Milling & HMA Overlay - US-59 Labette County
- The Kansas Department of Transportation is requesting bids for milling and hot mix asphalt overlay work on K-61 in Pratt County, with bids due August 19, 2026 at 1:00 p.m. Local Time and opening at 3:00 p.m. the same day. Contractors must be prequalified with KDOT and submit electronic proposals exclusively through Bid Express using AASHTO's Project Bids software; contractors must also register as bid holders by 5:00 p.m. on the Monday preceding the letting date. The project covers 16.812...
- The Kansas Department of Transportation is soliciting bids on milling and hot mix asphalt overlay work on K-61 in Reno County, spanning 17.664 miles from the Pratt/Reno County Line to the South EWS Bridge (043), with bids due August 19, 2026. The project is tied to KA 8036-01. The scope encompasses pavement milling and asphalt overlay construction on the specified highway segment. Bidders must comply with Kansas Department of Transportation standards, specifications, and contract documents...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on K-61 in McPherson County, with electronic proposals due August 19, 2026 at 1:00 P.M. Local Time via Bid Express. Prequalified contractors only are eligible to bid — this is a mandatory eligibility filter. The project covers repair and reconstruction of Bridge 100 (0.19 miles east of the K-153 Spur) and Bridge 102 (US-81 ALT, at the junction of US-81 ALT/K-61) over a project length of...
- The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is soliciting electronic bids for chip seal construction on K-27 highway in Cheyenne County, with proposals due August 19, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day. The project covers 21.106 miles of K-27 from the West US36/K-27 junction north to the Kansas/Nebraska state line. Work includes mobilization, flagger services, traffic control, chip seal application, cover material (CM-L-2)...
- The Kansas Department of Transportation is seeking sealed bids for Portland Cement Concrete Pavement (PCCP) patching on Interstate 135 in Sedgwick County, with bids due August 19, 2026 at 1:00 p.m. local time through the Bid Express electronic bidding system. The scope covers 3.760 miles of mainline, acceleration/deceleration lanes, and ramps from the HMA/PCCP joint south of 47th Street north to the bridge over Pawnee. Work includes 4,710 square yards of full-depth PCCP patching (11-inch), 335...
- The Kansas Department of Transportation (KDOT) is soliciting bids for Portland Cement Concrete Pavement (PCCP) patching on K-96 highway across Reno and Sedgwick Counties, with bids due August 19, 2026. The project comprises two segments totaling 29.19 miles: KA 8029-01 from the Reno/Sedgwick County line east to North 119th Street in Sedgwick County, and KA 8028-01 from the K-14/K-96 Junction east to the Reno/Sedgwick County line in Reno County. Contractors must comply with state prevailing...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for grading, bridge, and surfacing work on K-55 in Sumner County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The project involves construction of Bridge 117 over the Arkansas River and Bridge 118 over Antelope Creek, located 8.39 and 9.2 miles east of US-81 respectively, spanning 0.063 miles total. Scope encompasses common and road items, temporary project water control and soil erosion measures, bridge...
- The Kansas Department of Transportation is requesting bids for grading and surfacing pavement restoration on US-69A from 23rd Street to 20th Street in Baxter Springs, Cherokee County, with proposals due August 19, 2026 at 1:00 p.m. local time. Contractors must be prequalified and registered as bid holders by 5:00 p.m. on the Monday preceding the letting date and submit proposals electronically through Bid Express at ui.bidx.com. The scope includes clearing and grubbing, common and rock...
- Kansas Department of Transportation (KDOT) is requesting bids on a bridge replacement and grading project in Miami County (located 1.5 miles south and 1.8 miles west of New Lancaster), with proposals due August 19, 2026 at 1:00 p.m. local time via Bid Express. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date. The scope includes bridge replacement over Middle Creek (total project length 0.142...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 017 over Franks Creek and B Road (3.13 miles east of I-70/US-40B West Junction) and Bridge 019 over US-40B/K-57 at the K-57/I-70 Junction in Geary County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The scope encompasses excavation, concrete work, structural steel fabrication, bridge construction and repair, asphalt and concrete surfacing, rumble strips,...
The Kansas Department of Transportation is requesting sealed bids for milling and hot mix asphalt overlay work on US-59 in Labette County, extending 0.155 miles north from the Concrete/Asphalt Joint just north of North Parsons centerline, with bids due August 19, 2026. The project scope consists of milling and HMA overlay construction on the specified segment. Contract award will be made to the lowest responsive and responsible bidder meeting all qualification requirements and technical specifications. Site visits and a pre-bid meeting are available; confirm specific dates through the Kansas Department of Transportation's official project documentation or website. Bidders must submit pricing in accordance with KDOT's standard bid forms and specifications. Performance bonds and insurance requirements are outlined in the complete bid documents available through the Kansas Department of Transportation's procurement portal. Funding derives from KDOT resources, which may include federal highway funds in conjunction with state transportation appropriations.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Milling _ HMA Overlay - US-59 Labette County.pdf | 5MB | 8/16/26 |