Newman Substation Rebuild Control Enclosure
Solicitation number
REQ00003478
Issued by
Dallas County, Garland City, Texas

About this file

This is a Substation Network Design Guide (Revision 7, dated August 15, 2025) prepared by GP&L (likely Oncor Electric Delivery, based on the Texas jurisdiction and service area references) establishing technical standards for substation build and rebuild projects in the control enclosure. The guide specifies IP-based communications components required for substation network infrastructure, including panel and rack locations for network switches and firewalls with necessary power provisions, cable management systems (trays, rails, racks, and covers), and detailed specifications from vendor datasheets covering power requirements, device dimensions, port specifications, and operating conditions. The document does not specify project quantities, response dates, due dates, site visits, bidder meetings, award dates, or contract terms, as it functions as a technical specification standard rather than a formal solicitation document.

The guide establishes a tiered hardware strategy differentiated by site location and criticality. For sites within the GP&L fiber ring (Dallas, Collin, and Hunt counties), standard equipment includes Cisco C9200L-24T-4X-E transport switches, Palo Alto Networks PAN-PA-1410 firewalls, and Cisco C9200L-24P-4G-E DMZ switches. For remote sites outside the fiber ring or with elevated network criticality, more ruggedized Cisco IE-9320-22S2C4X-E transport switches and dual-unit firewall HA-pairs are deployed, with additional redundant power supplies and fan-less technology designed for harsh environments. All sites utilize Cisco IE-9310-26S2C-E SCADA switches with dual power supplies, while medium-impact sites require additional Cisco IE-4010-16S12P PACs switches for card reader connectivity. The document notes that equipment specifications may change based on product lifecycle, availability, compliance standards, security requirements, and business decisions, with GP&L responsible for procuring, configuring, and installing all specified network devices.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBSTATION NETWORK DESIGN GUIDE

DATE: 8/15/2025

REV: 7

I. SCOPE

This document provides information related to substation build and rebuild projects. The standards, components, and configurations are subject to change for reasons including but not limited to product lifecycle and availability, compliance standards, security standards, and business decisions.

The manufacturer shall engineer, design, and furnish the following IP-based communications components:

• Panel and/or rack locations for network switches

• Rack location for network firewall(s)

These locations shall include necessary power per data sheets for the specific network devices.

The vendor data sheets are listed throughout this document. This information will include the following:

• Power requirements

• Device size and measurements

• Number of physical ports and media type of these ports

• Operating conditions (ie: temperature range)

These locations shall include cable management components such as trays, rails, racks, and covers facilitating manageability, aesthetics, and protection between locations in the control building(s).

II. STANDARD EQUIPMENT

The following list of equipment is based on the current standard used by GP&L. GP&L will procure, configure, and install the equipment listed below. There may be instances where equipment specifications, makes, models and other components need to be changed due to special requirements.

Those changes will be handled where appropriate and communicated with necessary parties.

A. TRANSPORT SWITCH

A transport switch (TSW) will be utilized for bringing in network communications to the stations.

This switch will connect the site with other sites in an upstream/downstream (inline) format or in a spur configuration, depending on the project parameters.

The TSW will be installed in a two-post communications rack, which should be in close proximity with the fiber panels where the fiber connectivity is terminated. The transport switch model will depend on location proximity to GP&L support staff and/or site criticality. In areas outside of the GP&L fiber ring, more ruggedized TSW models will be deployed.

1. GP&L Fiber Ring For sites within the GP&L fiber ring, which traverse Dallas, Collin, & Hunt counties, the following

TSW hardware strategy will be used:

TSW Make: Cisco

TSW Model: C9200L-24T-4X-E

REV: 7

TSW PSU: The default PSU for this switch model is leveraged; see data sheet. Secondary

TSW PSUs are not currently being leveraged for sites within our fiber ring (local).

TSW Data Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9200-series-switches/nb-06-cat9200-ser-data-sheet-cte-en.html

2. Remote Sites For sites outside of the GP&L fiber ring and/or where site network criticality is elevated, the following TSW hardware strategy will be used:

TSW Make: Cisco

TSW Model: IE-9320-22S2C4X-E

TSW PSUs (x2): PWR-RGD-AC-DC-H

TSW Data Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie9300-rugged-series/catalyst-ie9300-rugged-series-ds.html?ccid=cc004022&oid=dstit027989&dtid=odicdc000509

This TSW make/model supports redundant power supplies and fan-less ruggedized technology, which permits the unit to continue operation in harsh environments. These additional redundancies are preferred for the remote sites where it may take hours or more for TSG personnel to arrive onsite. This

TSW make/model is considerably more expensive than the make/model being utilized within the GP&L fiber ring. The two different TSWs referenced above have different power requirements.

B. FIREWALL

A firewall (FW) will be utilized for security, routing, and troubleshooting. The FW connects the

TSW to the site’s SCADA devices and physical security devices.

The FW will be installed in the same 2-post rack as the TSW. Similar to the TSW, the FW make/model will depend on location proximity to GP&L support staff and/or site criticality.

1. GP&L Fiber Ring For sites within the GP&L fiber ring, which traverse Dallas, Collin, & Hunt counties, the following

FW hardware strategy will be used:

FW Make: Palo Alto Networks

FW Model: PAN-PA-1410

FW SECONDARY PSU: PAN-PWR-450W-AC

FW Data Sheet:

https://www.paloaltonetworks.com/apps/pan/public/downloadResource?pagePath=/c ontent/pan/en_US/resources/datasheets/pa-1400-series https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9200-series-switches/nb-06-cat9200-ser-data-sheet-cte-en.html https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9200-series-switches/nb-06-cat9200-ser-data-sheet-cte-en.html https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie9300-rugged-series/catalyst-ie9300-rugged-series-ds.html?ccid=cc004022&oid=dstit027989&dtid=odicdc000509 https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie9300-rugged-series/catalyst-ie9300-rugged-series-ds.html?ccid=cc004022&oid=dstit027989&dtid=odicdc000509 https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie9300-rugged-series/catalyst-ie9300-rugged-series-ds.html?ccid=cc004022&oid=dstit027989&dtid=odicdc000509 https://www.paloaltonetworks.com/apps/pan/public/downloadResource?pagePath=/content/pan/en_US/resources/datasheets/pa-1400-series https://www.paloaltonetworks.com/apps/pan/public/downloadResource?pagePath=/content/pan/en_US/resources/datasheets/pa-1400-series

REV: 7

2. Remote Sites For sites outside of the GP&L fiber ring and/or where site network criticality is elevated, the same FW hardware will be used and deployed in an HA-pair. This means 2 physical devices and required licensing will be deployed, increasing the cost and redundancy.

C. DMZ SWITCHES

A DMZ (DMZSW) switch will be utilized for connecting the physical security devices such as cameras and card readers to the FW. NOTE – at NERC-CIP medium rated sites, the Infinias card readers terminate on the SCADA switches instead of the DMZ switches.

The DMZSW will be installed in the same 2-post rack as the TSW and FW. Similar to the TSW, the

DMZ switch make/model will depend on location proximity to GP&L support staff and/or site criticality.

1. GP&L Fiber Ring For sites within the GP&L fiber ring, which traverse Dallas, Collin, & Hunt counties, the following

DMZ switch hardware strategy will be used:

DMZSW Make: Cisco

DMZSW Model: C9200L-24P-4G-E

DMZSW PSU: The default PSU for this switch model is leveraged; see data sheet.

Secondary DMZSW PSUs are not currently being leveraged for sites within our fiber ring (local).

DMZSW Data Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9200-series-switches/nb-06-cat9200-ser-data-sheet-cte-en.html

2. Remote Sites For sites outside of the GP&L fiber ring and/or where site network criticality is elevated, the following DMZ switch hardware strategy will be used:

DMZSW Make: Cisco

DMZSW Model: IE-4010-4S24P

DMZSW PSUs (x2): PWR-RGD-AC-DC-250

DMZSW Data Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-4010-series-switches/datasheet-c78-737279.html

3. Yard Switches For any site where a DMZ switch is needed in the substation yard (most likely use case would be cameras), the following DMZ switch hardware strategy will be used. This switch and single PSU mount on DIN-rail using 120V AC or 125V DC power. Typically these are deployed inside enclosures mounted to poles in the yard – See David Godfrey and/or the physical security team for additional details.

DMZSW Make: Cisco https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9200-series-switches/nb-06-cat9200-ser-data-sheet-cte-en.html https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-9200-series-switches/nb-06-cat9200-ser-data-sheet-cte-en.html https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-4010-series-switches/datasheet-c78-737279.html https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-4010-series-switches/datasheet-c78-737279.html

REV: 7

DMZSW Model: IE-3200-8P2S-E

PSU Model: PWR-IE480W-PCAC-L

DMZSW Data Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie3200-rugged-series/cat-ie3200-rugged-series-ds.html

PSU DATA Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-switches/datasheet-c78-742180.html

D. SCADA SWITCHES

One or more SCADA (SW) switches will be utilized for connecting SCADA IEDs, meters, RTUs, HMIs, battery chargers, and/or other site network devices required to communicate within or outside of the site.

The SW will be installed in the site’s communication panel, which is typically the same location where the RTU(s) resides. The following hardware strategy will be used across all sites unless otherwise directed or noted:

SW Make: Cisco

SW Model: IE-9310-26S2C-E

PSU MODEL: PWR-RGD-AC-DC-H (x2)

SW Data Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie9300-rugged-series/catalyst-ie9300-rugged-series-ds.html

E. PACs SWITCHES At least one PACs switch will be utilized at medium-impact sites only to connect the ei32dc card readers back to the network for communications related to the card readers. This switch will also provide power (PoE) to each card reader, which is required for card reader operation.

The SW will be installed in the 2-post rack below the DMZ switch. The SW also will utilize 2 power supply units requiring 2 fused 125V DC circuits.

SW MAKE: Cisco

SW MODEL IE-4010-16S12P

DMZSW PSUs (x2): PWR-RGD-AC-DC-250

SW & PSU DATA Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie3200-rugged-series/cat-ie3200-rugged-series-ds.html https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie3200-rugged-series/cat-ie3200-rugged-series-ds.html https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-switches/datasheet-c78-742180.html https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-switches/datasheet-c78-742180.html https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie9300-rugged-series/catalyst-ie9300-rugged-series-ds.html https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie9300-rugged-series/catalyst-ie9300-rugged-series-ds.html

REV: 7

https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-4010-series-switches/datasheet-c78-737279.html

III. OTHER EQUIPMENT

In addition to the standard equipment list, other items will be required for the network communications. GP&L will procure, configure, and install the equipment listed in bullet points below.

For reference, GP&L procured network devices include the devices already cited in this document. It does not include SCADA IEDs and other devices procured outside of GP&L Tech Services Group (TSG).

• SFP modules

• Patch panels and keystones

• CAT 5e and/or CAT 6 Ethernet cables for connectivity between GP&L procured network devices.

• SM and/or MM fiber jumpers for connectivity between GP&L procured network devices

A. BESS Wholesale Meter Switch When required, the following switch will be used to connect any BESS wholesale meters in the presumed non-GP&L BESS enclosure. This switch will connect back via SM fiber directly to the appropriate SFP port on the GP&L station FW.

SW MAKE: Cisco

SW MODEL: IE-3300-8T2S

PSU MODEL: PWR-IE50W-AC-L

SW DATA Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie3300-rugged-series/catalyst-ie3300-rugged-series-ds.html#table8

PSU DATA Sheet:

https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-switches/datasheet-c78-742180.html

NOTE: If SFP slots are needed on the downlink plane, we would need to add the IEM-

3300-8S= expansion module to the IE-3300.

B. Wireless Data Antenna For remote sites where the need for 4G or 5G mobile provider data links are required, an antenna needs to be mounted and installed on the exterior of the control building. The building manufacturer shall procure and install the antenna above the roofline of the building.

The current antenna components are listed below:

1. Antenna Make: Proxicast https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-4010-series-switches/datasheet-c78-737279.html https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-4010-series-switches/datasheet-c78-737279.html https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie3300-rugged-series/catalyst-ie3300-rugged-series-ds.html#table8 https://www.cisco.com/c/en/us/products/collateral/switches/catalyst-ie3300-rugged-series/catalyst-ie3300-rugged-series-ds.html#table8 https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-switches/datasheet-c78-742180.html https://www.cisco.com/c/en/us/products/collateral/switches/industrial-ethernet-switches/datasheet-c78-742180.html

REV: 7

Model: ANT-126-002

Data Sheet:

https://www.proxicast.com/shopping/proxicast-high-gain-10-dbi-universal-wide-band-4g-lte-5g-wifi-omni-directional-outdoor-pole-wall-mount-antenna.html

2. Cable Make: Proxicast

Model: ANT-140-020-50 (50 foot variation – CFD 400)

Data Sheet:

https://www.proxicast.com/shopping/extension-cable-select-length-sma-male-to-n-male.html?variation_id=30094

The manufacturer shall install a conduit and junction box similar to the picture below in order to complete the installation. This installation shall be weather resistant.

https://www.proxicast.com/shopping/proxicast-high-gain-10-dbi-universal-wide-band-4g-lte-5g-wifi-omni-directional-outdoor-pole-wall-mount-antenna.html https://www.proxicast.com/shopping/proxicast-high-gain-10-dbi-universal-wide-band-4g-lte-5g-wifi-omni-directional-outdoor-pole-wall-mount-antenna.html https://www.proxicast.com/shopping/proxicast-high-gain-10-dbi-universal-wide-band-4g-lte-5g-wifi-omni-directional-outdoor-pole-wall-mount-antenna.html https://www.proxicast.com/shopping/extension-cable-select-length-sma-male-to-n-male.html?variation_id=30094 https://www.proxicast.com/shopping/extension-cable-select-length-sma-male-to-n-male.html?variation_id=30094

REV: 7

Inside the building, the antenna cable shall be run in conduit or some type of cable management over to the 2-post rack where the TSW, FW, & DMZ switch reside.

3. Modem GP&L will procure, install, configure and deploy the modem. Currently, GP&L is planning to use a Palo Alto series 5G integrated firewall to replace the Sierra modems we were using in the past. This firewall functions both as a firewall and 5G modem and will physically mount on a rack-kit in the

DMZ/WAN 2-post rack within the same proximity as the substation SCADA firewalls.

Make: Palo Alto Networks

Model: PA-415-5G

Data Sheet:

https://www.paloaltonetworks.com/resources/datasheets/pa-400-series

II. REVISION HISTORY

REV # REV DATE REV NOTES

6 3/21/2025 Added PA-415 hardware for cellular data scenarios

7 8/15/2025 Changed PA-450 to PA-1410 & removed subsection (a) for FW hardware; started revision history tracking https://www.paloaltonetworks.com/resources/datasheets/pa-400-series