About this opportunity
The City of Enid, Oklahoma is seeking proposals for a comprehensive infrastructure project involving the construction of a concrete-lined channel located between Mayberry Street and Hoover Street. The procurement is a public works project designated as Project No. F-1812C, which requires constructing an 8-ft wide, 2-ft deep channel with 6-inch thick reinforced concrete lining and fiber-reinforced concrete banks. Key project deliverables include channel installation, a reinforced retaining wall on the north side of the channel, side slope sodding, and comprehensive erosion control measures. The project was posted on April 16, 2019, with proposals due by May 15, 2019. Bidders must submit a comprehensive proposal package, including a 5% proposal guaranty, non-collusion affidavits, business relationship affidavits, and meet specific contractor qualification requirements. Evaluation will likely focus on technical capability, proposed construction methodology, and total bid price, with contractors expected to provide detailed unit pricing for 14 base bid items and 2 alternate bid items.
The procurement does not explicitly specify set-aside designations for disadvantaged business enterprises or minority-owned businesses. Contractors will be required to provide performance and statutory bonds at 100% of the contract price, along with a three-year maintenance bond. Payment terms include monthly estimates with 95% payment and final payment contingent upon project completion and satisfactory performance. While no specific budget range is explicitly stated in the documents, the comprehensive bid form and technical specifications suggest a significant municipal infrastructure investment. Contractors will be responsible for all materials, labor, equipment, and incidental work necessary to complete the project according to specified technical standards, with potential liquidated damages for project delays. The project encompasses standard municipal infrastructure improvements and offers some flexibility through alternate bid items, including provisions for low-strength concrete mud slab and service line installation.
Opportunity text
Construct a concrete lined channel along existing channel from west of Mayberry Street to Hoover Street in the City of Enid.
Files
| File | Type | Posted |
|---|---|---|
| F1812C Electronic Quantities Sheet.xlsx | XLSX spreadsheet | |
| Final specifications.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity