Moses Lake Tide Gate Repairs
Open State & local contract opportunity Posted
- Solicitation number
- 26-129
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Tammy Dickey tammy.dickey@co.galveston.tx.us (409) 770-5372
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Galveston County is soliciting qualifications from licensed professional engineering firms for construction-phase engineering services on the Moses Lake Tide Gate Repairs in Texas, with qualifications due December 10, 2026. The solicitation names no set-aside, preference, or incumbent.
The attached 100% construction specifications, prepared by Wiss, Janney, Elstner Associates, Inc. for Galveston County Engineering and Right of Way in Texas City, define the project. The work covers removal and in-kind replacement of the lower lift gate; rehabilitation of the upper half, including replacing double angle members with hollow structural sections; replacement of bridge bearing and sole plate bolts; new coating systems on towers and bridge; rehabilitation of emergency brake and hoist bearings; removal of the hydraulic lowering system in favor of a standby generator; and replacement of gate controls with a PLC system and new electrical distribution service. The specifications require gate operability during hurricane season (June 1 through November 30) with no exceptions.
The project is divided into Structural, Coating, Mechanical, and Electrical base bid packages, each priced as a lump sum with its own construction period. Fabricators must hold AISC certification in one of four categories: CBR (Major Bridge Fabrication), IBR (Intermediate Certified Bridge Fabricator), ABR (Advanced Certified Bridge Fabricator), or HYD (Certified Metal Hydraulic Fabricator). Contractors and fabricators must show at least five years of continuous experience in similar work with detailed project references. Welding must follow AWS D1.5, and fasteners must be domestic U.S. manufacture with galvanized finishes. Site work is limited to 8 a.m. to 5 p.m., Monday through Friday, unless the Owner approves otherwise. Bids cannot be withdrawn within 60 calendar days after the bid due date.
Opportunity text
Galveston County is soliciting qualifications from licensed professional engineering firms to provide construction phase engineering services for the Moses Lake Tide Gate Repairs.
Files
| File | Type | Posted |
|---|---|---|
| 2025-10-20 WJE - Moses Lake Tide Gate Rehabilitation - 100 Specs.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity