Addendum 1.pdf

PDF 35 KB Posted

Attached to
Mulberry Riverwalk Trail Improvements
Solicitation number
PE-67890-NONST-2025-000000005
Issued by
Barrow County, Georgia

About this file

This document is an Addendum for the Mulberry Riverwalk Trail Improvements project in the Town of Braselton, Georgia. The project involves the installation of approximately 5,000 L.F. of 8-foot-wide gravel slate chip trail with recycled plastic railroad tie side rails, weed control barrier, signage, picnic tables, water fountains, police call boxes, concrete bench pads, and dog waste receptacles. The site work includes clearing, grubbing, light grading, drainage improvements, and erosion control measures. This is a Construction Manager at Risk (CMAR) project, and the contractor will be required to provide minimal engineering services, obtain an LDP, and potentially other permits.

The addendum clarifies that subcontractors can be used, provides details on the retaining wall and fencing requirements, and states that this is a request for qualifications only, with cost discussions to be handled at a later date. No bid schedule or pricing information is required at this time.

View the file

Other files

File Type Posted
Braselton Mulberry Riverwalk Trail RFQ_Full A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 1 -

ADDENDUM NO. ONE (1)

TOWN OF BRASELTON

MULBERRY RIVERWALK TRAIL IMPROVEMENTS

EMI PROJECT NUMBER 19-007

ISSUED OCTOBER 25, 2024

The following items of the RFQ are modified as part of this Addendum:

Section I. Procurement and Contract Requirements

RTP Rules and Regulations

Compliance with Law: Selected Contractor shall comply with all federal, state, and local laws, regulations, executive orders, and ordinances applicable to the Agreement or to implementation of the Project, including without limitation 23 USC 206 and ORS 390.980 which makes funds available for the purposes of RTP. Key regulations include, but are not limited to:

23 CFR 771, Environmental Regulations 23 CFR 635.410 Buy America 49 CFR 29, Suspension and Debarment 29 CFR 3, Anti-Kickback (Copeland Act) 23 USC 113, Prevailing Wage Rate (Davis Bacon Act)

Clarifications

The following are clarifications based on questions received.

1. My company provides most of the services required to complete this project, but not everything. Can I team with subcontractors?

Response: Yes. Please include subcontractor(s) information and references in SOQ package.

2. I noticed that the plans included in the RFQ are Conceptual. Also, the contract documents mention that engineering services will need to be supplied by the Contractor. How much engineering is going to be required for this project? Also, will we need to file and LDP or other permits?

Response: The intent of the CMAR nature of the project is to have the Contractor lead the construction process and provide whatever minimal engineering is needed to complete the project. There is a retaining wall on the project that will need to be designed. Also, the Contractor will need to have a civil engineer available for things that may arise such as minor storm drainage design or pedestrian accommodations, etc. An LDP will be required, as well as other potential permits such as a stream buffer variance. The conceptual landscape architectural plans will be used as the basis for the landscaping design and general trail alignment during construction. Exact planting locations, etc. will be determined in the field.

3. What is the footprint of the bench and call box pads, and do they require extensive concrete and reinforcement?

- 2 -

Response: No, it is expected that the pads will be placed just around the benches and call boxes and will be a typical light duty load pad consisting of about 4 to 6 inches of concrete and possibly a few inches of GAB or #57 stone base.

4. What are the approximate dimensions of the retaining wall that needs to be replaced?

Response: The wall is approximately 6 feet tall at the highest point and tapers down on both sides. The total length is roughly 200 to 250 feet. It may be that this wall can be shortened, and tie-in slopes provided at both ends. However, this will be determined at a later date.

5. How much fencing is expected, and can this be handled by a subcontractor?

Response: The fence runs the entire length of the trail along the back of the property line. Refer to the plans for further details. Yes, this portion of the work may be subcontracted out.

6. My company has experience with most of the type of work related to this project, but we have never been involved in a CMAR project. Can we still pursue this project?

Response: Everyone with relevant experience is encouraged to submit proposals.

7. Do we need to provide costs in a bid schedule at this time?

Response: This is a request for qualifications only. Cost discussions will be handled at a later date.

END OF ADDENDUM NO.1

Receipt of Addendum 1 is hereby acknowledged by: ______________________________

Company Name: _______________________________

\\emiserver\ema\PROJECTS\19\19007-Braselton-Mulberry River Walk Phase III\Bid Phase\BP7-Released for Bids\CMAR Contract Documents and Specifications\Addendum 1.docx

File details come from the government source that posted it. Updated .