Odnr - bid level design package for lake erie wildlife research vessel
Closed State & local contract opportunity Posted
- Solicitation number
- SRC0000026423
- State
- Ohio
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from ohiobuys.ohio.gov. Updated .
About this opportunity
The Ohio Department of Natural Resources (ODNR), Division of Wildlife is seeking a naval architectural and marine engineering firm to develop a comprehensive bid-level design package for a replacement research vessel for the R/V Grandon. The project involves creating a concept design for a 50-60' fisheries research vessel with specific requirements including aluminum construction, under 20 feet beam, maximum 5-foot draft, and capabilities for 16-20 knot speeds with a 400 nautical mile range. Key deliverables include general arrangement plans, specifications, stability analysis, machinery and electrical systems arrangements, and safety plans optimized for research operations in Lake Erie's Central Basin. The proposal will be evaluated across multiple criteria, including company profile (45 points), prior projects (45 points), staffing plan (20 points), and work plan (100 points), totaling 1,075 possible technical points with an additional 160 possible points for cost proposal. A mandatory site visit is scheduled for February 2025, during which the awarded contractor will inspect the existing R/V Grandon in Sandusky, OH, with a final concept design package due by June 30, 2025. Offerors must demonstrate expertise in designing research vessels with a focus on stability, maneuverability, fuel efficiency, sustainability, and cost-effectiveness.
While the Request for Proposal does not explicitly outline set-aside designations or specific restrictions for disadvantaged enterprises, the document emphasizes the need for a qualified vendor with proven marine engineering capabilities. The project is specifically targeting the replacement of the existing R/V Grandon, suggesting continuity in research vessel operations for the ODNR Division of Wildlife. The procurement is focused on Erie County, Ohio, and will support ongoing marine research activities in Lake Erie. Although a specific budget range is not directly stated, the comprehensive nature of the design package and the technical complexity suggest a substantial investment in marine engineering services. The proposal requires extensive technical documentation, including trawling and gill netting capabilities, hydroacoustic sampling provisions, and comprehensive vessel system designs, indicating a sophisticated and potentially high-value contract for the selected marine engineering firm.
Opportunity text
The Ohio Department of Natural Resources, Division of Wildlife is soliciting proposals for a Bid Level Design Package for Lake Erie Wildlife Research Vessel. The project objective is to secure a qualified vendor to provide the services to include naval architectural and marine engineering support for development of a concept design package for a 50-60' fisheries research vessel to replace the R/V Grandon. The plans will be optimized to meet the Division's specific research and operational needs, with a focus on stability, maneuverability, fuel efficiency, sustainability, and cost-effectiveness Offeror must commit to a mandatory site visit to be scheduled (February 2025) with the awarded Contractor only for the design crew to visit the R/V Grandon (drydocked in Sandusky, OH) to further understand the mission critical needs prior to design work. Offeror must complete the concept design package by June 30, 2025.
Files
| File | Type | Posted |
|---|---|---|
| RFP - ODNR - BID LEVEL DESIGN PACKAGE RESEARCH VESSEL.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity