Irrigation tank floating cover replacement
Open State & local contract opportunity Posted
- Solicitation number
- Not Provided
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Mike Jackson mjackson@avon.org (970) 390-2280
- Jim Shoun jshoun@avon.org (970) 949-1338
- Shari Browder shari.browder@frontrange.edu (303) 667-8671
- John Usery john.usery@artaicgroup.com (303) 708-1818
- Michelle Davis michelle.davis@longmontcolorado.gov (303) 651-8343
- Elizabeth Messner elizabeth.messner@lafayetteco.gov (303) 661-1444
- Whitney Moore wlmoore@westminsterco.gov (303) 658-2064
- Jocelyn Kupferman jocelyn.kupferman@d11.org (719) 477-6046
- Flora Aguirre-Diaz flora.aguirre-diaz@colorado.edu (303) 591-5722
- Victoria Santistevan vsantistevan@fedheights.org (303) 412-3533
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Arapahoe County, Colorado is soliciting bids for the Mary Carter Greenway Irrigation Replacement Phase 4, a multi-jurisdiction infrastructure project with a proposal deadline of August 28, 2026.
The scope encompasses five distinct service categories across multiple Colorado municipalities: design and installation of bus charging equipment at Avon's bus garage; installation of 267 traffic signs and 156 sharrow markings throughout Jefferson County's roadway network to support bicycle infrastructure per the Jefferson County Bicycle Plan, including statutory three-feet-to-pass signage on shared roadways, shared roadways with spot treatments, and neighborhood bikeways; installation of a new HVAC system and removal of four existing radiant tube heaters at the City of Glenwood Springs Fleet building; provision and installation of an HDPE irrigation system per plan specifications; and engagement of one or more contractors to perform woody biomass removal, reduction, and hauling services in connection with forestry, wildfire mitigation, and hazardous fuels treatment efforts.
The attached bidding documents (biddoc.pdf files posted August 4–5, 2026) were not accessible in readable form. Consequently, this summary cannot confirm contract value, contract term, set-aside or preference eligibility, evaluation criteria, site-visit or pre-bid meeting schedules, question-submission deadlines, incumbent contractor information, place of performance beyond the named jurisdictions, or specific technical specifications for the HVAC and irrigation components. Vendors should obtain the complete bidding document directly from Arapahoe County to confirm all procurement requirements and timelines.
Opportunity text
37 versions
Update #37 · Latest ·
The Town has a 1.4 million gallon Irrigation Tank that has a floating cover. The floating cover needs removed, the tank cleaned out and inspected and a new floating cover installed. The irrigation water is a combination of reuse and raw water.
Update #36 ·
Fort Lewis College seeks a qualified contractor to inspect, test, and document campus fire alarm systems in compliance with NFPA 72 and applicable codes. The contractor must complete scheduled testing, verify system performance, coordinate elevator testing, identify deficiencies, and submit required reports to the College, the local fire department, and the IROL system.
Update #35 ·
Construction of approximately 10,000 LF of 8-inch through 21-inch PVC sanitary sewer, sanitary sewer manholes, steel casing and trenchless boring, open-cut irrigation ditch crossings, roadway and utility crossings, permanent gravel access road construction, earthwork, dewatering, erosion and sediment control, surface and infrastructure restoration, and appurtenant work
Update #34 ·
The site is located at three (3) locations in the City of Lafayette. Location 1 is located north of E Emma St between S Burlington Ave and Canterbury Dr. Location 2 is located on S Public Rd between S Public Rd (roundabout) and Prana Park. Location 3 is located on N Carr Ave between W Baseline Rd and W Geneseo St. Construction consists of soft surface trail construction, paint and post pedestrian improvements, and concrete sidewalk construction. Project elements include storm water pipe, delineators, concrete sidewalk, fencing, traffic control, signing, striping, and final stabilization of the area upon project completion.
Update #33 ·
Improve classroom and office life-safety and emergency response capabilities. Improve campus lockdown and emergency access functionality. Modernize and standardize door hardware and access-control infrastructure. Improve key control and credential management practices. Increase reliability, maintainability, and consistency across campus security systems. Support accessibility, code compliance, and operational continuity. Establish a scalable framework for future security enhancements and technology integration. UCCS anticipates using a Design/Build Entity approach to project delivery where the Design/Build Entity will design, manage and construct the project as described within.
Update #32 ·
The City of Fort Collins, Transfort is requesting bids for construction of concrete bus pads, curbs and gutters at designated locations on Colorado State University (CSU) campus. Traffic Control, excavation, construction, site restoration and irrigation repair back to pre-construction conditions or as directed will be required under this contract. There are bid alternates for installation of bus stop amenities, some additional quantities at one stop on the Foothills campus, as well as plans at the Equine Center. This project will be utilizing Federal Funding and takes place on State land.
Update #31 ·
Perform site preparation Work as shown and specified. The following list is to be used as a general guide and shall not be considered as limiting the scope of work. The Work includes but is not limited to: 1. Record and notify Owner of existing damaged conditions or improvements as specified under Division 1 prior to commencing any mobilization, demolition, grading or construction operations. 2. Protect all existing walks, pavements, site improvements, utilities, buildings, grades and landscape improvements designated to remain with suitable barriers. Restore all areas to the original condition or as may be defined by the Drawings or the Owners Rep. 3. Layout, designate for Owners approval and upon approval of Owner, remove existing site elements shown or not shown on the Drawings but logically required to be removed to affect the Work defined. 4. If work is proposed within public right-of-way: develop a Traffic Control Plan defining safety and traffic control for vehicles, pedestrians and Contractors forces as defined by City and CDOT (if applicable) permit requirements. See Section 01 55 26 Traffic Control for requirements (if included). Make modifications as may be required to accommodate changing conditions throughout the period of the Contract.
Update #30 ·
Adams County Board of County Commissioners by and through its Purchasing Division of the Finance Department is accepting proposals for Adams County Human Services Center Curtain Wall Replacement.
Update #29 ·
Professional architectural and engineering services for improvements to the aurora police department's outdoor pistol range. the primary objective of the project is to improve year-round operation of the range through the design of a heating system and an associated roof structure or partial enclosure.
Update #28 ·
This Request for Proposal (RFP) solicits competitive proposals from qualified contractors on behalf of Widefield School District 3 for the comprehensive renovation, remodeling, and environmental remediation of Sproul Junior High School. The primary objective is to modernize existing facilities, enhance student learning environments, improve building efficiency, and upgrade infrastructure to current safety and accessibility standards. Beyond general interior and structural remodeling, the project scope requires the mandatory identification, containment, or mitigation of hazardous materialsspecifically asbestos.
Update #27 ·
The City of Federal Heights is requesting competitive bids from qualified, licensed contractors to provide routine and emergency street sweeping services. The objective of this program is to maintain clean, safe, and aesthetic roadways, protect local air quality, and ensure compliance with Colorado Department of Public Health and Environment (CDPHE) MS4 Stormwater Permit requirements. The sweeping areas, as detailed in the attached map, consist of approximately 19 centerline miles, which equates to roughly 35.5 curb miles of sweeping
Update #26 ·
The City and County of Denver (City) is soliciting qualifications from interested firms to qualify for bidding eligibility on the Central Platte Valley Campus Salt Dome Reroof Project. The goal of the project is to reroof the Central Platte Valley Campus Salt Dome, including removal and replacement of asphalt shingles, installation of highwind and impactresistant roofing materials, limited plywood deck replacement, and removal/replacement of entryarea vinyl siding. Materials must meet UL Class A Fire Rating, UL 2218 Impact Rating, ASTM wind ratings, and be corrosionresistant due to salt-sand mix exposure.
This project is being procured through a two-stage bid approach of RFQ and construction hard bid, as recommended by the Manager of DOTI Contract & Procurement and Director of DOTI IA due to the specialized experience required for the project.
Update #25 ·
The Town of Parker, Colorado (Town) is soliciting proposals from qualified elevator contractors to provide full-service preventive maintenance, inspection, witness testing, repair, emergency callback, code-compliance monitoring, and reporting for elevator equipment at multiple Town facilities. The portfolio includes equipment from multiple original equipment manufacturers. The selected contractor must provide consistent, complete service across all makes, models, and control platforms.
Update #24 ·
The Jaskowski Park and Open Space Project may consist of grading and installing a gravel parking lot, lot
lighting, security fencing around existing buildings, perimeter trail, and interior trail enhancements.
Update #23 ·
The Town of Estes Park is looking for an experienced HVAC contractor to provide professional services for the HVAC Maintenance and Service of 19 Town of Estes Park facilities.
Update #22 ·
The County of Jefferson, Colorado, is accepting responses for emergency motel shelter rooms in accordance with the terms, conditions, and specifications contained in these solicitation documents.
Update #21 ·
- The Town of Avon seeks Statements of Qualifications from qualified firms (Firm) to provide construction management support and quality assurance services for capital improvement projects. The selected Firm will serve as an extension of Town staff during construction, providing project oversight, quality-assurance site visits, documentation, reporting, coordination, and assistance with project closeout.
Update #20 ·
The Well R4 electrical system is approaching the end of its reliable service life and requires replacement. The project includes demolition of existing equipment and targeted upgrades, including reuse of the existing utility transformer while providing a new service entrance main, manual transfer switch, distribution equipment, soft starter, and lighting panels. Scope also includes replacement of lighting and receptacles, along with miscellaneous process improvements.
Update #19 ·
Renovate restrooms in Rooms 121, 125, 204, and 216 within the Space Sciences (SPSC) building to provide modern, reliable, code-compliant facilities that meet current user expectations. The project will address existing deficiencies, replace aging infrastructure and fixtures, improve functionality and maintainability, and provide a refreshed appearance that aligns with University standards. Project consists of the complete renovation of four existing restrooms. Work will include selective demolition and removal of existing finishes, fixtures, and systems down to the existing framing as required. New work will include plumbing, mechanical, electrical, fire suppression, fire alarm modifications, architectural finishes, restroom specialties, accessories, and fixture replacement.
Update #18 ·
The Town of Breckenridge is seeking a qualified CMGC for preconstruction services and the construction of a classroom addition and limited interior remodel of a private daycare facility.
Update #17 ·
To achieve compliance of Denver Public Schools fire sprinkler through third party inspection services.
Update #16 ·
The City of Westminster is requesting bid proposals from qualified contractors for the furnishing, delivery, removal, and installation of lockers in the Womens Locker Room at the Westminster Public Safety Center. The intent of this project is to replace 32 linear feet of single 12W x 24D x 72H lockers with double 24W x 24D x 72H lockers steel lockers that meet City specifications and improve functionality, durability, and accessibility. The successful Contractor will enter into a contract with the City for the completion of the work outlined herein.
Update #15 ·
The City of Thornton seeks consultant services to conduct an Aquatics and Site Feasibility Study for Park Village Park, a 4.7-acre site containing an aging outdoor pool complex, playground, detention basin, parking lot, and supporting facilities. The study will evaluate existing conditions, community needs, aquatic service gaps, site constraints, and regional aquatic recreation trends to determine the most appropriate long-term strategy for the site. The consultant will engage stakeholders, assess feasible redevelopment alternatives, develop a decision-making framework to evaluate tradeoffs, and identify options for accommodating existing aquatic programs if services are modified or relocated. The final deliverable will include conceptual alternatives, cost and operational considerations, a preferred recommendation, and an implementation strategy that aligns community priorities with citywide aquatic recreation needs.
Update #14 ·
Lake Ave Intersection Improvements
Update #13 ·
The University of Colorado Denver (CU Denver) seeks qualified architecture, planning, sustainability, engineering, or other development consultants to assist CU Denver in evaluating decarbonization and district thermal options for three academic buildings (~900,000 square feet in total) in downtown Denver. This study is being funded by a District Energy Conversion grant from Denvers Climate Action Sustainability and Resiliency Office. Contingent upon satisfactory work and the results of the feasibility study, CU Denver anticipates a second phase of the project to complete schematic design and costing for any RFQ-AE R3 Rev 09/2025 building(s) that have demonstrated feasibility and gained approval from the City and County of Denver
Update #12 ·
Utilities is seeking proposals for Pre-Construction and Construction Services from a Construction Manager/General Contractor (CMGC) for the enlargement of Montgomery Reservoir, known as the Continental Hoosier System (CHS) Project (Project), delivered through a CMGC delivery model. The Project is located in Park County, Colorado, near Hoosier Pass, approximately 95 highway miles northwest of Colorado Springs. The Project consists of a Pre-Construction Phase and a Construction Phase, with the CMGC serving as an integrated member of the Project Team throughout planning, design, procurement, and construction.
