Miami International Airport (MIA) Central and South Terminal Bag Claim Optimization Phase 2

Closed State & local contract opportunity Posted

Solicitation number
BA059A
State
Florida
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Miami-Dade County Aviation Department is requesting sealed bids for general construction services on the Miami International Airport Central and South Terminal Bag Claim Optimization Phase 2 project, with bids due September 18, 2026 at 2:00 p.m. EST and a mandatory pre-bid conference on August 19 at 10:00 a.m. Small Business Enterprise (SBE) participation is required at 0.43 percent for SBE-Services subcontractors.

Bidders must hold a valid Florida Construction Industry License or Miami-Dade County Certificate of Competency at bid submission and demonstrate prior experience completing or physically modifying at least one similar or larger baggage claim device system within the past ten years. The scope includes demolition of existing Baggage Claim Units 8 through 13 and associated baggage drops; selective demolition of concrete stairs, structural wall openings, bollards, column covers, and roll-up doors; structural infill with CMU blocks and new equipment pads; installation of new flat-plate claim units with stainless steel finishes; new baggage drop conveyors in the tug area with crossover platform; new security and access doors; terrazzo floor infill; wall partitions and finishes per schedule; exterior wall stucco application; selective HVAC modifications; and new electrical, telecommunications, and security system upgrades. All existing signs shall be replaced with new signs of equal size and font.

The contract period is 667 total calendar days from Notice to Proceed: 547 calendar days for construction and 120 calendar days for closing. Liquidated damages are assessed at $809.99 per calendar day for non-excusable delays and $811.42 per calendar day for compensable excusable delays. Performance and payment bonds equivalent to 100 percent of the contract amount are required within 15 calendar days of notice of award. Bids are structured on a lump-sum format across 16 divisions with a 5 percent contingency allowance and 0.25 percent inspector general allowance included in the total bid amount. A 5 percent bid guaranty is required. The mandatory pre-bid conference includes a mandatory site visit restricted to four representatives per contractor. Questions are due before the conference. Bidders must comply with drug-free workplace certification, Americans with Disabilities Act compliance, E-Verify employment verification, and affidavits addressing public entity crimes and conflicts of interest.

Opportunity text

The scope of work for this project consists of, but is not limited to: Temporary requirements, phasing, mobilization and demobilization, daily clean-up. Demolition of the existing Baggage Claim Units and associated baggage drops along with existing K1 doors and infill door openings. Selective demolition of concrete stair, openings in existing structural wall, bollard, column covers, barricade & railing, roll-up door and wall finishes. Remove and return existing signage to MDAD. A - 1 Patch and repair concrete surface, structural infill with CMU blocks, new equipment pad and add column and beam for new structural openings. New flat plate claim units with stainless steel finishes. New baggage drop conveyors in the tug area with new barricade. New crossover platform over drop belt conveyor at tug drive area of bag claim 10. Installation of new SS column covers as per the drawings. New 1" foil faced rigid insulation, fire rated door sealant and expansion joint control system. New type A security door, roll-up K1 door and access panels for maintenance. Floor prep and terrazzo floor infill under the existing conveyor. Patch and repair specific walls with new type M-1 and A-3 wall partitions. Install horizontal corrugated wall panels, SS baseboard, corner guards along with the wall finishes per finish schedule. Prep and paint exterior wall with stucco application. Install new stop sign and white painted directional traffic arrows. Selective HVAC modification includes removal of VAV box, thermostats and ductwork mods along with some duct insulation changes. Installation of new electrical, telecommunication and security system upgrades as required for new baggage claim unit operation. All existing signs shall be replaced with new signs of equal size and font.

Files

File Type Posted
mia BA059A Solicitation.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors