About this opportunity
The City of Irvine, California Public Works & Sustainability Department is requesting bids on traffic signal modification at Paseo Westpark and San Remo (CIP 332003, Invitation # SG-26-0034), with bids due October 1, 2026 at 10:00 a.m. PDT and an online question deadline of September 17, 2026. The project is subject to a Community Workforce Agreement (CWA) with the Los Angeles/Orange County Building and Construction Trades Council establishing a local hire goal of 30 percent of total hours worked, prioritizing workers from specified local zip codes within Orange County, veterans, and MC3 graduates.
Scope includes cold milling; removing and replacing AC pavement; AC and ARHM pavement surface course overlay; adjusting valve covers, manhole covers, and pull box covers to grade; removing and replacing damaged concrete curb, gutter, and sidewalk; modifying and installing new curb ramps; constructing reverse curb and gutter with transition; restriping lane configuration; removing and replacing existing signal poles, equipment, and controller cabinets; installing new signal controller cabinet and service enclosure; and installing new wiring for signal equipment. The prime contractor must hold a California Class A license; Class C-10 licensing is required for specialty work. All contractors and subcontractors must register with the California Department of Industrial Relations prior to bidding.
The estimated bid value is $1.02 million on a lump-sum basis. Performance is scheduled from June through October 2027 over 100 working days. Liquidated damages are $4,200 per calendar day. Bid, payment, and performance bonds of 10%, 100%, and 100% respectively are required. Prevailing wage requirements apply as a public works project exceeding $1,000. The offer is valid for 90 days from the posting date of September 14, 2026. Under the CWA, contractors must submit a signed Letter of Assent, maintain a Core Employees List, submit a Pre-Job Conference Form to the CWA Administrator, and coordinate worker requests with union hiring halls at least 48 hours in advance.
Opportunity text
Work to be performed shall include, but not be limited to: Cold milling; removing and replacing AC pavement; AC and ARHM pavement surface course overlay; adjusting valve covers, manhole covers, and pull box covers to-grade; removing and replacing damaged concrete curb, gutter, and sidewalk; modifying/installing new curb ramps; constructing reverse curb and gutter with transition; restriping existing lane configuration; removing existing signal poles and equipment; constructing new signal poles and equipment; removing existing signal controller cabinet and service enclosure; installing new signal controller cabinet and service enclosure; installing new wiring for signal equipment; and other items not mentioned here, but required by the Project Plans, Project Specifications, and Special Provisions.
Files
| File | Type | Posted |
|---|---|---|
| Paseo Westpark and San Remo Traffic Signal Modification.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity