Metro TC&c room power distribution

Closed State & local contract opportunity Posted

Solicitation number
BPM058044
State
Maryland
Responses due

Opportunity facts

Opportunity details come from emma.maryland.gov. Updated .

About this opportunity

The Maryland Department of Transportation Maryland Transit Administration (MDOT MTA) is requesting bids on replacement of power distribution equipment in Train Control and Communication rooms at seven Metro stations plus Blowband Pit, Yard Tower, and Portal under IFB T-1615-0150, with bids due September 28, 2026 at 2:00 P.M. local time via eMaryland Marketplace. No DBE participation goal or SBE goal is established.

The scope comprises furnishing and installing transformers, automatic transfer switches (ATS), manual transfer switches (MTS), switchboards, panelboards, conductors, raceways, conduits, junction boxes, pull boxes, and related infrastructure across all locations. The contractor must perform a comprehensive site survey; develop Preliminary Design Review (PDR) and Final Design Review (FDR) for each location; size conductors, raceways, and breakers based on field conditions; verify components and perform measurements to reflect existing room conditions; remove existing wiring, switchboards, and panelboards; install new wiring with wire tags at each end; apply identification tags and labels to all new switches, transformers, terminal boards, fuses, circuit breakers, and cables; integrate new ATSs and existing Manual Tie Switches with MTA's Automatic Train Supervision System for remote monitoring and alarm integration; deliver as-built drawings, manuals, training materials, and spare parts; and perform commissioning and acceptance testing. All work affecting Metro service must be performed during non-revenue hours between midnight and 4:00 A.M., with all systems restored to normal operation prior to 4:30 A.M. The contract duration is 1,095 calendar days, and the contractor must perform at least 25 percent of the work with its own forces.

The contract is estimated to exceed $1 million and is classified as Cost Group D. Federal Transit Administration grants will finance a portion, subject to Davis-Bacon prevailing wage, Buy America materials preferences, and comprehensive FTA civil rights and labor standards compliance. A 5 percent Bid Bond and 100 percent each Performance and Payment Bonds are required. Bids remain irrevocable for 180 days following public bid opening. Award goes to the lowest responsive and responsible bidder. PDR and FDR packages may be submitted and approved separately by location with a 21-calendar-day review period; material procurement may commence upon individual location approval.

Opportunity text

  1. This Contract is for the replacement of existing transformers, Automatic transfer switches (ATS) and Manual transfer switches (MTS), switchboards, and panelboards and for the reconfiguration of power distribution in the Train Control and Communication rooms at seven (7) Metro Stations, Blowdown Pit, Yard Tower, and Portal. The work involves:
    1. Contractor shall preform a site survey to provide a Preliminary Design Review (PDR), Final Design Review (FDR), Installation, and Site Layout plans. Contractor shall size conductors and raceways to reflect field conditions, determine breaker sizes, and all other related project elements. Contractor shall finalize the design for each location based on Specifications and plans. Contractor has to verify all the components and perform measurements to reflect existing room conditions. PDR and FDR shall be submitted to the Engineer for review and approval prior to any product and material purchase.
    2. Products and Materials: furnish and install, unless otherwise specifically identified in the Material List, all materials, implements, equipment, tools, supplies, transportation, and temporary utilities necessary for the execution and completion of the work.
    3. Installation of infrastructure, including conduits, common hardware, rack mounts, conduit fittings, junction boxes, pull boxes, and other miscellaneous materials as required to complete the work.
    4. Removal of existing wiring and cables, switchboards, panel boards, etc. installation of new wiring as part of the circuit modifications.
    5. Installation of wire tags on each end of all new and relocated wires.
    6. Installation of Identification tags and labels on all new switches, transformers, terminal boards, fuses, circuit breakers, cables, switchboards, panel boards, etc.
    7. Integration of new ATSs and existing Manual Tie Switches with the MTA's Automatic Train Supervision System for remote monitoring and integration of alarms into MTA's new Automatic Train Supervision System via existing station interfaces (PLCs).
    8. Disposal of demolished and removed materials.
    9. As-built drawings: Final drawings to reflect As-Built Conditions.
    10. Manuals, training, aids, and spare parts.
    11. Commissioning and Acceptance testing of all installed components and systems/subsystems:
    12. On-site support; warranty; quality assurance and quality control; construction and as-built drawings; and final project documentation.