Mulberry Riverwalk Trail Improvements

Closed State & local contract opportunity Posted

Solicitation number
PE-67890-NONST-2025-000000005
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

This state and local contract opportunity is for the Mulberry Riverwalk Trail Improvements project in Barrow County, Georgia. The procurement is for Construction Manager at Risk (CMAR) services to construct approximately 5,000 linear feet of an 8-foot-wide gravel slate chip trail with various amenities, including recycled plastic railroad tie side rails, weed control barrier, signage, picnic tables, water fountains, police call boxes, concrete bench pads, and dog waste receptacles. The site work also involves clearing, grubbing, light grading, drainage improvements, and erosion control measures. The Owner is requesting Statements of Qualifications from CMAR organizations to be submitted by October 31, 2024. The anticipated CMAR contract price is approximately $1,783,000 with a construction duration of 180 days. Questions regarding the Request for Qualifications (RFQ) must be received by October 23, 2024, and copies of the RFQ package, including design drawings, technical specifications, and a geotechnical report, can be obtained from Engineering Management, Inc. for a non-refundable fee.

This RFQ does not specify any set-aside designations or restrictions on the types of organizations that can respond. The addendum indicates that subcontractors can be used, and details are provided on the retaining wall and fencing requirements. No bid schedule or pricing information is required at this time, as this is a request for qualifications only, with cost discussions to be handled at a later date. The existing contract holder or incumbent vendor is not identified.

Opportunity text

The installation of approximately 5,000 L.F. of 8-foot-wide gravel slate chip trail with recycled plastic railroad tie side rails, weed control barrier, signage, picnic tables, water fountains, police call boxes, concrete bench pads, and dog waste receptacles. Site work includes clearing, grubbing, light grading, drainage improvements, and erosion control measures.

Files

File Type Posted
Braselton Mulberry Riverwalk Trail RFQ_Full A.pdf PDF
Addendum 1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity