Oil Dock 10 Drain Pan Liner
Closed State & local contract opportunity Posted
- Solicitation number
- Quote 26-324A
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Purchasing procurement@pocca.com (361) 882-5633
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Port of Corpus Christi Authority (PCCA) is requesting quotations for fabricating and fitting a stainless steel drain pan liner and new drain connection at Oil Dock 10, with quotations due October 16, 2026 at 3:00 p.m., and a mandatory site visit on October 14, 2026 at 9:00 a.m.
This is a restricted-area project at 2799 Suntide Road in Corpus Christi, Texas, requiring contractors to comply with access requirements specified in technical specification 01 14 13. Work must be performed in accordance with provided construction drawings. All quotations must be lump-sum and submitted electronically through the PCCA Procurement website; no in-person, email, or facsimile submissions are accepted.
Advance site-visit registration is mandatory, requiring submission of a TWIC Site Visit Registration Form through ProcureWare by October 13, 2026 at 3:30 p.m. Contractors must obtain identification cards and vehicle decals for restricted-area access at their own expense.
The lump-sum quote must cover all labor, supervision, equipment, materials, insurance, overhead, and profit necessary to complete the work. Liquidated damages are assessed at $2,500 per calendar day for each day the project remains substantially incomplete beyond the required completion date. Contractors must commence work within ten calendar days of Notice to Proceed and comply with PCCA's ISO 14001 certified Environmental Management System Program Requirements. Insurance coverage is required as detailed in General Conditions 3.36 and Special Conditions 1.07, with certificates approved by the Texas Insurance Commission and submitted within seven calendar days of Notice of Award. Performance and Payment Bonds may be required depending on contract value. PCCA reserves the right to reject any or all responses and to waive irregularities.
Opportunity text
The project scope generally consists of fabricating and fitting a stainless steel drain pan liner and new drain connection at Oil Dock 10 per the construction drawings. This is a Restricted Area, therefore, Contractor must follow restricted access requirements as stated in technical specification 01 14 13 Access to Port Authority Property.
Files
| File | Type | Posted |
|---|---|---|
| 01 Request for Quotation for 26-324A.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity