About this opportunity

This contract opportunity is for the replacement of chilled water valves in Mechanical Valve Pits MVP-5 and MVP-6 in Orange County, Florida. The purpose of the work is to replace two 20-inch isolation valves in MVP-5 and two 16-inch isolation valves in MVP-6, which serve as future connections to the chilled water system from the Central Energy Plant. The work includes demolition of the existing valves and installation of new chilled water valves, along with new valve insulation and extensions. The contractor will be responsible for providing all supervision, labor, materials, and equipment required to complete the project. Prior to commencing work, the contractor must verify all measurements and coordinate with the Central Florida Tourism Oversight District (CFTOD) Utilities Engineering to resolve any differences with the design documents. All information gathered will be included in the contractor's as-built documentation.

The contract opportunity is being hosted on the CFTOD's new PlanetBids platform, which is available for free to all bidders. The District has bid preferences for local vendors, veteran small businesses, and opportunity zone businesses on most solicitations. Bids must be submitted electronically through the PlanetBids platform by the due date of April 9, 2024. The value or budget range for this contract opportunity is not specified in the provided information.

Opportunity text

The purpose of this scope of work is to replace chilled water valves located within MVP-5 and MVP-6, which serve as future connections to the chilled water system throughout the MK West Loop Chilled Water ("CHW") main from the Central Energy Plant ("CEP"). Work includes the demolition of the existing valves and installing the new CHW valves. New valve insulation and extensions will be installed to facilitate future maintenance. The new valves and piping will be coated/insulated in accordance with the Contract Documents. Section of CHW piping, valves, and other appurtenances will also be added and/or replaced as part of this scope.

The Contractor shall supply all supervision, labor, materials, and equipment required to replace two (2) existing 20" isolations valves (19S and 20R) within Mechanical Valve Pit MVP #5 and two (2) existing 16" isolations valves (2S and 1R) within Mechanical Valve Pit MVP #6.

Prior to the commencement of work, the Contractor shall enter the valve pit, verify all measurements provided, obtain any and all measurements that were not provided, and compare all information obtained with the design documents. The Contractor shall work with Central Florida Tourism Oversight District ("CFTOD") Utilities Engineering to resolve any differences, whether material or not, throughout the entire project. All information gathered shall be included as part of the Contractor's supplied as-builts.

Files

File Type Posted
C006561 MFMP ITB Flyer.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors