M/WBE & SDVOB Subcontractor & Supplier Opportunity :CUNY Queensborough Community College RFK Hall Gym - Locker & Shower Room Renovation & Associated Asbestos Abatement

Closed State & local contract opportunity Posted

Solicitation number
2139650
State
New York
Responses due

Opportunity facts

Jurisdiction
Points of contact

Updated .

About this opportunity

Cube Construction Services LLC is soliciting proposals from M/WBE and SDVOB subcontractors and suppliers for the Queensborough Community College RFK Hall Gym Locker & Shower Room Renovation & Associated Asbestos Abatement project, located at 221-5 56th Ave, Bayside, NY 11364, with proposals due October 14, 2026. This is a subcontractor and supplier opportunity under a prime contractor, not a direct agency solicitation.

The scope spans substantial renovation of locker and shower facilities across the cellar, mezzanine, and main floors, including asbestos and ACM abatement, selective interior demolition of partitions, doors, ceilings, finishes, and existing lockers; masonry work including CMU partition installation and infill at removed openings; cold-formed metal framing and miscellaneous metal fabrications; millwork with fire-retardant blocking for wall-hung fixtures; and MEP and fire alarm upgrades. Work also encompasses ADA accessibility improvements, gender-neutral and family restroom incorporation, and plumbing fixture expansion. Project drawings, specifications, addenda, and photos are available via the provided Dropbox link.

The solicitation explicitly targets M/WBE (minority- and women-owned business enterprise) and SDVOB (service-disabled veteran-owned business) participation. No contract value, term, or specific evaluation criteria are stated in the source material. The project is located in Queens County, New York, within the City University of New York system.

Opportunity text

Cube Construction Services LLC is soliciting proposals for the Queensborough Community College- RFK Hall Gym- Locker & Shower Room Renovation & Associated Asbestos Abatement project, located at 221-5 56th Ave, Bayside, NY 11364. Please use the link below to access the project drawings, specifications, addenda, and photos: https://www.dropbox.com/scl/fo/9jyzggtpf487jrb095xcw/AGN0vsdQK57P8qA1RDC88D8?rlkey=73jzzu31wo7w076o5iuxd062p&st=99wqt636&dl=0 Brief Scope of Work: The project involves the renovation of the locker and shower facilities at Robert F. Kennedy Hall, Queensborough Community College. The scope of work includes substantial layout upgrades on the cellar floor, along with minor renovations on themezzanine and main floors to improve aesthetics, enhance ADA accessibility, increase plumbing fixture counts, incorporate gender-neutral/family restrooms, and improve overall circulation. All areas included within the scope of work will receive MEP and fire alarm (FA) upgrades, which are being filed under separate applications. All other areas of the building not identified within the scope of work will remain existing and unchanged. The scope of work includes, but is not limited to: Abatement Perform asbestos & ACM abatement as indicated in the documents. Demolition: Selective interior demolition of partitions, CMU, doors, ceilings, finishes, millwork, toilet partitions, and the rolling shutter. Remove existing lockers, abandoned conduit, and abandoned piping. Masonry Perform CMU partition work, infill at removed openings, and patching of existing CMU walls. Install lintels at new openings in masonry walls. Metals Furnish and install cold-formed metal framing and miscellaneous metal fabrications. Provide lintels, overhead supports for toilet and shower partitions, and fixture and equipment supports. Furnish and install powder-coated metal column wraps in Corridor. Millwork Furnish and install fire-retardant blocking for all wall-hung fixtures, accessories, and equipment. Furnish and install plastic laminate casework, counters, and corridor niche millwork. Furnish and install Corian solid-surface countertops. Waterproofing Furnish and install fluid-applied and sheet waterproofing at all shower and wet-area floors and walls. Openings Furnish and install Hollow Metal doors and frames as required. Furnish and install Door hardware. Furnish and install access doors. Furnish and install glazing and mirrors. Furnish and install upward coiling security grille. Drywall & Ceilings Provide and install metal stud framing, gypsum board partitions, shaft walls & GWB Ceilings & soffits. Provide and install acoustical ceiling systems, including Ceramaguard high-humidity tile and grid. Specialties Furnish and install toilet, shower, and changing room partitions and urinal screens. Furnish and install toilet and bath accessories. Furnish and install interior signage systems. Furnish and install corner guards, fire extinguisher cabinets, fire extinguishers, and roller shades. Controls / BAS Furnish and install DDC controls for all terminal units, dampers, and radiation valves. Integrate all new controls with the existing campus BAS, including programming and graphics. Fire Protection Demolish and relocate existing sprinkler piping and heads in renovated areas. Furnish and install a new floor control valve assembly off the existing standpipe, and new sprinkler heads. Plumbing Demolish existing plumbing systems, fixtures, and piping as indicated. Install complete domestic water, sanitary, waste, and vent systems, including underslab piping. Provide all piping, valves, hangers, supports, insulation. Furnish and install all plumbing fixtures, carriers, floor drains, linear shower drains, and trap primers. HVAC Demolish existing ductwork and air terminals in the areas of construction. Furnish and install supply, exhaust, and return ductwork, diffusers, grilles, and accessories. Furnish and install hot-water reheat piping, convectors, and finned-tube radiation. Clean existing duct systems and provide all insulation. Electrical Demolish existing equipment, devices, etc as per contract documents. Install new electrical receptacles, electrical installation of HVAC units, etc. Install new luminaires, lighting switches, lighting control devices, etc. Fire Alarm Remove and relocate existing fire alarm devices in renovated areas. Furnish and install new addressable devices, notification appliances, and damper and fan control modules on the existing Notifier system. Provide programming, filing, and FDNY acceptance testing. Low Voltage / IT Furnish and install Cat 6A cabling, data outlets and other work as per contract documents. Proposal Requirements Labor, Materials, and EquipmentPermits and InspectionsSchedule acknowledgmentAny exclusions or clarifications Please note that this project is subject to PLA (Project Labor Agreement) requirements. Submit your proposal and NYSDOL certificate by October 12, 2026. Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 18.00% WBE Goal: 12.00%

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors