Oates to Centerville Transmission Line Construction Services (GP&L)

Open State & local contract opportunity Posted

Solicitation number
25002833.002A
State
Texas
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

GP&L is soliciting bids under Invitation for Bid (IFB) Centerville-Oates for transmission and distribution line construction services, with bids due December 8, 2026. The work is in Dallas County and Garland City, Texas, and the IFB document is attached as IFB_Centerville_Oates.pdf.

The transmission scope covers installing new steel monopole structures in six configurations: two single-circuit 2-pole deadend, three double-circuit deadend, four double-circuit tangent, twelve single-circuit tangent, fifteen single-circuit deadend, and three single-circuit angle. It also includes 38 spans of bundled 959 ACSS/TW conductor and 38 spans of OPGW, with four splices at Centerville Substation. Removal work includes 47 spans of 795 ACSR conductor, 47 spans of 3/8 EHS shield wire, and removal or topping above distribution of 46 existing steel monopoles. Existing double circuits to Miller and Lyons transfer to new deadend structures.

The underbuilt distribution scope adds 46 double-circuit structures across deadend, tangent, and riser configurations. The underground scope installs two circuits of 1,000 feet of 1,000 kcmil cable outside Centerville Substation under South Glenbrook Drive and West Centerville Road, plus 21 feeder dips along Duck Creek Drive, all in steel/PVC conduit with one spare.

Opportunity text

The transmission line scope of work consists of the installation of two (2) new single circuit 2-pole deadend steel monopole structures, three (3) new double circuit deadend steel monopole structures, four (4) new double circuit tangent steel monopoles, twelve (12) new single circuit tangent steel monopole structures, fifteen (15) new single circuit deadend steel monopole structures, and three (3) new single circuit angle steel monopole structures, with thirty eight (38) new spans of bundled 959 ACSS/TW, thirty eight (38) new spans of OPGW (four (4) splices at Centerville Sub, Strs. 1/6, 3/4, and 3/10 ), the removal of forty-seven (47) existing spans of 795 ACSR, forty-seven (47) existing spans of 3/8 EHS shield wire, and the removal/topping (above distribution) of forty-six (46) existing steel monopole structures. Existing double circuits to Miller and Lyons to be transferred to new deadend monopole structures. The underbuilt distribution line scope of work consists of the installation of eleven (11) new double circuit deadend steel monopole structures, fourteen (14) new double circuit tangent steel monopole structures, sixteen (16) new double circuit deadend/riser monopole structures, and five (5) new double circuit steel tangent/riser structures. The underground distribution line scope of work consists of the installation of two (2) circuits of one thousand (1,000) feet of 1,000 kcmil cable, outside Centerville Substation under S. Glenbrook Dr. and W. Centerville Rd, and twenty-one (21) 1,000 kcmil feeder dips along Duck Creek Dr., all utilizing 6 steel/PVC conduit w/ an additional spare.

Files

File Type Posted
IFB_Centerville_Oates.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity