Mil Dept - EAFR Castle Trail Paving
Closed State & local contract opportunity Posted
- Solicitation number
- 75142
- State
- Vermont
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Ryan Farina ryan.farina@partner.vermont.gov (802) 338-3247
Opportunity details come from vermontbusinessregistry.com. Updated .
About this opportunity
The State of Vermont Military Department is requesting bids for design services and construction paving on Castle Trail at Ethan Allen Firing Range in Jericho, with proposals due September 18, 2026.
The project scope includes paving Castle Trail from local station 36+50 to 81+50, approximately 4,500 linear feet of existing gravel road approximately 20 feet wide. Work encompasses approximately 1,000 linear feet of RAP switchbacks, installation of new culverts, reclamation of existing asphalt, and ledge removal. The existing road contains areas exceeding 8% grade. The project location begins approximately 1,000 feet east of range 5-1.
The contracting officer has indicated that detailed bidding documents, specific evaluation criteria, pricing terms, site-visit or pre-bid-meeting schedules, and complete response instructions are contained in the Invitation to Bid PDF; however, that attachment was not accessible for review. Interested contractors should contact the State of Vermont Military Department directly to obtain the complete solicitation and bidding requirements.
Opportunity text
Contractors are invited to bid on the Ethan Allen Firing Range (EAFR) Castle Trail Paving project for the State of Vermont Military Department (State) at the Ethan Allen Firing Range in Jericho, Vermont. This project's location is a portion of Castle Trail. The location begins approximately 1,000 feet east of range 5-1 and ends approximately 4,500 feet east of the start point. This project consists of but is not limited to providing design services and construction for paving Castle Trail from local known stations 36+50 to 81+50. The existing road is gravel, approximately 20 feet wide, and has some areas greater than 8% grade. There are approximately 1,000 feet of RAP Switchbacks. Project will also include adding new culverts, reclaiming existing asphalt, and ledge removal.
Files
| File | Type | Posted |
|---|---|---|
| Invite_to_Bid_EAFR_CastleTrailPaving.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity