IFB_Centerville_Oates.pdf

PDF 42 MB Posted

Attached to
Oates to Centerville Transmission Line Construction Services (GP&L)
Solicitation number
25002833.002A
Issued by
Dallas County, Garland City, Texas

About this file

Summary of IFB_Centerville_Oates.pdf

This Invitation for Bid (IFB) document pertains to transmission and distribution line construction services for GP&L in Texas. The project scope encompasses the installation of multiple steel monopole structures categorized by circuit type and function, including two single-circuit 2-pole deadend structures, three double-circuit deadend structures, four double-circuit tangent structures, twelve single-circuit tangent structures, fifteen single-circuit deadend structures, and three single-circuit angle structures. The transmission line work includes installation of thirty-eight spans of bundled 959 ACSS/TW conductor and thirty-eight spans of OPGW cable with splices at Centerville Substation, along with removal of forty-seven existing spans of 795 ACSR conductor, forty-seven spans of 3/8 EHS shield wire, and removal or topping of forty-six existing steel monopole structures. The underbuilt distribution scope requires installation of eleven double-circuit deadend monopole structures, fourteen double-circuit tangent structures, sixteen double-circuit deadend/riser structures, and five double-circuit tangent/riser structures. Underground distribution work involves installation of two circuits of 1,000-foot runs of 1,000 kcmil cable beneath South Glenbrook Drive and West Centerville Road outside Centerville Substation and twenty-one 1,000 kcmil feeder dips along Duck Creek Drive, all utilizing six steel/PVC conduits with one spare.

The document does not explicitly specify pricing terms, bid amounts, response deadlines, site visit dates, pre-bid conferences, award dates, contract duration, renewal options, set-asides, incumbent status, or funding sources within the provided file materials. Additional contract details regarding financial terms, scheduling, and bidding procedures would require review of supplementary IFB documentation not presented in this summary.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .