Pedestrian and Bicycle Paths - Burlington, KS
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for pedestrian and bicycle path construction in Wamego, Pottawatomie County, with proposals due July 22, 2026 at 1:00 p.m. local time through the Bid Express website. Contractors must be prequalified with KDOT and provide notice of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The project is federally funded through the Federal Highway Program and requires compliance with federal and state...
- The Kansas Department of Transportation is soliciting bids on pedestrian and bicycle paths construction in the City of Wamego, Pottawatomie County, with proposals due July 22, 2026 at 1:00 p.m. local time through Bid Express. Contractors must be prequalified with KDOT and hold a current Kansas Department of Revenue Tax Clearance Certificate. The scope encompasses sidewalk construction (4-inch depth), sidewalk ramps, curb and gutter, concrete pavement (6-inch uniform), aggregate base, flashing...
- The Kansas Department of Transportation is soliciting electronic bids for construction of pedestrian and bicycle paths in South Hutchinson, Reno County, spanning 0.565 miles along Avenue C (Main Street to Whiteside Street) and West Blanchard Road, with proposals due July 22, 2026 at 1:00 p.m. local time. Bidders must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue. All work must comply with federal aid requirements including...
- The Kansas Department of Transportation is requesting bids for grading, bridge, and surfacing work on K-8 at Bridge 031 (Middle Beaver Creek) in Smith County, 12.120 miles north of the US-36/K-8 junction, with proposals due July 22, 2026 at 1:00 p.m. local time. The scope encompasses clearing and grubbing, common excavation, rock excavation, earthwork compaction, removal of existing structures, bridge construction (Class I and II excavation, concrete, reinforcing steel, prestressed concrete...
- The Kansas Department of Transportation (KDOT) is requesting sealed bids for grading and bridge construction over Little Labette Creek near Thayer in Neosho County, with proposals due July 22, 2026 at 1:00 p.m. local time through the Bid Express website. Contractors must be prequalified with KDOT — a mandatory eligibility requirement. The scope includes grading, bridge construction, guardrail installation, erosion control, and associated site improvements. The bridge spans 0.133 miles and is...
- The Kansas Department of Transportation is requesting bids for grading and bridge construction over the East Branch of Fall River, 6.0 miles south and 2.5 miles east of Teeterville in Greenwood County, with proposals due July 22, 2026 at 1:00 p.m. local time through Bid Express. Contractors must be prequalified with KDOT and must obtain a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award. The project encompasses grading, bridge construction,...
- The Kansas Department of Transportation is requesting bids for grading and bridge construction over Big Sandy Creek in Woodson County, with electronic proposals due July 22, 2026 at 1:00 p.m. Local Time through Bid Express. Bidders must be prequalified contractors with KDOT and must submit a bid bond. The bridge is located 1.5 miles north and 1.0 miles east of Woodson County State Lake, with a total project length of 0.123 miles. Work includes removal of existing structures, mobilization,...
- The Kansas Department of Transportation is requesting bids on signing construction—fabrication and installation of four overhead sign structures and associated safety barriers—across Johnson and Wyandotte Counties, with proposals due July 22, 2026 at 1:00 p.m. via Bid Express and bid opening at 3:00 p.m. the same day. Contractors must be prequalified with KDOT and possess a current Tax Clearance Certificate from the Kansas Department of Revenue at time of award. The scope comprises one sign...
- The Kansas Department of Transportation is requesting bids on signing installation for major collector roads east of K-99 in Chautauqua County, spanning 90 miles, with proposals due July 22, 2026 at 1:00 p.m. via Bid Express, with opening and reading at 3:00 p.m. the same day. Contractors must be prequalified with KDOT and notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The scope includes installation of 2,144.190 square feet of flat sheet...
- The Kansas Department of Transportation is requesting bids for grading and surfacing on US-54/US-400 from Broadway Street to K-14 in Kingman, Kingman County, with proposals due July 22, 2026 at 1:00 p.m. local time through Bid Express. Only prequalified contractors may bid and must identify themselves as bid holders by 5:00 p.m. on the Monday preceding the letting date. The 0.213-mile project scope includes construction staking, field office and laboratory services, mobilization, removal of...
The Kansas Department of Transportation (KDOT) is requesting bids for pedestrian and bicycle path construction on 6th Street in Burlington, Coffey County, with proposals due July 22, 2026 at 1:00 p.m. local time. The project is funded entirely through federal-aid highway program funds. The scope includes removal of existing structures, common excavation, compaction, concrete pavement work, sidewalk construction, a pedestrian bridge with steel piles and reinforcing steel, erosion control measures, and drainage pipe installation. The path extends 0.042 miles across Rock Creek between Hudson Street and Juniatta Street in the 300 block of 6th Street. Work is restricted to 60 days with a total contract duration of 80 days. The earliest project start date is September 1, 2026, and the latest is March 1, 2027. Contractors must be prequalified and must register as bid holders by 5:00 p.m. on the Monday preceding the letting date. All proposals must be submitted electronically through the Bid Express website. Contractors must hold a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award. The bid tabulation includes unit prices with set prices for mobilization, concrete work, water, and flagging services. All work must comply with the Kansas Department of Transportation's Standard Specifications for State Road and Bridge Construction (2015 Edition), applicable special provisions, federal requirements including FHWA-1273, and applicable minimum wage rates for Coffey County. Contractors must execute the contract within ten business days after notice of award. Proposals must include completed contract provisions addressing noncollusion, financial prequalification, lobbying restrictions, tax clearance certification, foreign drone prohibitions, and affirmative action requirements.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Pedestrian and Bicycle Paths - Burlington_ KS.pdf | 2MB | 6/24/26 |