Wilson County, Tennessee is requesting bids on a roof replacement and system upgrade at the Mt. Juliet Community Center, with bids due September 23, 2026.

The scope includes removal of the existing roof ridge vent along the front gable section; installation of EPS flute fill insulation boards across all roof sections; mechanical fastening of High Density EPS cover board over the insulation; installation of a 50 mil PVC RED membrane system; termination of the membrane along gutter edges with vinyl-coated drip edge featuring a skirt; cutting and replacement of metal wall panels at lower roof section headwalls with new L-bracket metal components, with membrane running up the walls and terminating with termination bars; modification of metal at gutter ends to prevent water overflow; and flashing of all pipe penetrations with custom-sized stack flashings. All work must comply with manufacturer specifications.

The RFB attachment (P-486 RFB MJCC ROOF.pdf) provides the detailed scope, though the publicly posted excerpt does not contain contract value, term, evaluation criteria, pre-bid meeting date, site-visit information, incumbent contractor details, set-asides or preferences, bonding requirements, or insurance specifications. Prospective bidders should obtain the complete RFB package for full procurement terms and conditions.

Opportunity text

Load roof and install safely. Remove existing roof ridge vent along front section of roof gable in preparation for new flute fill roof system. Loose lay EPS flute fill insulation boards in between existing metal roof panel across all sections. Mechanically fasten High Density EPS cover board over flute fill insulation using appropriately sized fasteners per manufacturer specs. Fasten 50 mil PVC RED membrane over newly installed HD EPS cover board using manufacturer specs. Terminate membrane along the gutter edges with vinyl coated drip edge (with a skirt) per manufacturer specs. Cut back metal wall panels along the headwalls of the lower roof sections and install a new (L-Bracket) metal while running membrane up the walls and terminating with termination bar per manufacturer specs. Cut metal back at the gutter ends of the panels to prevent from allowing water to jump the gutter with new higher system. Flash in all pipe penetrations with custom sized stack flashings per manufacturer specs.