Ocean Center Security Fencing and Loading Dock Gates

Closed State & local contract opportunity Posted

Solicitation number
26-B-114KO
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Volusia County is soliciting bids for security fencing and loading dock gates at the Ocean Center, with proposals due September 17, 2026. The project integrates fencing, security gates, and Gallagher and Flash access control systems to enhance security and access control for the facility's events.

The scope encompasses perimeter fencing, security gates, and dual access control platforms (Gallagher and Flash systems) to create a secure, manageable environment. Construction plans, security gate construction specifications, technology systems design and installation guidelines, and staging area documentation are provided in the attached exhibits. The project manual and draft construction contract detail scope, sequencing, insurance requirements, and sales-tax-exemption procedures.

Contractors must comply with special conditions for loading dock gates, meet specified insurance requirements (detailed in Exhibit A), and follow Division 27 technology systems design and installation guidelines for access control integration. A prime-subcontractor form is required.

The attached files include detailed construction plans (Exhibits D and E), Gallagher and Flash system specifications and configuration documents, a price sheet, insurance schedules, contract terms, staging area diagrams, and sales-tax exemption procedures. No contract value, contract term, or evaluation criteria are stated in the source material. Questions due date and pre-bid meeting or site-visit information are not identified in the source.

Opportunity text

This project is intended to enhance security and improve access control throughout the area for the various events hosted at the Ocean Center. The project will incorporate fencing, security gates, Gallagher and Flash access control systems to create a more secure and manageable environment. Because these areas are used frequently and support a wide range of events, it is important to install high-quality, reliable equipment that provides consistent performance, durability, and effective security.

Files

File Type Posted
Ocean_Center_Security_Fencing_and_Loading_Dock_Gates_(Addendum_#5_Revision).pdf PDF
Exhibit_I-OC_Security_Fencing_Project_Manual_08.27.26.pdf PDF
Ocean_Center_Security_Fencing_and_Loading_Dock_Gates_(Addendum_#1_Revision).pdf PDF
COV_Div_27_Technology_Systems_Design_and_Installation_Guidelines_073025_.pdf PDF
Ocean_Center_Security_Fencing_and_Loading_Dock_Gates.pdf PDF
Exhibit_H-_Div_27_Technology_Systems_Design_and_Installation_Guidelines.pdf PDF
Exhibit_H-_Div_27_Technology_Systems_Design_and_Installation_Guidelines.pdf PDF
Exhibit_H-_Div_27_Technology_Systems_Design_and_Installation_Guidelines.pdf PDF
Exhibit_F-_Sales_Tax_Exemption_Procedures_26-B-114KO.pdf PDF
Exhibit_F-_Sales_Tax_Exemption_Procedures_26-B-114KO.pdf PDF
Exhibit_F-_Sales_Tax_Exemption_Procedures_26-B-114KO.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-114KO.xls XLS spreadsheet
Exhibit_B-PRIME-SUB_FORM_26-B-114KO.xls XLS spreadsheet
Exhibit_B-PRIME-SUB_FORM_26-B-114KO.xls XLS spreadsheet
Exhibit_G-_Staging_Area_26-B-114KO_.png PNG image
Exhibit_G-_Staging_Area_26-B-114KO_.png PNG image
Exhibit_G-_Staging_Area_26-B-114KO_.png PNG image
Exhibit_C_-_Draft_Construction_Contract_26-B-114KO.pdf PDF
Exhibit_C_-_Draft_Construction_Contract_26-B-114KO.pdf PDF
Exhibit_C_-_Draft_Construction_Contract_26-B-114KO.pdf PDF
Exhibit_A-_Insurance_Requirements_26-B-114KO_Ocean_Center_Fencing_and_Loading_Dock.pdf PDF
Exhibit_A-_Insurance_Requirements_26-B-114KO_Ocean_Center_Fencing_and_Loading_Dock.pdf PDF
Exhibit_A-_Insurance_Requirements_26-B-114KO_Ocean_Center_Fencing_and_Loading_Dock.pdf PDF
Exhibit_E-_Security_Gate_Construction_Plans_26-B-114KO.pdf PDF
Exhibit_E-_Security_Gate_Construction_Plans_26-B-114KO.pdf PDF
Exhibit_E-_Security_Gate_Construction_Plans_26-B-114KO.pdf PDF
Exhibit_D-_Construction_Plans_26-B-114KO.pdf PDF
Exhibit_D-_Construction_Plans_26-B-114KO.pdf PDF
Exhibit_D-_Construction_Plans_26-B-114KO.pdf PDF
Debary_Hall_Caretaker_&_Icehouse_Price_Sheet_6-9-25_Edit_-_Copy.xlsx XLSX spreadsheet
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
FLASH_OCEAN_CENTER_SECURITY_GATES_061826_R0.pdf PDF
PC4110_OC_Security_Fencing_CD_06.18.26.pdf PDF
Staging_Area_Outlined_In_Orange_.png PNG image
DBOC_Special_Conditions_for_Loading_Dock_Gates_(1).docx DOCX document
PC4110_OC_Security_Fencing_CD_06.18.26.pdf PDF
PC4110_OC_Security_Fencing_Project_Manual_03.20.26.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
DBOC_Special_Conditions_for_Loading_Dock_Gates_(1).docx DOCX document
FLASH_OCEAN_CENTER_SECURITY_GATES_061826_R0.pdf PDF
PC4110_OC_Security_Fencing_Project_Manual_03.20.26.pdf PDF
Debary_Hall_Caretaker_&_Icehouse_Price_Sheet_6-9-25_Edit_-_Copy.xlsx XLSX spreadsheet
Staging_Area_Outlined_In_Orange_.png PNG image
Show all 43

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity