Parker Road Sidewalks - East Side Gaps Pine Drive to Stroh Road
Closed State & local contract opportunity Posted
- Solicitation number
- CIP23-042
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 120 Boats, Motors, And Marine Equipment
- 150 Builder's Supplies
- 155 Buildings And Structures: Fabricated And Prefabricated
- 210 Concrete And Metal Products, Culverts, Pilings, Septic Tanks, Accessories And Supplies
- 285 Electrical Equipment And Supplies, Except Cable And Wire
- 315 Epoxy Based Formulations For Adhesives, Coatings, And Related Agents
- 330 Fencing
- 445 Hand Tools, Powered And Non-Powered, Including Accessories And Supplies
- 540 Lumber, Siding, And Related Products
- 545 Machinery And Hardware, Industrial
Show all 19
- 550 Markers, Plaques And Traffic Control Devices
- 560 Material Handling, Conveyors, Storage Equipment And Accessories
- 570 Metal: Bars, Plates, Rods, Sheets, Strips, Structural Shapes, Tubing, And Fabricated Items
- 665 Plastics, Resins, Fiberglass: Construction, Forming, Laminating, And Molding Equipment, Accessories, And Supplies
- 750 Road And Highway Building Materials, Non Asphaltic
- 755 Road And Highway Asphalt And Concrete Handling And Processing Equipment
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 925 Engineering Services, Professional
- 929 Equipment Maintenance And Repair Services For Agricultural, Construction, Heavy Industrial, Material Handling, And Road And Highway Equipment
- Point of contact
-
- Tom Gill tgill@parkeronline.org (303) 805-3190
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
Douglas County, Colorado is seeking bids for the Parker Road Sidewalks project, a comprehensive infrastructure improvement initiative targeting a 10-foot-wide concrete shared use path along the east side of Parker Road between Pine Drive and Stroh Road. The project, designated as CIP23-042, involves constructing two distinct segments with multiple critical infrastructure components, including ADA-compliant curb ramp upgrades, retaining walls, two prefabricated steel pedestrian bridges, and various drainage structures. Potential contractors must be prepared to execute a complex, multi-faceted transportation infrastructure project that requires precise engineering, construction, and civil works capabilities. The bid is scheduled to be due on September 4, 2025, with the opportunity originally posted on August 14, 2025. The comprehensive bid schedule details over 100 line items covering extensive work categories such as clearing and grubbing, excavation, concrete work, erosion control, traffic management, electrical conduit installation, and signage, indicating a robust and detailed procurement process that demands significant technical expertise and construction management skills.
While specific set-aside designations are not explicitly detailed in the provided documentation, the project appears to be a standard competitive bidding process open to qualified contractors with demonstrated infrastructure construction capabilities. The bid schedule indicates a total anticipated project value of $506,400, with flexible allocations across multiple categories including minor contract revisions, on-the-job trainee programs, landscaping, and erosion control. Contractors will need to provide comprehensive pricing across Schedule 1 and Schedule 2, with line items covering traffic control, construction surveying, mobilization, and public information management. The project requires precise cost estimation, detailed technical understanding of pedestrian infrastructure construction, and the ability to integrate multiple complex engineering elements including steel pedestrian bridges and drainage structures. Financial allocations suggest this is a significant local infrastructure investment aimed at improving pedestrian mobility and accessibility in the Douglas County corridor.
Opportunity text
The project consists of constructing a 10-foot-wide concrete shared use path along the east side of Parker Road between Pine Drive and Stroh Road in two different segments. Curb ramps will be upgraded to be ADA compliant when within the work area. Retaining walls, two prefabricated steel pedestrian bridges, and other drainage structures will be required in various locations.
Files
| File | Type | Posted |
|---|---|---|
| Bid Schedule - editable with formulas.xlsx | XLSX spreadsheet | |
| PARKER ROAD SIDEWALKS - EAST SIDE GAPS PINE DRIVE TO STROH ROAD CIP23-042.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity