NEW BID DATE - Repair and Replace Water Supply System - Prairie View Rest Area, I-57
Closed State & local contract opportunity Posted
- Solicitation number
- 630-637-003-02 (NEW BID DATE)
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Abraham Allen abraham.allen@illinois.gov
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Capital Development Board is soliciting bids to repair and replace the water supply system at the Prairie View Rest Area on Interstate 57 in Will County, with bids due November 18, 2026 at 11:00 a.m. The solicitation carries MBE/WBE subcontracting and supplier goals and a Project Labor Agreement (PLA).
The revised solicitation supersedes earlier dates, which moved from an original October 5, 2026 bid date to November 10 and then to November 18, 2026. The October 15, 2026 prebid meeting, previously described as mandatory, is non-mandatory in the revised version. It is scheduled for 10:30 a.m. at the South Bound location.
The scope is a complete overhaul of the aging water supply infrastructure, including full removal, repair, and replacement; entirely new supply lines and plumbing throughout the site; fixture replacement with modern alternatives; and structural rehabilitation of facility structures tied to the water supply infrastructure. Primary work takes place at the South Bound Prairie View Rest Area at SB MM333 on I-57 in Monee, Will County, Illinois. The design also maintains and supports utility requirements for the North Bound rest stop.
The project is classified as General Remodeling and Rehabilitation (81) with an estimated cost range of less than $1.5 million and will be delivered under a single prime method. Plans are available from Robinson Engineering, Ltd. in Frankfort, Illinois, for a $100 deposit. The project manager is Abraham Allen, reachable at (312) 599-2553 or Abraham.Allen@illinois.gov.
Opportunity text
Complete System Overhaul: Full removal, repair, and replacement of the aging existing water supply system. Plumbing & Lines: Installation of entirely new water supply lines and necessary plumbing work throughout the site. Fixture Replacement: Updates to modern, reliable water fixtures. Structural Rehabilitation: Required restoration of existing facility structures directly impacted by or tied to the water supply infrastructure. Site Focus: Primary execution takes place at the South Bound Prairie View Rest Area located at SB MM333 on I-57 in Monee, Will County, IL. A comprehensive strategy is also engineered to maintain and fully support utility requirements for the North Bound rest stop.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity