Main Street Well 3 & Newport Well 3 Improvements Project (2026/2027) - CIP No. 60177
Closed State & local contract opportunity Posted
- Solicitation number
- CIP No. 60177
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Hy Dang-Libunao hdang-libunao@tustinca.org (714) 573-3148
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Tustin is requesting sealed bids for the Main Street Well 3 & Newport Well 3 Improvements Project (CIP No. 60177), a municipal water well rehabilitation and modernization effort, with bids due September 15, 2026 at 2:00 PM and a mandatory pre-bid meeting and site walk-through on August 20, 2026 at 10:00 AM at both well locations.
Bidders must hold a California Class A Contractor's License and possess Public Works Contractor Registration with the California Department of Industrial Relations. The project is subject to prevailing wage requirements under California Labor Code sections 1770 et seq., with certified payroll records required every two weeks.
For Main Street Well 3, work includes pre-removal testing and documentation of existing pump and motor conditions, removal and assessment, downhole video inspection, conversion of the existing oil-lubricated lineshaft system to continuous water-lubrication, well rehabilitation (brushing, bailing, chemical treatment, and dual-swab airlifting where authorized), and pump and motor refurbishment or replacement with complete operational system and startup testing. For Newport Well 3, work includes pre-removal testing, removal and assessment, downhole video inspection, electromagnetic casing integrity analysis, new magnetic flow meter and motor-operated valve installation, piping replacement, electrical system upgrades with PLC and SCADA controls, and asphalt pavement restoration. The project schedule is 150 contract days with liquidated damages of $1,000 per day for schedule delays.
The Engineer's Estimate is $775,000. Apparent low bidders are selected based on combined base bids for both wells plus two fixed replacement differential allowances of $30,000 each, excluding additive alternates. Bid security of 10 percent of the bid amount is required as a cashier's check, certified check, or bid bond. The successful contractor must provide Faithful Performance and Labor and Materials Payment Bonds at 100 percent of the contract amount from a California-authorized surety. Insurance requirements include commercial general liability and automobile liability with single limits of $2,000,000 minimum and A.M. Best Grade A, Class VII or better rating. Five percent retention is withheld from progress payments. Questions are due August 27, 2026 at 5:00 PM. Bids are valid for 60 calendar days.
Opportunity text
NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, hereinafter referred to as City or AGENCY invites sealed bids for the above stated project and will receive sealed bids for the construction, materials, supplies, equipment and/or services set forth herein, subject to all conditions outlined in the Bid Package.
Scope of Work: The Work encompassed by the Project is more specifically defined in the Contract Documents, but in general consists of, but is not limited to the following Work:
Main Street Well #3:
- Perform pre-removal testing and document existing pump and motor operating conditions.
- Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
- Perform downhole video inspection and submit well-condition assessment report.
- Convert the existing oil-lubricated lineshaft system to a continuous water-lubricated configuration, where indicated and authorized.
- Perform brushing, bailing, chemical treatment, dual-swab airlifting, redevelopment, and related well rehabilitation only when authorized by the City based on inspection results.
- Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
- Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
- Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, and post-rehabilitation inspection where required.
- Restore disturbed areas and complete closeout requirements.
Newport Well #3:
- Perform pre-removal testing and document existing pump and motor operating conditions.
- Remove, transport, inspect, test, and evaluate the existing pump and motor; submit condition-assessment reports.
- Perform downhole video inspection and noninvasive electromagnetic casing-thickness/integrity analysis; submit well-condition assessment report.
- Because Newport Well No. 3 is considered fragile, perform well cleaning, redevelopment, casing repair, or other downhole rehabilitation only when specifically authorized by the City.
- Rehabilitate, rewind, reinstall, or replace the existing pump and/or motor as authorized by the City.
- Install new magnetic flow meter and MOV on the waste-discharge piping.
- Remove and replace the existing magnetic flow meter and MOV on the system-discharge piping.
- Remove existing electrical equipment as needed and furnish/install new electrical, controls, instrumentation, PLC, and SCADA work where required.
- Reinstall the approved rehabilitated or replacement pump and motor and provide a complete operational pumping system.
- Perform startup, performance, vibration, electrical, operational testing, flushing, disinfection, meter/MOV testing, and post-work inspection where required.
- Restore disturbed areas and complete closeout requirements.