Summary of Moses Lake Tide Gate Repairs - 100% Construction Documents
This document comprises the 100% construction specifications for the Moses Lake Tide Gate Repairs project prepared by Wiss, Janney, Elstner Associates, Inc. (WJE) for Galveston County Engineering and Right of Way in Texas City, Texas. The project scope includes removal and in-kind replacement of the lower portion of the lift gate; rehabilitation of the upper half including replacement of double angle members with hollow structural sections (HSS); replacement of bolts at bridge bearing connections; repairs at guardrail locations; removal and installation of new coating systems on towers and bridge; replacement of bridge sole plate bolt assemblies; rehabilitation of emergency brake and hoist bearing systems; removal of the hydraulic gate lowering system and installation of a new standby generator; and electrical scope including replacement of gate control systems with a PLC system and new electrical distribution service. The work encompasses structural steel fabrication, selective demolition, field coating work, mechanical work, and electrical and control system installation. The construction documents specify that work must maintain gate operability during hurricane season (June 1 through November 30) with no exceptions permitted. The project is broken into multiple bid packages: Structural Base Bid, Coating Base Bid, Mechanical Base Bid, and Electrical Base Bid, each with separate lump sum pricing and construction period requirements. Site work is restricted to 8 a.m. to 5 p.m., Monday through Friday, unless otherwise approved by the Owner. The bidder must provide 24-hour emergency contact information and cannot withdraw the bid within 60 calendar days after the bid due date.
The specifications require extensive documentation and qualifications from contractors and fabricators, including evidence of minimum five years of continuous experience in similar work with detailed project references. Fabricators must be AISC certified as either Category CBR (Major Bridge Fabrication), IBR (Certified Bridge Fabricator - Intermediate), ABR (Certified Bridge Fabricator - Advanced), or HYD (Certified Metal Hydraulic Fabricator). All structural steel materials must comply with ASTM standards including A36, A500, A572, and A992 specifications. Welding must comply with AWS D1.5 Bridge Welding Code with comprehensive welding procedure specifications (WPS), procedure qualification records (PQR), and welder certifications required before fabrication commences. The fabricator must maintain detailed weld tracking logs, conduct witness point inspections, and perform extensive nondestructive testing including ultrasonic, radiographic, magnetic particle, and dye penetrant inspection. All fasteners must be domestic U.S. manufacture with galvanized finishes meeting ASTM specifications. The fabricator is responsible for delivery of all structures to the project site at their expense, with notification to the Owner 28 days in advance of delivery. High-strength bolts, nuts, and washers require rotational-capacity testing certification prior to shipping. Pricing terms, payment schedules, and contract award information are not specified in these construction documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOSES LAKE TIDE GATE REPAIRS
4434 Beach Drive
Texas City, Texas
PROJECT TECHNICAL SPECIFICATIONS
100% Construction Documents
, 2025
WISS, JANNEY, ELSTNER ASSOCIATES, INC.
10777 Clay Road, Ste 150
Houston, Texas 77041
Texas Registered Engineering Firm F-93
WJE No. 2024.0927
ELECTRICAL -
, 2025
STRUCTURAL -
, 2025OCTOBER 20
OCTOBER 20
OCTOBER 20
October 20
Table of Contents
00 01 10 - 1
Moses Lake 00 01 10 - 1 Table of Contents
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927 100% Construction Documents
SECTION 00 01 10
TABLE OF CONTENTS
Section Number
Section Title
Pages
Division 00 – Procurement and Contracting Requirements
00 41 44 Bid Form 3
Division 01 - General Requirements
01 11 00 Summary of Work 5
Division 02 - Existing Conditions
02 41 19 Selective Demolition 5
Division 05 - Steel
05 12 00 Structural Steel 8
05 59 00 Fabrication of Hydraulic Steel Structures 14
Division 09 – Finishes
09 97 13 High Performance Coating for Steel Structures 14
Division 35 – Waterway and Marine Construction
35 20 16 Mechanical Work 16
35 20 20 Electrical & Control System Work 57
END OF SECTION
Wiss, Janney, Elstner Associates, Inc.
Moses Lake 00 41 44 - 1 Bid Form
BID FORM
PROJECT: Moses Lake Tide Gate Repairs
BID DUE DATE TO BE PROVIDED BY OWNER.
SUBMITTED TO: _________________
COPY TO: _________________
SUBMITTED BY:
Bidder name
Bidder address
Bidder certifies that
A. Bidder has carefully read and understands Bidding Documents;
B. Bidder has visited site and become familiar with local conditions under which Work is to be performed, including verifying visible conditions, such as dimensions, materials, and equipment to remain, on existing facility; and
C. Bidder has correlated Bidder’s personal observations with requirements of Bidding
Documents. Bidding Documents include Project Manual and Drawings prepared by WJE and dated _____________, 2025.
D. Copy of original design drawings is available upon request to Michael Shannon, PE.
Bidder shall notify Engineer and Owner of discrepancies, omissions, conflicts, or unclear meaning within
Contract Documents; Engineer will interpret Contract Documents and, if necessary, issue written addendum. Contracted Work will be based on Engineer’s interpretation of Contract Documents.
Bidder acknowledges receipt of following addenda.
No. Dated
No. Dated
LOWER GATE REMOVAL & REPLACEMENT AND STRUCTURAL REPAIRS (REF.
S1.01 – S3.27)
Moses Lake 00 41 44 - 2 Bid Form
STRUCTURAL BASE BID: Furnish labor, materials, services, and equipment necessary for completion of Work, including modifications to the guide structure if required for access, and coating for the shop fabricated structure, for lump sum of $ .
In words: DOLLARS.
CONSTRUCTION PERIOD: Start work within calendar days after notice of Contract award and complete Base Bid Work within calendar days after start date. This Base Bid completion period is based upon the following assumptions of (fill-in as needed):
• Owner coordination period of _________________ calendar days prior to start of construction
• Working Hour Assumptions: ____________________________
• Bidder acknowledges and agrees that the gate must remain operational/be returned to operational condition during the hurricane season (June 1 through November 30): _____.
FIELD COATING WORK (EXCLUDING NEW GATE SECTION TO BE SHOP COATED):
COATING BASE BID: Furnish labor, materials, services, and equipment necessary for completion of Work as detailed in Specification Section 09 97 13 Section 1.1.B, for lump sum of $ .
date. This completion period is based upon the following assumptions of (fill-in as needed):
• Owner coordination period of _________________ calendar days prior to start of construction
• Working Hour Assumptions: ____________________________
MECHANICAL WORK (REF. M1.01 – M5.01):
MECHANICAL BASE BID: Furnish labor, materials, services, and equipment necessary for completion of Work as detailed in mechanical drawings and specifications, for lump sum of $ date. This completion period is based upon the following assumptions of (fill-in as needed):
• Owner coordination period of _________________ calendar days prior to start of construction
• Working Hour Assumptions: ____________________________ Bidder acknowledges and agrees that the gate must remain operational/be returned to operational condition during the hurricane season (June 1 through November 30): _____.
Moses Lake 00 41 44 - 3 Bid Form
ELECTRICAL & CONTROL SYSTEM WORK (REF. E1.01 – E4.12):
ELECTRICAL BASE BID: Furnish labor, materials, services, and equipment necessary for completion of Work as detailed in electrical drawings and specifications, for lump sum of $ date. This completion period is based upon the following assumptions of (fill-in as needed):
• Owner coordination period of _________________ calendar days prior to start of construction
• Working Hour Assumptions: ____________________________
Bid is predicated on acceptance by Owner and Engineer of following principal subcontractors.
Subcontractor name and address
Bidder may not withdraw Bid within 60 calendar days after Bid Due date.
Bidder agrees that Owner has right to waive informalities and irregularities in Bid received and to accept
Bid which, in Owner’s judgment, is in Owner’s own best interests.
Submitted By:
Signature
Title
Company Seal (if Bidder is a corporation)
Moses Lake 01 11 00 - 1 Summary of Work
WJE No. 2024.0927.0 100% Construction Documents
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes: Description of existing conditions and Work scope, and Contractor duties and use of premises.
1.2 OWNER/CONTRACTOR AGREEMENT
A. Perform Work under terms of Agreement Between Owner and Contractor stipulated sum.
B. Owner: Galveston County Engineering and Right of Way.
C. Engineer: Wiss, Janney, Elstner Associates, Inc. (WJE)
1.3 CONTRACTOR DUTIES
A. Except as specifically noted, provide and pay for:
1. Labor, materials, and equipment.
2. Tools, construction equipment, and machinery.
3. Water, heat, power, and lights required for construction.
4. Other facilities and services necessary for proper execution and completion of Work.
5. Legally required sales, consumer, and use taxes except as exempt. The Owner shall provide a tax-exempt certificate upon request.
6. Permits, government fees, and licenses as necessary for proper execution and completion of Work and as applicable at time of receipt of bids.
B. Comply with codes, ordinances, rules, regulations, orders, and other legal requirements of public authorities having jurisdiction, which bear on performance of Work.
1. Take necessary safety precautions to prevent injury to construction personnel, non-construction personnel, Owner’s property, and adjacent facilities.
2. Give required notices.
3. Products shall comply with local regulations, including environmental restrictions.
4. Promptly submit written notice to Architect/Engineer of observed variance of Contract
Documents from legal requirements. It is not the Contractor's responsibility to make certain that Drawings and Specifications comply with codes and regulations.
a. Propose appropriate modifications to Contract Documents for necessary changes.
b. Assume responsibility for Work known to be contrary to such requirements, which is performed without notice.
C. Enforce strict discipline and good order among employees. Do not employ unfit persons or persons not skilled in their assigned tasks.
D. Provide 24-hour emergency contact information for Contractor and major subcontractors, including names and telephone numbers.
Moses Lake 01 11 00 - 2 Summary of Work
1.4 PROJECT CONDITIONS
A. Description of Existing Structure:
1. The Moses Lake Tide Gate is a tidal control gate constructed in 1966. The tide gate is positioned over a 56-foot wide channel opening, and is composed of three main components: east and west towers, bridge, and lift gate. Each component is structural steel-framed and is covered with a three-coat protective coating system.
a. Construction: Based on the original structural drawings by USACE, dated December
1964, all tower and bridge framing members are A36 structural steel while the lift gate framing is A441 steel.
b. Towers: The structural framing of each tower primarily consists of wide flanged members with steel angle bracing. The base of each tower is connected to concrete pedestals with bolted base plate connections embedded in the concrete pedestals.
Members are generally connected via welded and/or bolted connections.
c. Bridge: The tower bridge primarily consists of two simply supported, 75.5-foot-long built-up plate girders spanning between each tower that support the lift gate and an open-grating work platform above the bridge. The girders are 48 inches deep, spaced
10 feet apart, and are composed of 3/8-inch-thick web plates and 1-inch-thick by 12-inch-wide top and bottom flange plates. The girders are laterally braced with intermediate diaphragms consisting of wide flange, angle, and tee sections. The bridge rests on pinned bearings atop sole plates bolted to the tops of each tower.
d. Lift Gate: The lift gate is approximately 56 feet long by 35 feet tall, is suspended beneath the bridge, and is approximately centered between the towers. The lift gate is raised or lowered via a system of cables and sheaves and is submerged approximately
15 feet when the gate is closed. The gate maintains alignment through reaction wheels supported by built-up sections (end plates) comprised of C-sections welded to 1/2-inch-thick steel plates at both sides of the lift gate. The lift gate consists of two parallel steel frames. The north and south frames are connected by horizontal, vertical, and diagonal framing that form a space frame. Some elements of the lift gate are fastened with structural bolts, but most of the joints on the lift gate are welded connections.
e. Mechanical Systems: The mechanical system is comprised of a dual-drum cable hoist driven by a pinion gear mounted between the two drums powered by an electric motor.
