Ocean Center Security Fencing and Loading Dock Gates
Closed State & local contract opportunity Posted
- Solicitation number
- 26-B-114KO
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC code
- Point of contact
-
- Karissa Ott kott@volusia.org (386) 626-6626
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Volusia County is soliciting bids for security fencing and loading dock gates at the Ocean Center, with proposals due September 17, 2026. The project integrates fencing, security gates, and Gallagher and Flash access control systems to enhance security and access control for the facility's events.
The scope encompasses perimeter fencing, security gates, and dual access control platforms (Gallagher and Flash systems) to create a secure, manageable environment. Construction plans, security gate construction specifications, technology systems design and installation guidelines, and staging area documentation are provided in the attached exhibits. The project manual and draft construction contract detail scope, sequencing, insurance requirements, and sales-tax-exemption procedures.
Contractors must comply with special conditions for loading dock gates, meet specified insurance requirements (detailed in Exhibit A), and follow Division 27 technology systems design and installation guidelines for access control integration. A prime-subcontractor form is required.
The attached files include detailed construction plans (Exhibits D and E), Gallagher and Flash system specifications and configuration documents, a price sheet, insurance schedules, contract terms, staging area diagrams, and sales-tax exemption procedures. No contract value, contract term, or evaluation criteria are stated in the source material. Questions due date and pre-bid meeting or site-visit information are not identified in the source.
Opportunity text
This project is intended to enhance security and improve access control throughout the area for the various events hosted at the Ocean Center. The project will incorporate fencing, security gates, Gallagher and Flash access control systems to create a more secure and manageable environment. Because these areas are used frequently and support a wide range of events, it is important to install high-quality, reliable equipment that provides consistent performance, durability, and effective security.
Files
Show all 43
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity