North Woodbridge Pedestrian Bridge

Closed State & local contract opportunity Posted

Solicitation number
700629-27
State
Virginia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Prince William County is soliciting bids for the North Woodbridge Pedestrian Bridge project on Route 1 (Richmond Highway) in Prince William County, Virginia, with proposals due September 24, 2026.

The scope encompasses design and construction of a prefabricated steel truss pedestrian bridge with switchback ramps connecting the future Riverside Station development, the existing Virginia Railway Express Woodbridge Station, and local pedestrian and cyclist facilities. Work includes erosion control installation, clearing and grubbing, grading, excavation, storm sewer pipe supply and installation, fence installation, drainage structures, curb and gutter, concrete sidewalk, asphalt paving and mill and overlay operations, and traffic maintenance measures throughout construction. The bridge location spans Route 1 between Gordon Boulevard and the intersections of Occoquan Road and Dawson Beach Road.

The attached project description document (842295bridgePrWm.pdf, posted September 8, 2026) does not disclose contract value, contract term, evaluation criteria, pre-bid meeting or site-visit schedules, question deadlines, incumbent contractor, or funding source.

Opportunity text

The North Woodbridge Pedestrian Bridge Project is located on Route 1 (Richmond Highway) between Gordon Boulevard and the intersections of Occoquan Road and Dawson Beach Road in Prince William County. The purpose of this project is to build a pedestrian bridge that will connect the future Riverside Station development (by others), the existing Virginia Railway Express (VRE) Woodbridge Station, and local pedestrian/cyclist facilities. The proposed bridge will be a prefabricated steel truss structure with switchback ramps. Gene rally, Work includes installation of erosion control devices, clearing and grubbing, grading, excavation, supplying and installing storm sewer pipe, fence, drainage structures, curb and gutter, concrete sidewalk, asphalt paving, mill and overlaying, and all measures required for the maintenance of traffic during construction.