There are two drum brakes, one before the motor and one before the reducer. An additional emergency disc braking system was mounted on the wire rope drums, which was installed circa 1981. The reducer has a single input shaft and single output shaft. The output shaft turns a pinion gear, which turns the two drum gears located on either side of it. Both drums have two ropes that either wind or unwind to raise or lower the gate. In the event of a power outage, backup power generation is provided by diesel stand-by generators. There is a hydraulic system that can be used to lower the gate; however, the elimination of this system is part of this project scope. Electric power is required to release the emergency brakes to facilitate lowering.
f. Electrical Systems: The gate is operated from the control console located in the control house at the southeast corner of the gate. Local control for the gate dogs is also provided at the top of the gate structure. The gate control system is implemented using relay type logic. Various field feedback devices, which provide inputs to the gate control system, are located throughout the gate complex. The gate is operated using a two-speed induction motor. The gate machinery is provided with thruster type machinery and motor brakes.
B. Description of Deterioration:
Moses Lake 01 11 00 - 3 Summary of Work
1. WJE performed a limited condition assessment of the Moses Lake Tide Gate February 14 through 17, 2023, Findings were presented in a report dated May 31, 2023, and are summarized below.
a. Towers and Bridge Structure:
1) Finish coat and primer coats is delaminated at spot locations at the towers, typically at the lower ladders and bridge guardrails.
2) Pack rust was observed at each guide beam plate at the tower to bridge connection.
3) Bolts connecting the sole plate to the towers had visible section loss.
4) Topcoat delamination and/or peeling was observed at isolated areas at various steel members and plates.
5) Various areas with light to medium pitting or freckled rust with no visible section loss were identified. Light to medium pack rust was observed at edge of beam flanges and connections between members.
6) Pack rust and minor section loss was observed at welded and bolted connections.
b. Lift Gate:
1) Multiple forms of distress including:
a) Full section loss and severe corrosion/connection distress near connections of the space frame.
b) Section loss in elements throughout the lift gate.
c) Cracked weldments at multiple locations.
d) Corroded bolts between bumpers and end plates.
e) Pack rust between plies of horizontally oriented double-angle section connecting the north and south space frames.
f) Coating related distress, including cracking and blistering throughout the tide gate. Most severe distress was observed along the lower 20 feet of the tide gate framing, south side of the skin plate, end plates, and reaction wheels.
c. Mechanical:
1) The hydraulic system for the emergency break needs to be repaired to hold proper torque.
2) Multiple side rollers are seized.
3) Existing drum brakes are obsolete.
d. Electrical:
Multiple components are beyond expected service lives, making failures more common and spare parts more difficult to maintain.
1.5 WORK SCOPE
A. Work includes the following activities:
1. Removal and in-kind replacement of the lower portion of the lift gate including:
a. Temporary removal of structural assembly including reaction wheels and their bearings.
b. Replacement of structural members and skin plating. Double angle members to be replaced with HSS.
c. Removal of existing coating system and installation of new coating system.
d. Replacement of structural assembly, including reaction wheels and their bearings.
2. Rehabilitation of the upper half of the lift gate including:
a. In-place repairs of structural framing.
b. Replacement of double angle members with HSS.
Moses Lake 01 11 00 - 4 Summary of Work
c. Removal of existing and installation of new coating system.
3. Replacement of bolts at bridge bearing bolted connections at top of tower identified as poor or severe condition.
4. Repairs at guardrail locations with full section loss.
5. Removal of existing coating systems and installation of new coating systems on towers and bridge.
6. Replacement of bridge sole plate bolt assembly.
7. Rehabilitation of emergency brake system for the hoist and the hoist system bearings
8. Removal and disposal of the hydraulic gate lowering system and installation of new standby generator.
9. Electrical scope associated with the mechanical scope outlined in Items 5 and 6, including replacement of the gate control systems with a PLC system, and new electrical distribution service.
10. General facility-related electrical improvements.
1.6 CONSTRUCTION SCHEDULE
A. The Work shall be conducted so as to guarantee gate operation during the NOAA Hurricane
Season, June 1 through November 30. No exceptions will be allowed.
B. Before commencing Work of each phase, submit an updated copy of Contractor's construction schedule showing the sequence, commencement and completion dates for all phases of the
Work.
1.7 CONTRACTOR USE OF PREMISES
A. Confine operations at Site to areas permitted by law, ordinance, permits, and Contract
Documents.
B. Owner will occupy premises outside of Work area during construction period.
1. Cooperate with Owner to minimize conflicts and facilitate Owner usage.
2. Perform Work to avoid interference with Owner’s day-to-day operations. Notify Owner at least 72 hours in advance of activities that will affect Owner’s operations.
a. Maintain utilities serving areas occupied by Owner or others. Do not interrupt utilities unless approved in writing in advance by Owner and only as necessary to perform the
Work. Notify Owner at least 72 hours in advance of interruption. Provide temporary utility services if required.
3. Maintain vehicular, pedestrian, and emergency access to portions of facility that are in use.
Keep entrances and exits clear of stored materials and construction equipment.
a. Short interruptions in access may be permitted if approved in advance in writing by the Owner.
b. Schedule deliveries to minimize interruptions.
4. Do not disturb Site outside of Work area.
5. Notify the Owner at least one week in advance of when portions of Work area will be removed from use or returned to use.
C. Minimize interference with adjacent waterways, streets, and walkways and adjacent facilities.
D. Contractor shall have no additional storage or operational area outside of Work area, except as approved in advance by Owner.
1. Construction equipment, tools, etc., shall not be stored in areas of Owner's continued use.
Moses Lake 01 11 00 - 5 Summary of Work
2. Do not unreasonably encumber Site with materials or equipment.
3. Do not load the structure with weight that will endanger the structure.
4. Assume full responsibility for Site security and protection and safekeeping of products stored at Site.
5. Obtain and pay for additional storage areas needed for operations.
E. Perform Site Work between 8 a.m. and 5 p.m. on Monday through Friday, except as approved in advance by the Owner.
PART 2 PRODUCTS [Not Used]
PART 3 EXECUTION [Not Used]
Moses Lake 02 41 19- 1 Selective Demolition
SECTION 02 41 19
SELECTIVE DEMOLITION
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes: Demolition and removal of existing construction, including salvage and reuse of materials.
1.2 REFERENCES
A. Definitions:
1. Existing to remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
2. Remove: Detach items from existing construction and legally dispose of off-site, unless indicated to be removed and salvaged or removed and reinstalled.
3. Remove and reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.
4. Remove and salvage: Detach items from existing construction and deliver to Owner ready for reuse.
5. Repair in-place: Existing items of construction that are to remain in place but shall be modified as indicated by Engineer to implement repairs. Modifications may include partial removal of items.
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordinate with Owner’s Representative and with other trades to ensure that adjacent areas are not adversely affected.
B. Pre-Construction Meeting:
1. Conduct meeting prior to start of Work
2. Representatives of each entity directly concerned with selective demolition to attend.
3. Review requirements for steel work, including
a. Construction schedule
b. Availability of materials, personnel, equipment, and facilities needed to make progress and avoid delays.
c. Site limitations regarding equipment utilization and work schedule.
d. Site use, access, staging, and set-up location limitations.
e. Required submittals
1.4 SUBMITTALS
A. Documentation of existing conditions which might be misconstrued as damage caused by demolition activities.
B. Documentation of existing conditions or assemblies to be removed and reinstalled as necessary for reinstallation of assembly.
Moses Lake 02 41 19- 2 Selective Demolition
C. Submittals detailing proposed removal methodology, schedule, shoring/bracing plan, and demolition equipment shall be provided to Engineer at least 30 days prior to start of demolition.
D. Narrative of sequence for selective demolition for the gate structure, including the guide rails, if needed for access.
E. Inventory of materials to be removed and salvaged or reinstalled.
F. Contractor Qualifications: Evidence that Contractor’s existing company has minimum five years of continuous experience in similar selective demolition work and similar; list of at least five representative, successfully-completed projects of similar scope and size, including:
1. Project name.
2. Owner's name.
3. Owner's Representative name, address, and telephone number.
4. Description of work.
5. Types of miscellaneous steel installation work.
6. Project supervisor.
7. Total cost of miscellaneous steel installation work and total cost of project
1.5 CHANGES IN WORK
A. During rehabilitation work, existing conditions may be encountered which are not known or are at variance with Contract Documents. Such conditions may interfere with Work and may consist of damage or deterioration of substrate or surrounding materials.
1. Notify Engineer of conditions that may interfere with proper execution of Work prior to proceeding with Work.
1.6 EXISTING WARRANTIES
A. Remove, replace, patch, and repair surfaces cut or damaged during operations, by methods and with materials so as not to void existing warranties.
PART 2 PRODUCTS - Not Used
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions with Installer(s) or Applicator(s), where applicable, for compliance with requirements, installation tolerances, and other conditions affecting selective demolition Work.
1. Ensure that work done by other trades is complete and ready for selective demolition Work.
2. Verify that areas and conditions under which selective demolition Work is to be performed permit proper and timely completion of Work.
3. Notify Engineer in writing of conditions which may adversely affect selective demolition
Work and recommend corrections.
4. Do not proceed with selective demolition Work until adverse conditions have been corrected and reviewed by Engineer.
Moses Lake 02 41 19- 3 Selective Demolition
5. Commencing selective demolition Work constitutes acceptance of Work surfaces and conditions.
B. Survey existing conditions and correlate with requirements to determine extent of selective demolition Work required.
1. Record observations.
2. Document with photographs and/or video, existing conditions of adjoining construction, including finish surfaces, which might be misconstrued as damage caused by demolition activities.
3. Inventory and record condition of items to be removed and salvaged or reinstalled.
3.2 PROTECTION
A. Take precautions to protect persons (including facility users, passers-by, and workers) and adjacent property (including adjacent building elements, waterways, landscaping, and motor vehicles) from Work.
B. Prevent construction debris and other materials from coming into contact with pedestrians, motor vehicles, landscaping, buildings, waterways, and other surfaces that could be harmed by such contact.
C. Limit access to Work areas.
D. Erect temporary protective canopies, as necessary, over areas of pedestrian and vehicular access that must remain in service during Work.
E. Assume responsibility for injury to persons or damage to property resulting from Work, and remedy at no cost to Owner.
F. Do not store demolition materials or equipment on the structure in a manner that might cause deterioration or damage to the members of the supporting structures.
G. Provide and maintain shoring, bracing, and structural supports, as required to preserve stability and prevent movement, settlement, or collapse of construction or finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
3.3 SELECTIVE DEMOLITION
A. Utility Services, Mechanical and Electrical Systems:
1. Disconnect and seal or cap off indicated utility services and mechanical and electrical systems in Work areas.
2. Where existing utility services or mechanical or electrical systems are required to be removed, relocated, or abandoned, bypass such services/systems before beginning Work to prevent interruption to occupied areas.
B. Demolish and remove existing construction and installations only as necessary and required for proper installation of work indicated in Drawings.
1. Conduct removals carefully to avoid damaging existing construction and installations that will remain.
a. Neatly cut openings and holes plumb, square, and true to dimensions required.
Moses Lake 02 41 19- 4 Selective Demolition
b. Cut or drill from exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
c. Use cutting methods least likely to damage construction to remain.
d. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces.
e. Temporarily cover openings to remain.
2. Protect construction that will remain against damage and soiling.
3. Provide and maintain shoring, bracing, and structural supports, as required to preserve stability and prevent movement, settlement, or collapse of construction to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
4. Document and remedy damage to existing construction and installations caused by operations.
C. Survey existing conditions as Work progresses to identify hazards resulting from construction.
D. When unanticipated structural, electrical, or mechanical elements that conflict with intended function or design are encountered, investigate and measure nature and extent of conflict.
Promptly submit written report to Engineer.
E. Provide access to Work areas and perform localized demolition as necessary for inspection of concealed underlying conditions by Engineer and Owner’s Representative.
F. Items to be Salvaged or Reinstalled:
1. Carefully remove, clean, and mark with identifying code.
2. Store in secure area and protect from damage.
3. Replace items that are damaged by the Work with new items to match undamaged originals.
4. Reinstall in original locations after selective demolition operations and underlying Work are complete.
5. Items to be Salvaged:
a. Pack or crate, and label contents of containers.
b. Store in secure area until delivery to Owner.
c. Transport to Owner’s on-site storage area.
d. Protect from damage during transport and storage.
3.4 DISPOSAL OF DEMOLITION MATERIALS
A. Unless noted otherwise, promptly remove demolition debris from Site and dispose of legally.
Do not burn.
3.5 CLEANING
A. At the end of each workday, clean the Site and Work areas and place rubbish, empty cans, rags, and other discarded materials in appropriate containers.
B. After completing the selective demolition work:
1. Clean adjacent surfaces and structures of all materials resulting from Work that are not intended to be part of the finished Work using appropriate cleaning agents and procedures.
Exercise care to avoid damaging surfaces.
2. Repair at no cost to Owner all items damaged during the Work.
Moses Lake 02 41 19- 5 Selective Demolition
3. Remove and legally dispose of debris and surplus materials from Site
Moses Lake 05 12 00 - 1 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
SECTION 05 12 00
STRUCTURAL STEEL
PART 1 - GENERAL
1.1 SUMMARY
A. This Work shall consist of providing the necessary labor, materials, equipment and supervision to repair existing steel framing that is not part of the main gate, and remove and reinstall associated secondary and tertiary framing as required for work.
1.2 REFERENCE STANDARDS
A. American Society for Testing and Materials (ASTM), latest edition
1. A36/A36M: Standard Specification for Carbon Structural Steel
2. A123: Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel
Products.
3. A307: Standard Specification for Carbon Steel Bolts, Studs and Threaded Rod 60,000 PSI
Tensile Strength.
4. A563: Standard Specification for Carbon and Alloy Steel Nuts.
5. A572/A572M: Standard Specification for High-Strength Low-Alloy Columbium-
Vanadium Structural Steel
6. A992/A992M: Standard Specification for Carbon Structural Steel
7. F3125: Standard Specification for High Strength Structural Bolts and Assemblies, Steel and Alloy Steel, Heat Treated, 120 ksi and 150 ksi Minimum Tensile Strength
B. American Institute of Steel Construction (AISC), latest edition
1. 303: Code of Standard Practice for Steel Buildings and Bridges
2. 360: Specification for the Design, Fabrication, and Erection of Structural Steel for
Buildings, including the Commentary and Supplements
3. RCSC “Specification for Structural Joints Using High-Strength Bolts”
C. American Welding Society (AWS), latest edition
1. A2.4: Standard Symbols for Welding, Brazing, and Nondestructive Examination
2. D1.1: Structural Welding Code – Steel
3. AWS A5.1, Specification for Carbon Steel Electrodes
D. The Society for Protective Coatings (SSPC), Surface Preparation Standards
1. SSPC-SP 3, Power Tool Cleaning
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordinate work to ensure that adjacent areas are not adversely affected. Coordinate:
1. With Owner’s Representative:
2. With other trades
a. Furnish anchorage items to be attached to other construction without delaying Work.
Provide, as needed, setting diagrams, sheet metal templates, instructions, and directions for installation.
Moses Lake 05 12 00 - 2 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
b. To ensure that work done by other trades is complete and substrate is ready for steel installation.
c. To ensure that subsequent work will not adversely affect installed steel elements.
B. Pre-Construction Meeting:
1. Conduct meeting prior to start of Work
2. Representatives of each entity directly concerned with structural steel to attend, including the following:
a. Fabricator
b. Installer
1) Installer’s Superintendent
3. Review requirements for steel work, including
a. Construction schedule
b. Availability of materials, personnel, equipment, and facilities needed to make progress and avoid delays.
c. Site use, access, staging, and set-up location limitations
d. Required submittals
1.4 SUBMITTALS
A. Submittals of proposed materials and removal methods for deteriorated portions of members shall be provided to Engineer prior to 30 days before mobilization to site.
B. Product data: for each type of product indicated.
C. Shop Drawings: For shop fabricated elements
1. Clearly indicate profiles, sizes, spacing and locations of structural members, connections, attachments, anchorages, framed openings, size and type of fasteners, cambers, and clearances.
2. Indicate welded connections using standard AWS welding symbols. Clearly indicate net weld lengths, sizes and welding sequences.
3. No individual piece drawing will be accepted without simultaneous submission of its location on an erection plan.
4. Engineer’s review of Shop Drawings will be for general considerations only. Compliance with requirements for materials fabrication and erection of metal fabrications is
Contractor’s responsibility.
D. Mill Test Reports: Furnish Mill test reports for all fabricated elements certifying compliance with the applicable standards.
E. Certifications: For all high-strength bolts, nuts and hardened washers, submit certification of domestic (U.S.) manufacture and compliance with all provisions of these specifications. No foreign manufactured material shall be considered for use.
F. Welding Qualification Data:
1. Welding Procedure Specification (WPS) for each weld type, process, parameters (i.e., wire speed, voltage, amperage, etc.), and position, whether prequalified or qualified by testing by AWS D1.1, including the following:
a. Certificate of conformance and product information sheet for consumables listed in the WPS.
b. Supplemental welding procedures.
Moses Lake 05 12 00 - 3 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
G. Procedure Qualification Record (PQR) of satisfactory certification testing for each non-prequalified welding procedure.
H. Steel Detailer Qualifications: Submit steel detailer qualifications.
I. Welder Certifications: Submit welder certificates indicating the welder has passed AWS qualification tests per AWS D1.1 and is currently certified to perform welding processes as indicated on Drawings.
J. Welding Inspector Certifications: Submit welding inspector certificates indicating AWS certification in accordance with provisions of AWS QCI, Standard for Qualification and
Certification of Welding Inspectors.
K. Welding Procedure Specifications (WPS): Submit WPS Consistent with AWS D1.1 for all full and partial-penetration welds.
L. Fabricator Qualifications: Evidence that fabricator's existing company has minimum five years of continuous experience in similar steel fabrication work; list of at least five representative, successfully-completed projects of similar scope and size, including:
1. Project name.
2. Owner's name.
3. Owner's Representative name, address, and telephone number.
4. Description of work.
5. Types of steel fabrication work.
6. Project supervisor.
7. Total cost of steel fabrication work and total cost of project.
8. Completion date
M. Fabricator’s or erector’s, as applicable, written quality control manual that shall include, as a minimum:
1. Material control procedures
2. Inspection procedures
3. Nonconformance procedures
N. Fabricator’s or erector’s, as applicable, QC inspector qualifications
O. Installer Qualifications: Evidence that installer's existing company has minimum five years of continuous experience in similar steel installation work; list of at least five representative, successfully-completed projects of similar scope and size, including:
1. Project name.
2. Owner's name.
3. Owner's Representative name, address, and telephone number.
4. Description of work.
5. Types of miscellaneous steel installation work.
6. Project supervisor.
7. Total cost of miscellaneous steel installation work and total cost of project
1.5 QUALITY ASSURANCE
A. Fabricator Qualifications: Shall be experienced in fabrication of structural steel for projects of similar size and difficulty. Subject to approval of Engineer and Owner.
Moses Lake 05 12 00 - 4 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
B. Installer Qualifications: Experienced firm that has successfully completed miscellaneous steel installation work similar in material, design, and extent to that indicated for Project. Must have successful construction with specified materials in local area in use for minimum of five years.
1. Employ foreperson with minimum five years of experience as foreperson on similar projects, who is fluent in English, to be on Site at all times during the Work. Do not change foremen during the course of the Project except for reasons beyond control of Contractor;
inform Engineer in advance of any changes.
C. Steel Detailer Qualifications: Steel detailers must be experienced in detailing structural steel for projects of similar size and complexity. Steel detailer must be experienced in detailing structural steel in accordance with AISC seismic provisions.
D. Welder Qualifications: Welding shall be done only by welding operators currently qualified according to AWS D1.1 as applicable.
E. Design of Members and Connections
1. All details and dimensions shown on Drawings are typical. Similar details shall apply to similar conditions, unless otherwise indicated. Verify dimensions at the Site where indicated on Drawings and at other locations, whenever possible, without causing delay in the Work.
2. Promptly notify Engineer whenever design of members and connections for any portion of the structure are not clearly indicated.
3. Design metal fabrications under direct supervision of a Professional Engineer experienced in design of this work and licensed in Texas.
F. Comply with the applicable provisions of the following Specifications or documents:
1. AISC Code of Standard Practice for Steel Buildings and Bridges.
2. AISC Specification for the Design, Fabrication, and Erection of Structural Steel for
Buildings, including the Commentary and Supplements thereto as issued.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to the Site at such intervals as to ensure uninterrupted progress of the Work and completion by project deadline
B. Store materials to permit easy access for inspection and identification. Keep steel members off the ground using pallets, platforms, or other means of support. Protect steel members and packaged materials from damage, deterioration, and rusting.
C. Store fasteners in protected place. Clean and re-lubricate bolts and nuts that become dry or rusty before use per manufacturer's written recommendations
D. Do not store materials on the structure in a manner that might cause deterioration or damage to the members of the supporting structures.
1.7 PROJECT CONDITIONS
A. Verify existing dimensions and details prior to installation of steel elements. Notify Engineer of conditions found to be different than those indicated in Contract Documents. Engineer will review situation and inform Contractor and Installer how to proceed.
Moses Lake 05 12 00 - 5 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
B. Handle and install materials in strict accordance with safety requirements required by local, state, and federal rules and regulations.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Structural Steel:
1. W-Shapes and Channels: ASTM A992/A 992M, Grade 50.
2. Plate: ASTM A572/A 572M, Grade 50.
3. Hollow Structural Sections (HSS): ASTM A500, Grade C.
4. Miscellaneous (M), and Angles: ASTM A572/A572M, Grade 50.
5. Pipe: ASTM A53, Grade B.
6. Welding Electrodes: E70XX, or as required by AWS specifications.
7. All structural steel shall be coated per Section 09 97 13, unless noted otherwise in
Drawings.
B. Fasteners:
1. High-Strength Bolts, Nuts, and Washers:
a. Heavy-hex steel structural bolts: ASTM F3125 Grade A325, Type 1.
b. Heavy-hex carbon-steel nuts: ASTM A653, Grade C.
c. Hardened carbon-steel washers: ASTM F436, Type 1.
d. Finish: Hot-dip zinc coating, ASTM A153/A153M, Class C.
2. Other Bolts, Nuts, and Washers
a. Bolts: ASTM A307 Grade A; galvanized finish, hex head.
b. Nuts: ASTM A563; Grade DH galvanized finish.
c. Washers: ASTM F436, Type 1, galvanized finish
PART 3 - EXECUTION
3.1 FABRICATION
A. Fabricate and assemble steel shapes and plates in the shop to the greatest extent possible.
Fabricate structural steel components in accordance with AISC’s “Code of Standard Practice for
Steel Buildings and Bridges” and AISC 360, and as indicated on the approved Shop Drawings.
B. Fabricate items with joints tightly fitted and aligned.
C. Bolt Holes: Cut, drill, or punch standard bolt holes perpendicular to metal surfaces.
D. Finished surfaces of members shall be free of markings, burrs, and other defects and protrusions.
Grind welded splices smooth on all surfaces. Corners and edges of plates scheduled to receive paint and coatings shall be ground to a 1/16-inch radius.
E. Cutting and Fitting: Perform all necessary cutting, fitting, and drilling for the accommodation of other trades, and do whatever is necessary to secure correct information for same before and after steel is delivered.
Moses Lake 05 12 00 - 6 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
F. Welding: Comply with AISC specifications and latest American Welding Society standards.
Welds not specified shall be 3/16-inch fillet continuous but not less than the AISC minimum based on the thickness of the parts joined.
G. Supply components required for anchorage of fabrications.
H. Fabricate anchors and related components of same material and finish as fabrication, except where specifically noted otherwise.
I. Splices: Splicing of members to obtain the required lengths will not be permitted without prior acceptance by the Engineer unless shown on Drawings.
3.2 EXISTING CONDITIONS
A. Examine areas and conditions under which steel items are to be installed and notify Engineer of conditions detrimental to the proper and timely completion of the Work. Do not proceed with the Work until unsatisfactory conditions have been corrected in an approved manner.
B. Field-verify actual dimensions and locations of anchorage to existing structure prior to fabrication. Notify Engineer of all locations at which dimensions deviate significantly from dimensions shown or implied on Drawings. Record ambient and surface steel temperatures at the time of dimensional measurements.
3.3 PREPARATION
A. Clean and strip coated steel items to bare metal where site welding is required. In locations of corrosion of the base metal, remove loose rust and clean to SSPC-SP 3 prior to installation of supplemental plates.
3.4 GENERAL ERECTION AND INSTALLATION
A. Comply with the AISC Specifications and Code of Standard Practice.
B. Verify that field conditions are acceptable and are ready to receive work.
C. Position steel elements accurately in location, alignment, and elevation indicated; with edges and surfaces level, plumb, true, and free of rack.
1. Maintain erection tolerances specified by AISC’s “Code of Standard Practice for Steel
Buildings and Bridges.”
2. Perform cutting, drilling, and fitting required to install steel elements.
D. Provide temporary shores, guys, braces, and other supports during erection to keep metal fabrications secure, plumb, and in alignment against temporary construction loads and wind loads at the time of erection. Remove temporary supports when permanent structural steel, connections, and bracing are installed.
E. Align and adjust various members forming part of the assembly before permanently fastening.
1. Before assembly, clean bearing surfaces and other surfaces that will be in permanent contact with adjacent elements.
2. Perform necessary adjustments to compensate for discrepancies in elevations and alignment.
Moses Lake 05 12 00 - 7 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
3. Make allowances for difference between temperature at time of installation and mean temperature when structure is completed and in service.
F. Install items plumb and level, accurately fitted, free from distortion or defects.
G. Splice members only where indicated on Drawings or shop drawings approved by Engineer.
H. Do not use thermal cutting during installation unless approved by Engineer.
I. Obtain approval from Engineer prior to making adjustments not scheduled or otherwise indicated by Drawings.
J. After erection, prime welds, abrasions, and surfaces not shop coated.
K. Welded Connections, Structural Steel: Comply with AWS D1.1 for preheating, required profiles, tolerances, weld appearance, weld quality, and for methods used in correcting welding work.
1. Field weld components indicated. Perform field welding in accordance with AWS D1.1.
2. Perform welding in accordance with approved WPSs by properly certified welders. Take precautions for fire hazards at adjacent construction.
3. Remove dirt, grease, oil, and foreign matter by power brushing, degreasing, machining, or grinding, prior to welding.
L. Bolted Connections: Install high-strength bolts according to the RCSC Specification for joint conditions indicated on Drawings. Use snug-tight requirements unless noted otherwise.
1. Snug-Tight Joints:
a. Faying surfaces and surfaces adjacent to bolt head and nut shall be free of dirt and other foreign material.
b. Install snug-tight joints such that connected plies are brought into firm contact by the bolts in the joint and bolts have been sufficiently tightened to prevent removal of nuts without the use of a wrench.
2. Do not reuse the following bolts or assemblies: galvanized ASTM F3125 Grade A325 bolts. Plain ASTM F3125 Grade A325 bolts may be reused only if approved by Engineer.
3.5 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified special inspector to verify and inspect aspects of the steel installation and to inspect welds. Welding inspection and welding inspector qualifications shall be in accordance with AWS D1.1/D1.1M.
1. Provide testing agency with access to places where Work is being installed to perform inspections.
2. Provide notice to testing agency of installation schedule.
B. Contractor Responsibilities:
1. Coordinate Work schedule to allow inspections and testing.
2. Provide access to Work for inspections and testing.
3. Provide lighting, power, safety equipment, and other equipment deemed necessary by inspectors and specialists to perform inspections.
4. Record lot numbers, expiration dates, and use dates of materials.
C. Items to be Inspected: Do not proceed with Work that may make inspections difficult or impossible to perform until inspection has been completed and deficiencies corrected, unless
Engineer waives specific inspection.
Moses Lake 05 12 00 - 8 Structural Steel
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
1. Field welds.
2. High-strength bolted connections.
D. Field-Welded Connections:
1. Field welds will be visually inspected according to AWS D1.1 and AISC 360 as applicable.
2. In addition to visual inspection, field welds may be tested and inspected according to
AWS D1.1/D1.1M and the following inspection procedures, at Owner’s option:
a. Liquid Penetrant Inspection: ASTM E 165.
b. Magnetic Particle Inspection: ASTM E 709; performed on root pass and on finished weld. Cracks or zones of incomplete fusion or penetration will not be accepted.
c. Ultrasonic Inspection: ASTM E 164.
d. Radiographic Inspection: ASTM E 94.
3. Welds found to be unacceptable shall be re-welded and re-inspected until required quality has been attained.
E. Bolted Connections: Bolted connections will be inspected according to RCSC’s “Specification for Structural Joints Using High-Strength Bolts” and AISC 360.
1. Prior to the start of Work, verify that fastener components meet the requirements of RCSC
Specification Section 2 and connected plies meet the requirements of RCSC Specification
Section 3.
2. Visually verify that connected plies are in firm contact and that washers are used as required in RCSC Specification Section 6.
3. For snug-tight connections verify that bolts have been tightened sufficiently to prevent turning of the nut without the use of a wrench, per RCSC Specification Section 9.1
F. Correct deficiencies in Work that test reports and inspections indicate do not comply with the
Contract Documents.
3.6 CLEANING
A. At the end of each workday, clean the Site and Work areas and place rubbish, empty cans, rags, and other discarded materials in appropriate containers.
B. After completing the miscellaneous steel Work:
1. Clean all materials resulting from Work that are not intended to be part of the finished
Work using appropriate cleaning agents and procedures. Exercise care to avoid damaging surfaces.
2. Repair at no cost to Owner all items damaged during the Work.
3. Remove and legally dispose of debris and surplus materials from Site.
Moses Lake 05 59 20 - 1 Fabrication of Hydraulic Steel Structures
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
SECTION 05 59 20
FABRICATION OF HYDRAULIC STEEL STRUCTURES
PART 1 - GENERAL
1.1 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
1. American Institute of Steel Construction (AISC)
a. AISC 325 (2017) Steel Construction Manual
b. AISC 326 (2009) Detailing for Steel Construction
c. AISC 360 (2022) Specification for Structural Steel Buildings
d. ANSI/AISC 303 (2022) Code of Standard Practice for Structural Steel Buildings and
Bridges
2. American Society for Nondestructive Testing (ASNT)
a. ANSI/ASNT CP-189 (2020) ASNT Standard for Qualification and Certification of
Nondestructive Personnel
3. American Welding Society (AWS)
a. AWS D1.5 (2020; Errata 1 2022) Bridge Welding Code
b. AWS QC1 (2016) Specification of AWS Certification of Welding Inspectors
4. ASTM International (ASTM)
a. ASTM A563 (2021; E 2022a) Standard Specification for Carbon and Alloy Steel Nuts
b. ASTM A709/A709M (2024) Standard Specification for Structural Steel for Bridges
c. ASTM D395 (2016; E 2017) Standard Test Methods for Rubber Property –
Compression Set
d. ASTM D412 (2016; R 2021) Standard Test Methods for Vulcanized Rubber and
Thermoplastic Elastomers – Tension
e. ASTM D471 (2016a) Standard Test Method for Rubber Property – Effect of Liquids
f. ASTM D573 (2004; R 2019) Standard Test Method for Rubber – Deterioration in an
Air Oven
g. ASTM D624 (2000; R 2020) Standard Test Method for Tear Strength of Conventional
Vulcanized Rubber and Thermoplastic Elastomers
h. ASTM D1149 (2018) Standard Test Method for Rubber Deterioration – Cracking in an Ozone Controlled Environment
i. ASTM D1630 (2006; R 2012) Rubber Property – Abrasion Resistance (Footware
Abrader)
j. ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property –
Durometer Hardness
k. ASTM E165/E165M (2003) Standard Practice for Liquid Penetrant Examination for
General Industry
l. ASTM E709 (2021 Standard Guide for Magnetic Particle Testing
m. ASTM F436/F436M (2024) Standard Specification for Hardened Steel Washers Inch and Metric Dimensions
n. ASTM F3125/F3125M (2019) Standard Specification for High Strength Structural
Bolts and Assemblies, Steel and Alloy Steel, Heat Treated, Inch Dimensions 120 ksi and 150 ksi Minimum Tensile Strength, and Metric Dimensions 830 MPa Minimum
Tensile Strength
Moses Lake 05 59 20 - 2 Fabrication of Hydraulic Steel Structures
Tide Gate Repairs October 20, 2025
WJE No. 2024.0927.0 100% Construction Documents
5. Research Counsil on Structural Connections (RCSC)
a. RCSC A348 (2020) RCSC Specification for Structural Joints Using High-strength
Bolts
1.2 SYSTEM DESCRIPTION
A. Submit a detailed Work Plan for fabrication, including descriptions of shop facilities, equipment, and related information prior to the Prefabrication Conference, and procedures for safe conduct of the work, careful removal and disposition of materials, protection of property that is to remain undisturbed, and coordination with other work in progress. Include in the procedures a detailed description of the methods and equipment to be used for each operation, and the sequence of operations. Include the recommended measuring system for ensuring dimensional tolerances in the Work Plan. Perform the fabrication of the following portions under this contract in accordance to this section of the specifications:
1. Replacement portion of gate which is shop fabricated
a. Material with welds will not be accepted unless the welding is specified or indicated on the drawings or otherwise approved.