About this opportunity
St. Charles County Parks Department is soliciting sealed lump-sum bids to design, permit, furnish, construct, test, and complete a new 60-foot-by-60-foot engineered wood post-frame maintenance building at New Melle, with bids due October 13, 2026.
The scope is a turnkey, contractor-designed facility with a 16-foot nominal eave height, 4:12 roof slope, 6-inch welded-wire-reinforced concrete floor, and twelve-foot-wide exterior concrete aprons on all four sides. The structure must include metal roof and wall panels; three insulated 14-foot-by-14-foot overhead doors with operators and three 3-foot-by-7-foot personnel doors; insulation and condensation control; winter heating; mechanical ventilation with one 14-foot HVLS fan; underground 800-amp electrical service with two 400-amp distribution panelboards, each supplied by a 400-amp feeder; interior and exterior lighting; general-purpose and welding receptacles; combination emergency eye wash and shower station; utility sink; sanitary holding tank; roof-storm drainage; site grading, clearing, and restoration; asphalt transition work; and fire and life-safety systems as required by code and the Authority Having Jurisdiction. All work must result in a complete, code-compliant, operational facility.
The bid must be submitted as a sealed lump sum. The attached specification document (3 MB, posted September 30, 2026) contains detailed engineering and design criteria.
Opportunity text
St. Charles County Parks Department is soliciting sealed lump-sum Bids to design, permit, furnish, construct, test, and complete a new 60-foot-by-60-foot engineered wood post-frame maintenance building with: A 16-foot nominal eave height and sufficient clearances for the required doors and equipment. A 4:12 roof slope. A 6-inch welded-wire-reinforced concrete floor. Twelve-foot-wide exterior concrete aprons on all four sides. Metal roof and wall panels. Three insulated 14-foot-by-14-foot overhead doors. Three 3-foot-by-7-foot personnel doors. Insulation and condensation control. Winter heating. Mechanical ventilation. One 14-foot HVLS fan. An underground 800-amp electrical service. Two 400-amp distribution panelboards, each supplied by a 400-amp feeder. Interior and exterior lighting. General-purpose and welding receptacles. Overhead-door operators. Combination emergency eye wash and shower station. Utility Sink. Sanitary Holding Tank. Roof-storm drainage. Site grading, clearing, and restoration. Asphalt transition Work. Fire/life-safety systems required by the accepted design and AHJ. Other associated improvements necessary for a complete, code-compliant, operational facility. The Work is intended as a turnkey, contractor-designed project.
Files
| File | Type | Posted |
|---|---|---|
| ICC and New Melle Maintenance Facility.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity