Newman Substation Rebuild Control Enclosure
Open State & local contract opportunity Posted
- Solicitation number
- REQ00003478
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Teresa Smith tsmith@garlandtx.gov
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
GP&L has posted a substation network design guide for the Newman Substation Rebuild Control Enclosure in Texas, with a response due date of December 10, 2026. The attached Revision 7 document is a technical standard, not a formal solicitation, and it sets no set-aside, preference, or eligibility restriction. The manufacturer must engineer, design, and furnish IP-based communications components, including panel and rack locations with necessary power for network switches, a rack location for network firewalls, and cable management such as trays, rails, racks, and covers for control buildings. The standards are subject to change for reasons including but not limited to product lifecycle and availability, compliance standards, security standards, and business decisions. GP&L is responsible for procuring, configuring, and installing all specified network devices.
The guide applies a tiered hardware strategy by site. Sites inside the GP&L fiber ring in Dallas, Collin, and Hunt counties use Cisco C9200L-24T-4X-E transport switches, Palo Alto Networks PAN-PA-1410 firewalls, and Cisco C9200L-24P-4G-E DMZ switches. Remote sites outside the ring, or with elevated network criticality, use ruggedized Cisco IE-9320-22S2C4X-E transport switches and dual-unit firewall HA pairs with redundant power and fan-less design. All sites use Cisco IE-9310-26S2C-E SCADA switches with dual power supplies, and medium-impact sites add Cisco IE-4010-16S12P PACS switches for card reader connectivity. The Cisco and Palo Alto Networks product requirements are brand-specific and filter bidders to those manufacturers' equipment.
Place of performance is Texas, covering Dallas County and Garland City under three separate FIPS-coded jurisdictions. The source names no contract value, term, incumbent, evaluation criteria, or pre-bid event. The posting date is November 23, 2026.
Opportunity text
This document provides information related to substation build and rebuild projects. The standards, components, and configurations are subject to change for reasons including but not limited to product lifecycle and availability, compliance standards, security standards, and business decisions. The manufacturer shall engineer, design, and furnish the following IP-based communications components: Panel and/or rack locations for network switches Rack location for network firewall(s) These locations shall include necessary power per data sheets for the specific network devices. The vendor data sheets are listed throughout this document. This information will include the following: Power requirements Device size and measurements Number of physical ports and media type of these ports Operating conditions (ie: temperature range) These locations shall include cable management components such as trays, rails, racks, and covers facilitating manageability, aesthetics, and protection between locations in the control building(s).
Files
| File | Type | Posted |
|---|---|---|
| networkDesign_Substations_v7_20250815.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity