- The Kansas Department of Transportation (KDOT) is soliciting bids for construction of pedestrian and bicycle paths totaling 0.433 miles on Main Street (North Railroad Avenue to Warren Avenue) and Russell Avenue (4th Street to 6th Street) in the City of WaKeeney, Trego County, with electronic proposals due June 17, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. Contractors must be prequalified and submit electronic proposals via the Bid Express website using AASHTO's Project Bids software....
- The Kansas Department of Transportation is requesting sealed bids for grading, bridge, and surfacing work on K-68 from US-169 east 6.8 miles to 0.8 miles west of US-69 in Louisburg, Miami County, with bids due June 17, 2026. The project spans 6.678 linear miles and includes two bridge structures (Bridges 68-61-52.54 and 68-61-52.55), concrete and asphalt surfacing, drainage systems, guardrails, fencing, signing, pavement markings, lighting, traffic signals, intelligent transportation systems,...
- The Kansas Department of Transportation is requesting bids on grading and surfacing of RS 2039 from Ottawa Road to K-18 in Ottawa County spanning 3.30 miles, with electronic proposals due June 17, 2026 at 1:00 p.m. local time and opened at 3:00 p.m. the same day. Contractors must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue. The scope includes common construction items (staking, field office setup, mobilization, traffic control),...
- Kansas Department of Transportation is requesting bids on signing installation and maintenance at various locations on K-27, US-160, and US-400 across Hamilton, Greeley, Kearney, and Stanton Counties (93.5 miles total), with proposals due June 17, 2026 and the letting date also June 17 at 1:00 p.m. Local Time via Bid Express. Prequalified contractors only; KDOT will not accept paper bids. All bidders must hold a current Tax Clearance Certificate from the Kansas Department of Revenue at...
- The Kansas Department of Transportation is requesting bids for signing installation across various state and U.S. highways spanning 124.67 miles in Nemaha, Brown, Jackson, Pottawatomie, and Marshall counties, with proposals due June 17, 2026 at 1:00 p.m. local time through Bid Express. This procurement is restricted to prequalified Kansas contractors and requires a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award. The scope encompasses flat sheet signs...
- The Kansas Department of Transportation Bureau of Construction and Materials is soliciting sealed bids for grading and bridge construction over Big Timber Creek located 12.0 miles north and 2.0 miles east of Bird City in Cheyenne County, with proposals due June 17, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day. The project spans 0.104 miles and includes site preparation, foundation stabilization, mobilization, removal of existing structures, common excavation of...
- The Kansas Department of Transportation is requesting proposals for an Intelligent Transportation System installation project on Interstate 35 southbound in Johnson County, with proposals due June 17, 2026 and project letting at 3:00 p.m. at the Eisenhower State Office Building in Topeka. Prequalified contractors only are eligible; all proposals must be submitted electronically through Bid Express no later than 1:00 p.m. local time on the letting date. The scope includes installation of...
- The Kansas Department of Transportation is requesting proposals for the installation and setup of Continuously Operating Reference Stations (CORS) at 18 designated locations across Kansas, with proposals due June 17, 2026 at 1:00 p.m. local time and bid opening at 3:00 p.m. at the Eisenhower State Office Building in Topeka. KDOT has issued Addendum 1 (correcting a typographical error and introducing special provision 08-12-24-R01) and Addendum 2 (revising CORS unit cost requirements), both...
- The Kansas Department of Transportation is soliciting bids for highway signing work at various locations on K-44, K-49, US-81, US-160, US-166, and US-177 across Sumner, Sedgwick, Cowley, and Harper counties, spanning 135.30 miles, with electronic proposals due June 17, 2026 at 1:00 p.m. through Bid Express. Contractors must notify KDOT of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The scope includes mobilization, installation and removal of highway signs, removal of...
- The City of Olathe, Kansas is requesting sealed bids for demolition and reconstruction work at Mill Creek Park, including a new bathhouse and splashpad with associated infrastructure, with bids due June 30, 2026 and a mandatory pre-bid conference on June 9, 2026 at 10 a.m. at the Olathe Parks Operations Facility. The scope encompasses demolition of an existing park restroom and partial removal of the bathhouse, followed by construction of a new bathhouse and splashpad with associated walkways,...
The Kansas Department of Transportation is requesting bids for construction of pedestrian and bicycle paths totaling 4.352 miles in Osawatomie, Miami County, with proposals due June 17, 2026 at 1:00 p.m. Local Time via Bid Express. This is a federally and locally funded project (Federal Project TA-T052(901), State Project 061 TE 0529-01) subject to Davis-Bacon wage requirements and federal-aid construction contract provisions including Equal Employment Opportunity and nondiscrimination standards. The scope comprises two connected loop segments: the South Levee Loop connecting Flint Hills to the levee and street-grid system, and the John Bridge Loop connecting Flint Hills Trail around the John Brown Museum and High School to 12th and 9th Streets. Work includes common items, road construction, erosion control, concrete surfacing, fencing, signing, and pavement marking with set prices for contractor construction staking, mobilization, concrete seal course, and flagger services. Contractors must be prequalified with KDOT and possess a current Kansas Department of Revenue Tax Clearance Certificate at the time of bid submission. Subcontractors require tax clearance certificates before approval. The contractor must comply with minimum wage rates established for Miami County and cannot procure covered telecommunications equipment from prohibited foreign sources per Section 889 of the National Defense Authorization Act. The contract allows 90 restricted days to open the project to unrestricted traffic and 110 total contract working days for completion. Contractors must execute the contract within ten business days after award notification, with contract execution scheduled for October 26, 2026 as the earliest start date. Bids will be opened and read at 3:00 p.m. at the Eisenhower State Office Building in Topeka.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Pedestrian and Bicycle Paths - Miami County.pdf | 1MB | 5/29/26 |