Pedestrian & Bicycle Paths - Kiowa County
- The Kansas Department of Transportation is requesting electronic bids for grading and bridge construction over Ladder Creek in Wallace County, 3.5 miles south and 3.0 miles east of Weskan, with proposals due September 16, 2026 at 1:00 p.m. local time through Bid Express. The project is federally funded through the Federal Aid Highway Program and requires prequalified contractors only; intent to bid must be submitted by 5:00 p.m. on the Monday preceding the letting date. The scope includes...
- The Kansas Department of Transportation is soliciting bids for grading and surfacing on South Rock Road in the City of Derby, Sedgwick County, spanning 1.69 miles from Freedom Street to 0.5 miles north of East 55th Street, with bids due electronically by 1:00 p.m. local time on September 16, 2026. Prequalified contractors must bid through Bid Express using AASHTO's Project Bids software and the project's electronic bidding system file. The scope encompasses common items including contractor...
- The Kansas Department of Transportation is requesting bids on milling and hot mix asphalt overlay work on US-36 in Decatur County spanning 10.974 miles from the Rawlins/Decatur County line east to the US-36/US-83 junction under contract KA 8054-01, with proposals due September 16, 2026 at 1:00 PM local time. Bidding is restricted to prequalified contractors. Contractors must notify KDOT of intent to bid by 5:00 PM on the Monday preceding the letting date and submit electronic proposals through...
- The Kansas Department of Transportation is requesting bids for District 1 Lawn and Landscape Maintenance at 3338 SE 21st Street in Topeka under IFB EVT0010935, with bids due September 22, 2026 at 2:00 PM CST and a mandatory pre-bid conference on September 14, 2026 at 8:30 AM. The scope covers approximately 75,160 square feet of grass and 6,348 square feet of rock and flower beds. Services include six annual applications of fertilizer with crabgrass pre-emergent and weed control treatments,...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for milling and hot mix asphalt overlay work on US-36 in Cheyenne County from the Colorado/Kansas state line to Road 11, spanning 10.150 miles, with proposals due September 16, 2026 at 1:00 p.m. Local Time via Bid Express and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and must identify themselves as bid holders on KDOT's...
- The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is requesting bids on an Ultra-Thin Asphalt Bonded Surface (UBAS) project on K-14 in Jewell County, with proposals due September 16, 2026 at 1:00 p.m. local time via electronic submission through Bid Express, and bids opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and possess a current Kansas Department of Revenue Tax Clearance...
- The Kansas Department of Transportation is requesting bids on chip seal surfacing for US Route 36 in Washington County, spanning 9.176 miles from the eastern city limits of Washington to the Little Blue River Bridge, with proposals due September 16, 2026 at 1:00 p.m. local time. Contractors must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue. Bidders must notify KDOT of intent to bid as a prime contractor by 5:00 p.m. on the Monday...
- The Kansas Department of Transportation is requesting bids for milling and hot mix asphalt overlay on K-266 in Republic County, spanning 7.541 miles from the K266/US36 Junction north to the North Route Terminus, with proposals due September 16, 2026 at 1:00 p.m. Local Time through the Bid Express website and bid opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and possess a current Tax Clearance Certificate from the...
- The Kansas Department of Transportation is requesting quotes for epoxy flooring repair at the Cherryvale Rest Area (US-169/US-400, Meade County) with bids due September 29, 2026, at 2:00 p.m. CDT and mandatory in-person attendance at a pre-proposal conference on September 9, 2026, at 10:30 a.m. at the site; failure to attend results in bid rejection. The scope covers repair of approximately 641 square feet of flooring and 174 linear feet of vertical surfaces (3.1" to 6" height)...
- The Kansas Department of Transportation, procured through the Kansas Department of Administration's Office of Procurement and Contracts, is requesting quotes for traffic control services on US 81 in Caldwell, Kansas from the South City Limits to the North side of Sixth Avenue, with proposals due September 29, 2026 at 2:00 p.m. CST. The scope requires installation, maintenance, and removal of temporary traffic signals, work zone signage, channelizers, temporary striping, rumble strips, and...
The Kansas Department of Transportation (KDOT) is requesting bids for pedestrian and bicycle path construction on 0.87 miles of streets in Greensburg, Kiowa County, with electronic proposals due September 16, 2026 at 1:00 p.m. local time. Prequalified contractors are eligible to bid; all contractors and subcontractors must obtain current Tax Clearance Certificates from the Kansas Department of Revenue at contract award. The scope spans portions of West Florida Avenue, South Main Street, South Walnut Street, West Garfield Avenue, South Sycamore Street, West Wisconsin Avenue, and West Iowa Avenue. Work includes clearing and grubbing, excavation, sidewalk and curb construction, trench drain installation, utility adjustments, concrete pavement and marking, temporary erosion and sediment control, construction fencing, signing, and seeding. Pricing is based on unit prices for individual line items, with several items designated as set-price. The project is State Project No. 049 TE 0562-01, Contract No. 526092515, and Federal Project ACTA-T056(201). Funding is federal and state. The contract requires 55 restricted working days to open the project to unrestricted traffic and 75 total contract working days for completion, with an earliest start date of February 1, 2027 and latest start date of August 9, 2027. Contract execution must occur within ten business days of award notification. Electronic bidding is mandatory using KDOT's Bid Express system and Project Bids software. Contractors must register as bid holders by 5:00 p.m. on the Monday preceding the letting date. The project is subject to federal affirmative action, equal employment opportunity provisions, and restrictions on foreign unmanned aerial systems.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Pedestrian _ Bicycle Paths - Kiowa County.pdf | 2MB | 9/7/26 |