Update #11 ·
The City of Lone Tree is soliciting bids for renovation of approximately 22,000 square feet of existing administrative office space on the first and second floors of the existing City Administration Building at 9220 Kimmer Drive. The Work includes selective demolition, partitions, doors and hardware, glazing, ceilings, finishes, millwork, plumbing, mechanical, electrical, fire alarm coordination, technology, security, access control, audiovisual coordination, temporary facilities, protection, phasing, closeout, and related Work indicated in the Contract Documents.
Update #10 ·
The City of Lafayette seeks proposals from qualified mechanical and electrical contractors or engineer-led design-build teams to:
Evaluate boiler replacement options at both facilities; and Provide full replacement pricing for each option, including equipment, labor, parts, electrical modifications, controls integration, commissioning, and timelines.
Respondents must propose total project costs for each replacement option and identify any considerations, constraints, risks, or recommendations that the City should be aware of. The City intends to use the results of this procurement to determine which approachlike-for-like gas replacement or electric boiler conversionis most practical, cost-effective, and sustainable. The City intends to award the project to the most responsive vendor if a practical solution is proposed.
Update #9 ·
The City intends to establish one or more pre-positioned contracts for clearing and removing any and all eligible debris as defined by FEMA Public Assistance Program and Policy Guide, latest version, Fact Sheets, and all applicable State and Federal Disaster Specific Guidance and policies. Services under this contract may include reduction of and or final disposal of all incident generated debris, and other emergency clean-up activities associated with a natural, technological, or manmade disaster. The City will request services on an on-call, as-needed basi
Update #8 ·
The City of Grand Junction is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required to remove and replace of all Motor Control Center for the Ridges Primary Pump Station. Contractor will coordinate directly with the utility company to deenergize and reenergize the Pump House. Contractor will perform the work during off irrigation season which generally runs from November to February. All dimensions and scope of Work shall be verified by Contractors prior to submission of bids.
Update #7 ·
Front Range Community College (FRCC) is soliciting bids from qualified Mechanical Contractors for the 2026-046M25 Replace AHU and Exhaust Fans project at the Westminster Campus per the Construction Documents dated 8-7-26.
Update #6 ·
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 561730 - Landscaping Services. The Department of Veteran Affairs, National Cemetery Administration intends to award a firm, fixed price contract for the procurement of tree maintenance services at Fort Logan National Cemetery. PoP 07/20/2026 - 09/30/2026
Update #5 ·
To enter into an agreement with one (1) or more Contractor(s) to perform woody biomass removal, reduction and hauling services, to help deal with the woody biomass generated from forestry, wildfire mitigation and hazardous fuels treatments.
Update #4 ·
Provide and install HDPE Irrigation System per Plan
Update #3 ·
The City of Glenwood Springs is looking for a qualified vendor to install a new HVAC system in the City of Glenwood Springs Fleet building and remove the existing 4 radiant tube heaters.
Update #2 ·
This project consists of installing traffic signs and roadway symbols throughout Jefferson Countys roadway network. The Contractor shall install statutory three feet to pass signage on corridors identified as shared roadways, shared roadways with spot treatments, or neighborhood bikeways within the Jefferson County Bicycle Plan. Neighborhood bikeways will also have directional shared roadway symbols (sharrows) installed to guide bicyclists through the neighborhood bikeway network. The project will install 267 signs and 156 sharrows throughout the county.
The Contractor shall install all signage and markings per plan
Update #1 ·
Design and install bus charging equipment in Avon's bus garage.
Files
| File | Type | Posted |
|---|---|---|
| bidnotice.pdf | ||
| QSE_36C78626Q50245.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity