associated with the proposed upgrades to the building automation control systems, valves, and actuators. The express intent of this energy modeling is to quantify projected energy savings to apply for and secure commercial energy efficiency incentives from the local utility provider. WCPS project manager will provide site baselines for historical consumption

7) Alarm Requirements:

a. The Contractor shall engineer, configure, and deploy a comprehensive system alarm topology within the building automation system (BAS) to continuously monitor core mechanical plant stability, distribution loop parameters, and domestic water safety boundaries.

b. All designated hardware alarms shall be programmed to track and report operating states; example parameters specified in the table below. To eliminate transient nuisance alerts, the Contractor must implement software-defined time delay windows before an alarm is officially committed and broadcasted.

c. Critical safety interlock dropouts and flame protection failures must generate instantaneous system alarms, automatically trigger lead/lag equipment rotation where applicable, and safely isolate affected fuel lines or electrical components. High-priority maintenance and operating alarms shall trigger targeted graphic flag indications on the centralized master system workstation, log entries directly to the local chronological event database, and initiate immediate notification protocols to designated WCPS Facility Operations personnel.

d. The BAS network architecture must be fully configured to automatically generate and route real-time alarm alert emails directly to specific staff and administrators as designated by WCPS, with notification distribution routing grouped dynamically according to the underlying severity level of the system exception.

EXAMPLE OF DESIRED ALARMS (COORDINATE WITH WCPS FOR FINAL):

See next page…

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 01000 - 5

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 01000 - 6

C. Project Schedule, Period of Performance, and Grant Provision

1) Construction Window: The Contractor must execute all on-site demolition, installation of control systems, valves, and actuators, and system commissioning exclusively during the summer of 2027. The facility must be fully operational and turned over prior to the start of the 2027–2028 academic year.

2) Work Hours and Coordination: Standard facility access hours will be Monday – Friday 7:00 AM to 4:00 PM, excluding holidays or emergency closures. The Contractor must closely coordinate all shutdowns, staging, and building access with the WCPS Project Manager. Any requirements outside of the standard schedule will require the contractor to provide the WCPS project manager with at least 48 hours’ notice prior.

3) MEA Grant Locality Requirement: This project is funded by a Maryland Energy Administration grant and subject to the following locality provision:

The Grant shall comply with State Government Article § 9-20B-05, Annotated of Maryland, which requires that at least 80 percent of workers participating in a project or program that receives money from the SEIF must reside within 50 miles of the project or program. As the Program is a statewide program, MEA will determine compliance based on whether at least 80 percent of worksite workers reside in Maryland, or within 50 miles of Maryland's borders.

D. Proposal Submission Requirements

1) Base Bid (Lump Sum): Total cost for the complete BAS upgrade

2) Detailed SoW: Line-item breakdown of proposed work.

3) Technical specifications and/or cutsheets for all proposed equipment: The proposal must include formal technical documentation for all proposed hardware and software to ensure compliance with the system requirements.

4) Project Timeline: Bidders must submit a detailed project schedule outlining critical milestones from contract award through final completion. The timeline must strictly adhere to the requirement that all on-site demolition, installation, and system commissioning occur exclusively during the summer of 2027.

5) Add Alternate 1 - Advanced Sensors: Substitute standard space temperature sensors with combination Temperature / Relative Humidity (RH) / Carbon Dioxide sensors across all primary zones.

6) ADD Alternate 2 - Dehumidification & Demand-Controlled Ventilation Sequences (excluding B-Wing)

a. Prerequisite: Requires the concurrent selection or presence of the advanced sensor hardware described in Add Alternate 1.

b. Additional Sensors: Provide and install additional ductwork humidity sensors in the supply air streams of all primary Air Handling Units (AHUs 1 & 2) and Rooftop Units (RTUs 1–4).

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 01000 - 7

c. Programming Sequence: Program the BAS to continuously monitor and average zone CO2 levels among corresponding areas. Outside air dampers must dynamically modulate based on these averages to optimize indoor air quality via demand-controlled ventilation (DCV) algorithms.

Upon a call for dehumidification from a zone or duct moisture sensor exceeding setpoint, the supplying unit (AHU/RTU) shall modulate its cooling coil to remove moisture. Concurrently, the system shall modulate the unit's heating coil to provide active proportional reheat, maintaining exact space temperature setpoints while lowering relative humidity. Floating actuator operations are strictly prohibited.

7) Add Alternate 3 - B-Wing Dehumidifier Integration: Contractor should specify the cost of integration of the existing B-wing ceiling dehumidifiers into the WCPS

BAS.

a. Prerequisite: Requires the concurrent selection or presence of the advanced sensor hardware described in Add Alternate 1.

b. Controller Wiring/Integration: Wire the existing, standalone ceiling-mounted dehumidifiers in the B-Wing directly to available digital/analog outputs on the newly installed room unit ventilator (UV) controllers.

c. Programming/Sequence of Operation: System should monitor local zone relative humidity. If space humidity rises above target setpoint, the UV controller shall automatically energize the standalone ceiling dehumidifier via the designated output relay.

d. The UV’s outside air damper shall modulate based on local space CO2 sensor readings. The programming must include a high-ambient-humidity lockout loop that restricts outside air dampening during high outdoor moisture periods to prevent building saturation.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 1

GENERAL CONDITIONS

1. DEFINITIONS:

Addendum: Written change or revision to the RFP Documents issued to the prospective Proposers prior to the time of receiving Proposals.

Alternate: The sum to be added to, or deducted from, the Base Pricing Proposal if the change in scope of work as described in Alternates is accepted by WCPS.

WCPS: Wicomico County Board of Education doing business as Wicomico County Public Schools.

Furnish: Purchase and deliver to site of installation.

Install: Fix in place, for materials; and fix in place and connect, for equipment.

Owner: WCPS, authorized employees, and authorized representatives.

Secure: Obtain.

2. CONTRACT DOCUMENTS:

A. The RFP Documents as modified by any addenda and the Proprosal responses shall become the Contract Documents upon award by WCPS.

B. The Contract Documents shall include:

1) Original RFP, Addenda(s), and Exhibits.

2) The completed Technical Proposal Form and the Proposal Pricing Form.

3) And any additional information required with the Proposal Forms.

4) Any modification amending or extending the work shall be proposed and accepted in writing and shall be as binding as if originally included in the Contract Documents.

C. The Contract Documents are complimentary, and anything required by one shall be as binding as if required by all.

In case of conflicts within the Contract Documents, the order of precedence of interpretation shall be:

1) Original RFP, Addenda(s), and Exhibits.

2) The completed Technical Proposal Form and the Proposal Pricing Form.

3) Any modification amending or extending the work.

D. Should any discrepancy appear or any misunderstanding arise as to the importance of anything contained in the specifications or plans, the matter shall be referred to the Project Manager. Suitable instructions will be given or corrections made when any such error or omission is discovered.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 2

3. USE OF WCPS FACILITIES:

A. The Contractor, Subcontractor, and Sub-subcontractor shall confine their operation to those areas permitted and authorized by the Project Manager. The use of WCPS's facilities (toilets, restrooms, lunchrooms, dumpsters, etc.) and utilities are strictly prohibited unless previously authorized and approved by the Project Manager.

B. The Contractor, Subcontractor, and Sub-subcontractor may park only in those areas designated by the Project Manager.

4. SUBCONTRACTORS:

A. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and WCPS. WCPS shall be deemed to be the third party beneficiary of the contract between the contractor and the subcontractor. If the Contractor does not specify a Subcontractor for any portion of the work to be performed under this Contract, he agrees to perform that portion of the work with their own forces.

B. The Contractor shall not substitute any other person or firm as a Subcontractor, other than those listed in the Proposal submitted by them, without the written approval of WCPS. WCPS reserves the right of approval of all subcontractors proposed for use on this work, and to this end, may require financial, performance and such additional information as is needed to secure this approval.

C. The Contractor shall insert appropriate provisions in all subcontracts pertaining to work on this Project requiring the Subcontractors to be bound by all applicable terms of the Contract Documents.

The Contractor shall be as fully responsible for the acts and omissions of their Subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by them.

5. GOVERNING LAW AND VENUE:

A. The Contract shall be construed in accordance with, and interpreted under, the Laws of the State of Maryland. Any lawsuit arising out of such Contract shall be filed in the appropriate State Court of competent jurisdiction located in Wicomico County, Maryland. No exceptions.

B. All respondents must be registered to do business in the State of Maryland prior to starting any work and should provide a copy of a Good Standing Certificate with the State.

6. CLAIM AND DISPUTES:

As per State Law the Owner shall in no way be obligated to enter into mediation or arbitration proceedings with a Contractor for any purpose whatsoever. The Owner will reserve unto itself the right to determine what form of litigation and its locations are appropriate at the time the dispute arises.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 3

7. INSURANCE

A. The Contractor shall provide to the Procurment Division a Certificate of Insurance with their submission indicating the coverages below prior to the start of any work and agrees to maintain such insurance until the completion of the contract. The minimum insurance coverages shall be:

1) Workmen's Compensation: The Contractor shall maintain throughout the life of the contract statutory Workers' Compensation, including Maryland benefits and employer's liability with limits of $100,000/$100,000/$500,000 for all of the Contractor's and any sub-contractor's employees who will be engaged in the work at the sites of the project.

2) Commercial General Liability: The Contractor shall establish and maintain throughout the life of the contract Commercial General Liability Insurance - $2,000,000 each occurrence/general aggregate covering all premises and operations and including Personal Injury, Completed Operations, Contractual Liability and where applicable to the project as determined by the Purchasing Agent, Products and Independent Contractors. The general aggregate limit is to apply per project; and

3) Business Automobile Liability: $2,000,000 Combined Single Limit (Owned, non-owned and hired).

B. WCPS requires a forty-five (45) day notice, in writing, of cancellation, non-renewal or change in insurance coverage affecting this project. This written notice shall be furnished by the Contractor's insurance carrier(s) or insurance agent(s) to WCPS's Purchasing Division.

C. All Proposers should have current Certificate of Insurance (ACORD certificates) with a miniumm of the above coverages included with the submission. Failure to provide the ACORD certificate may result in the Proposer’s offer being considered non-responsive.

D. The Certificate of Insurance shall be provided in the RFP submission in the designated slot. Wicomico County Public Schools shall be named as an additional insured, including its elected or appointed officials, agents and employees.Coverage must be primary with respect to WCPS, its agents and employees.

8. CODES AND REGULATIONS:

A. The Contractor shall be knowledgeable of and comply with all codes, ordinances, regulations or orders of properly constituted authority having jurisdiction over the services provided under this Contract.

B. All services and materials shall be in full accordance with the latest rules and regulations and other applicable State laws or regulations.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 4

9. SAFETY AND FIRE PREVENTION:

A. OCCUPATIONAL SAFETY AND HEALTH ACTS: Contractor(s) whom perform any services under this contract shall fully comply with the provisions of the Federal Occupational Safety and Health Act of 1970 and any amendments thereto and regulations pursuant to the act, and also to the Maryland Occupational Safety and Health Act, Article 89, Sections 28 to 49A inclusive, Annotated Code of Maryland, as amended by Chapter 59, Laws of Maryland 1973 and any regulations pursuant thereto.

B. The Contractor shall take thorough precautions at all times for the protection of persons and property, and shall be liable for all damages to persons or property, either on or off the site, which occur as a result of their prosecution of the work.

C. Contractor shall take extraordinary care to prevent fires and keep all flammable materials and oily rags in tightly closed metal containers. Contractor shall exercise particular care when welding or cutting, and with regard to the disposition of waste materials, the nature and quantity of which might create or increase a fire hazard.

D. The Contractor and Subcontractors shall comply with Sections 6360, et. seq. of the Labor Code, together with Title 22 with regard to hazardous substances in the work place.

The Contractor and each Subcontractor shall supply to their employees and, where site is occupied, to WCPS, copies of Material Safety Data Sheets (MSDS) for hazardous substances that may be used in the course of the services, together with notice of actual hazardous substances to which employees may be exposed while performing work and appropriate protective measures.

10. TIME:

A. It shall be understood that time is of the essence of the Contract, and the Contractor must prosecute their services diligently and regularly at such a rate of progress as to ensure completion of the work within, or sooner than, the time specified.

The Contractor shall commence the work on the date indicated in the Notice to Proceed, and they agree to complete all work described by the Contract Documents within, or sooner than, the number of calendar days required in the Contract or within the regular schedule agreed to.

B. Failure to prosecute the work in a timely manner and according to the work schedule is considered a breach of Contract and is cause for termination of the Contract according to the Article on "RIGHT TO TERMINATE CONTRACT."

11. COORDINATION WITH OTHER CONTRACTS:

A. WCPS reserves the right to do other work or award other contracts in connection with this Project. If this is the case, the Contractor shall schedule and coordinate their work in such a manner as not to interfere with the work of others. If conflict arises as a

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 5

result of other work on this project, the Contractor shall promptly notify the Project Manager.

WCPS will issue such instructions as are necessary to correct the matter. WCPS shall not be liable for the failure of another Contractor to comply with such instructions.

B. If any part of this Contractor's work depends upon the work of a separate Contractor, this Contractor shall inspect such other work and promptly report in writing to the Project Manager any defects in such other work that render it unsuitable to receive the work of this Contractor.

C. Failure of this Contractor to so inspect and report shall constitute an acceptance of the other Contractor's work, except as to defects which may develop in other Contractor's work after execution of this Contractor's work.

D. If, through acts of negligence on the part of this Contractor, any other contractor or subcontractor shall suffer loss or damage to the work this Contractor shall make a reasonable effort to settle with such other contractor and subcontractor by agreement or arbitration.

E. If such other contractor or subcontractor shall assert any claim against WCPS, on account of any damage alleged to have been so sustained, WCPS shall notify this Contractor, who shall defend such proceedings at their own expense and hold harmless WCPS and the from any such claim.

12. PAYMENTS:

A. Invoices for payment shall be submitted to WCPS within 60 days of completion of the work - FAILURE TO DO SO MAY RESULT IN FORFEITURE OF PAYMENT AS ALL POs WILL BE CLOSED AT THIS TIME.

B. Send all invoices, correspondence and required documents to the the attention of WCPS Accounts Payable, 2424 Northgate Drive, PO Box 1538, Salisbury, MD 21801.

Invoices may also be sent via eamil to acctspay@mywcps.org.

C. ALL INVOICES MUST REFERENCE THE CONTRACT NAME, NUMBER, AND

PURCHASE ORDER NUMBER. Failure to provide any of this information may result in the return and/or rejection of submitted invoices.

D. WCPS offers the following payment options:

1) ACH payment (preferred)

2) P-Card

3) Physical check

E. Payments Do Not Imply Acceptance of Work: The granting of any progress payment or payments by WCPS or the receipt thereof by the Contractor, shall not constitute acceptance of the work or of any portion thereof, and shall in no way lessen the liability of the Contractor to replace unsatisfactory work or material, whether or not the mailto:acctspay@mywcps.org

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 6

unsatisfactory character of such work or material was apparent or detected at the time such payment was made.

F. Payment to Subcontractors and Suppliers: The Contractor shall pay each Subcontractor and supplier promptly on receipt of each progress payment from WCPS for the materials, labor and equipment delivered to the site or incorporated in the work by each Subcontractor during the period for which the progress payment is made, less any retention as provided above. In the event of a loss by a Subcontractor or supplier for which insurance monies are paid, the Contractor shall pay Subcontractor or supplier a just share thereof.

G. Release: The Contractor and each assignee under an assignment in effect at the time of final payment shall, if required by WCPS, execute and deliver at the time of final payment and as a condition precedent to final payment, a release in form and substance satisfactory to and containing such exemptions as may be found appropriate by WCPS, discharging WCPS, its officers, agents and employees of and from liabilities, obligations and claims arising under this Contract.

13. MODIFICATIONS OF CONTRACT

A. Adjustments To Contract: After award of contract, questions and correspondence relative to request for deviation from the Specifications, Terms or Conditions of the Contract must be directed to the Project Manager.

B. Any adjustment permitted under the terms of this contract will be only as authorized by the Purchasing Division in the form of a contract amendment and/or a written Purchase Order Change Notice.

C. Oral Modifications: No oral statements of any person whom so ever shall in any manner or degree modify or otherwise affect the terms of the Contract. No directive shall be responded to unless direction was made by the Project Manager.

Any changes to the scope of work will be only as authorized by the Project Manager.

No other staff member shall be considered authorized.

D. Changes In The Work: WCPS, before the date of acceptance of the work, may order changes in the work (called Modifications) herein required, and may order extra work in connection with the performance of the Contract, and the Contractor shall promptly comply with such orders and any such orders shall be carried out by the Contractor in accordance with the intent of the original Contract specifications.

E. Cost Breakdown: The Contractor shall provide all cost information requested by the Project Manager so that a Change may be processed.

14. HOLD HARMLESS:

A. The Contractor shall, to the fullest extent permitted by law, defend, indemnify and hold harmless WCPS, its elected or appointed officials, employees, and agents from and

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 7

against any and all claims, damages, losses and expenses including, but not limited to, attorney's fees arising out of or a result of the performance of this contract.

B. Such indemnification shall extend to all claims, demands, or liabilities occurring after completion of the project as well as during the progress of the work.

15. CONTRACTOR’S GUARANTEE:

By offering a Proposal, it is mutually understood and agreed between the Owner and Contractor that the Proposerr (Contractor):

A. Certifies that materials used in the work conform to the Specifications contained herein.

B. Guarantees their work against defects in materials and workmanship for a period of two (2) year from the date of final acceptance by WCPS.

C. Certifies that any and all liens for labor and materials used in this contract have been resolved or will be resolved, should they be filled, and that the Contractor shall settle any and all claims without annoyance to the Owner.

D. Guarantees that they will comply with all federal, state, county, or city codes, laws, regulations, and ordinances appropriate to their services and has obtained and paid for any license, permit, or certificate required in the performance of their work.

16. DAMAGE:

The Contractor shall be held responsible for, and shall be required to make good at their own expense, any and all damages done or caused by them or their agent(s) in the execution of this contract.

17. CLEANUP:

A. The Contractor shall keep the premises clean and free from accumulation of waste materials and rubbish. This clean-up shall be done on a daily basis to the satisfaction of the Project Manager.

At the completion of the workday, the contractor shall remove all waste materials and rubbish from the premises at their expense. WCPS's disposal containers shall not be available for use unless specifically authorized, in advance, by the Project Manager.

The Contractor shall not locate on WCPS property any on-site waste or disposal containers unless specifically authorized, in advance, by the Project Manager.

B. The Contractor shall remove all tools, equipment, and surplus materials on a daily basis. Rubbish and debris shall be removed from the work area and disposed of in a neat and legal manner.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 8

C. Final cleaning, such as sweeping, dusting, vacuuming, dry and wet mopping, polishing, sealing, waxing and other finish operations shall be required on newly installed work.

At the time of acceptance, all marks, stains, fingerprints, dust, dirt, splattered paint and blemishes resulting from the various operations shall be removed throughout the building. Stair treads and risers shall be wet-mopped. Glass shall be left clean and polished both inside and outside. Plumbing fixtures and light fixtures shall be washed clean. Hardware and other unpainted metals shall be cleaned and all building papers and other temporary protections shall be removed throughout the building, or portion of the building where Contractor was involved, all to the satisfaction of the Project Manager.

18. ANTI-COLLUSION:

By signing the Proposal Form, the Proposer understands that, in accordance with the Annotated Code of Maryland Finance and Procurement Article 11-205; a person who, for the purpose of defrauding the Board, acts in collusion with another person in connection with the procurement process is liable for damages.

19. ANTI-BRIBERY/DEBARMENT:

This procurement is subject to the Annotated Code of Maryland Finance and Procurement Article 16 concerning Debarment of Contractors. By signing this Form of Proposal, the offeror agrees that he understands and is in compliance with Article 16.

20. POLITICAL CONTRIBUTION DISCLOSURE:

Election Law Article, §§14-101—14-108, Annotated Code of Maryland, requires that every person that enters into contracts, leases, or other agreements with the State of Maryland, including its agencies or a political subdivision of the State, during a calendar year in which the person receives in the aggregate $100,000 or more shall file with the State Board of Elections a statement disclosing contributions in excess of $500 made during the reporting period to a candidate for elective office in any primary or general election.

21. ASBESTOS CONTAINING BUILDING MATERIALS:

By submitting a Proposal for this project, the Contractor agrees that no asbestos containing building materials will be used in this project by any contractor, sub-contractor, or sub-sub-contractor.

22. TOBACCO-FREE SCHOOLS POLICY:

All on site contractors, sub-contractors, and sub-sub-contractors must comply with the Board's tobacco-free schools policy "ADC". The policy states that "the sale or use of tobacco in any form is prohibited in all buildings and all outside seating areas owned or leased by the Board of Education of Wicomico County, at all times (24 hours a day, every day), regardless of whether or not students are present." The policy also states that "the use of tobacco in any form is prohibited on school grounds during the official school day (7 a.m. to 5 p.m.)."

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 9

Any contractors, sub-contractors, or sub-sub-contractors "which do not enforce this tobacco-free policy may be ... declared in default of their contract."

23. CHILD SEX OFFENDER NOTIFICATION:

Maryland law requires certain child sex offenders to register with the local law enforcement agency. One of the purposes of this law, found in Article 17.792, is to inform school systems when a child sex offender is residing or working in the area. When the child sex offender registers, the local police are required to notify the Superintendent of Schools, and the Superintendent, in turn, is required to send a notice to school principals.

As a Contractor working for WCPS, we require that you do not employ convicted child sex offenders to work on projects for our school system if they, as a result, are required to perform delivery, installation, repair, construction or any other kind of services on WCPS property.

24. CRIMINAL BACKGROUND CHECK AND WORKER ASSIGNMENT:

A. Effective July 1, 2015, amendments to 6-113 of the Education Article of the Maryland Code further require that a contractor or subcontractor for a local school system may not knowingly assign an employee to work on school premises with direct, unsupervised, and uncontrolled access to children, if the employee has been convicted of, or pled guilty or nolo contendere to, a crime involving:

1) A sexual offense in the third or fourth degree under 3-307 or 3-308 of the Criminal

Law Article of the Maryland Code or an offense under the laws of another state that would constitute an offense under 3-307 or 3-308 of the Criminal Law Article if committed in Maryland.

2) Child sexual abuse under 3-602 of the Criminal Law Article, or an offense under the laws of another state that would constitute child sexual abuse under 3-602 of the Criminal Law Article if committed in Maryland; or

3) A crime of violence as defined in 14-101 of the Criminal Law Article, or an offense under the laws of another state that would be a violation of 14-101 of the Criminal Law Article if committed Maryland, including: (1) abduction; (2) arson in the first degree; (3) kidnapping; (4) manslaughter, except involuntary manslaughter; (5) mayhem; (6) maiming; (7) murder; (8) rape; (9) robbery; (10) carjacking; (11) armed carjacking; (12) sexual offense in the first degree; (13) sexual offense in the second degree; (14) use of a handgun in the commission of a felony or other crime of violence; (15) child abuse in the first degree; (16) sexual abuse of a minor; (17) an attempt to commit any of the crimes described in items (1) through (16) of this list; (18) continuing course of conduct with a child under 3-315 of the Criminal Law Article; (19) assault in the first degree; (20) assault with intent to murder; (21) assault with intent to rape; (22) assault with intent to rob; (23) assault with intent to commit a sexual offense in the first degree; and (24) assault with intent to commit a sexual offense in the second degree.

B. Also effective July 1, 2015, amendments to 5-561 of the Family Law Article of the Maryland Code mandate that each contractor and subcontractor shall require that any individuals in its work-force must undergo a criminal background check if the

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00100 - 10

individuals have direct unsupervised, and uncontrolled access to children.

25. NONDISCRIMINATION:

NONDISCRIMINATION CLAUSE: In accordance with the Annotated Code of Maryland, State Finance and Procurement Article 13 219, discrimination on the basis of sex, race, age, color, creed, or national origin is prohibited under the terms of this contract by any contractor, sub contractor, or sub sub contractor.

Contractors and sub contractors are required to include similar notification in all sub contracts for other than standard commercial supplies or raw materials and are required to post notice of this provision so that the notice will be available to the Contractor's and/or sub contractor's employees and applicants.

26. A/E SERVICES:

The Board is not responsible for A/E Services requested by the Contractor unless such services are approved by the Project Manager prior to the performance of the A/E Service.

27. INSPECTION SERVICES - OVERTIME:

The Contractor shall reimburse the Owner for all additional engineering and/or inspections services fees incurred as a result of Contractor’s approved request to work overtime. The procedure for request and approval of overtime is outlined in detail Proposalding Documents.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00110 - 1

SUPPLIMENTARY CONDITIONS

1. INTENT: These Conditions and Specifications are intended to cover PEMBERTON

ELEMENTARY SCHOOL HVAC NETWORK CONTROLS for the Wicomico County Public Schools (WCPS). The successful Proposer is to provide labor, material, freight, equipment and supervision as necessary to successfully perform this contract.

2. PERIOD OF CONTRACT:

A. The Contract period shall begin upon award and remain in full force and effect until project completion on or before August 26, 2027, unless terminated or extended by the

WCPS.

B. In addition, the Contract shall have up to one (1) three-year term and two (2) additional one-year options of renewal for additional project work relating to maintenance and warranty work.

C. The options must be mutually agreed upon.

D. Price adjustments must be approved by the Project Manager and Purchasing Department as outlined in these Contract documents.

E. All billing must be submitted within sixty (60) days of project completion.

3. RFP DOCUMENTS

The RFP Documents consist of those documents listed in the table of contents of this RFP packet as well as any and all addenda.

4. METHOD OF PROPOSAL

A. The RFP documents and the signed Proposal Forms with documentation and appropriate attachments are to be submitted as an offer via the specified solicitation portal (See Notice to Proposers).

B. Responses must be submitted on the basis of Technical Proposal Form as well as Price

Proposal Form submitted as two separate files in the designated slot in the solicitation portal.

C. Prices quoted shall not include Federal Excise or State Sales and Use taxes, or any other taxes from which WCPS is exempt. Exemption certificates will be furnished upon request.

5. BASIS OF AWARDING:

Wicomico County Public Schools (WCPS) will utilize a Technical Selection Committee to evaluate and score proposals based on a "Best Value" determination. While pricing is a factor, the contract will be awarded to the proposer who demonstrates the highest level of technical competence, grant compliance, and long-term system value for the district.

91036-271 PEMBERTON ELEMENTARY SCHOOL HVAC NETWORK CONTROLS 00110 - 2

A. This RFP will be scored based on the following criteria:

CRITERIA POINTS DESCRIPTION

Technical Adherence & Compliance

Verifies full hardware and engineering compliance. Absolute mandate for proportional valves. Use of floating actuators will trigger instant technical proposal disqualification.

Timeline & Construction Schedule

Assesses vendor capability, resource scaling, and logistical plans to safely complete all physical demolition, mounting, wiring, and loop commissioning strictly inside the closed Summer 2027 window.

K-12 Project Experience 15

Evaluates contractor corporate history and documented track records delivering major scale BACnet control infrastructure migrations inside live public school facilities.

Energy Modeling & Incentive Support

Measures competency in preparing auditable energy analysis reports to successfully capture utility efficiency incentives from local electric/gas networks.

Pricing 30 Evaluates total base bid lump-sum cost of system..

TOTAL 100

B. WCPS Rights and Reservations