This is a Request for Proposal (RFP) notice issued by Colorado Springs Utilities for Construction Manager/General Contractor (CMGC) pre-construction and construction services for the Continental-Hoosier System (CHS) project located near Hoosier Pass in Park County, Colorado, approximately 95 miles northwest of Colorado Springs. The project involves the enlargement of Montgomery Reservoir and is being delivered through a CMGC model, with the selected contractor serving as an integrated member of the project team throughout planning, design, procurement, and construction phases. A mandatory pre-bid conference is scheduled for August 26, 2026, at 10:00 AM EDT in Alma, Colorado, with suppliers required to RSVP by August 24 at noon and provide a signed Non-Disclosure Agreement (NDA) by August 25 at noon to attend. The question acceptance deadline is October 21, 2026, at 7:00 PM EDT, with proposals due by the closing date of October 30, 2026, at 7:00 PM EDT. Bid submission is electronic, with pricing details included in the attached RFP documents.
The solicitation requires bidders to provide performance bonds and maintenance bonds equal to 100 percent of the contract value. All suppliers must execute and submit a signed NDA prior to receiving solicitation documents, and any subcontractors must also have signed NDAs on file with Colorado Springs Utilities before receiving documents. Contact for this procurement includes Kelli Kennedy at 719-668-7346 or kekennedy@csu.org and Ryan Plumstead at 719-668-2877. The RFP documents were published on August 16, 2026, and the solicitation was officially published on August 14, 2026. Prospective bidders must obtain bid documents electronically and are limited to submitting one file as their complete proposal response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QSE_36C78626Q50245.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf | ||
| biddoc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice Project Number RFP-KSK-G9131
Title CM/GC Pre and Construction Services, Continental-Hoosier System (CHS)
Basic Information Reference Number 0000433610
Issuing Organization Colorado Springs Utilities
Owner Organization SPP
Project Type RFP - Request for Proposal (Formal)
Project Number RFP-KSK-G9131
Title CM/GC Pre and Construction Services, Continental-Hoosier System (CHS)
Source ID PU.AG.USA.1243.C18269226
Piggyback Solicitation No
Details
Location El Paso County, Colorado
Job Location Montgomery Dam
Description Utilities is seeking proposals for Pre-Construction and Construction Services from a Construction Manager/General Contractor (CMGC) for the enlargement of Montgomery Reservoir, known as the Continental Hoosier System (CHS) Project (Project), delivered through a CMGC delivery model. The Project is located in Park County, Colorado, near Hoosier Pass, approximately 95 highway miles northwest of Colorado Springs. The Project consists of a Pre-Construction Phase and a Construction Phase, with the CMGC serving as an integrated member of the Project Team throughout planning, design, procurement, and construction.
Dates
Publication 08/14/2026 02:58 PM EDT
Bid Intent Not Available
Question Acceptance Deadline 10/21/2026 07:00 PM EDT
Questions are submitted online Yes
Closing Date 10/30/2026 07:00 PM EDT
Prebid Conference 08/26/2026 10:00 AM EDT
Contact Information Kelli Kennedy
719-668-7346 kekennedy@csu.org
Ryan Plumstead
7196682877 rplumstead@csu.org
Bonding Requirements
- Performance Bond 100.00 %
- Maintenance Bond 100.00 %
Pre-Bidding Events
Event Type Prebid Conference
Attendance Mandatory
Event date 08/26/2026 10:00 AM EDT
Location Alma, CO
Event Note The agenda is still being finalized; additional details will be provided to those who RSVP.
Suppliers must RSVP by August 24 at noon to kekennedy@csu.org.
Suppliers must also have a signed NDA on file with Utilities by August 25 at noon to attend the Pre-Proposal meeting/Site walk.
Required Acknowledgement
Solicitation Guidelines and NDA
Suppliers must send a signed copy of the NDA to be granted access to the documents for this solicitation. The NDA is part of the Guidelines
RFP-KSK-G9131 - CM/GC Pre and Construction Services, Continenta...
08/16/2026 12:02 AM EDT Page 1 of 2 document. Suppliers must also supply a signed NDA to Utilities before supplying the documents to any subcontractor.
Bid Submission Process
Bid Submission Type Electronic Bid Submission
Pricing In attached document
Pricing In attached document
Bid Documents List
Item Name Description Mandatory Limited to 1 file
Bid Documents Documents defining the proposal Yes No
RFP-KSK-G9131 - CM/GC Pre and Construction Services, Continenta...
08/16/2026 12:02 AM EDT Page 2 of 2
Notice
| Basic Information |
| Details |
| Dates |
| Contact Information |
| Bonding Requirements |
| Pre-Bidding Events |
| Required Acknowledgement |
| Bid Submission Process |
File details come from the government source that posted it. Updated .