Emergency Sirens Phase 2 FEMA -HMGP 5420 FY2022 Post Fire
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-053
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Ryan Quigley rquigley@celina-tx.gov (940) 208-0128
- Sara Robertson srobertson@sanmarcostx.gov (512) 393-8295
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Hood County, Texas is requesting bids on repairs and improvements to the Main Lift Station, with bids due July 30, 2026.
The scope includes replacement of existing discharge piping within the wet well, improvements to bypass pumping connection piping with new valve installation, and implementation of temporary construction bypass pumping to maintain continuous lift station operation during construction. Supplemental bid items for concrete coating repairs are included and may be authorized at the discretion of the project owner. Bidders must comply with specified requirements regarding equipment, piping materials, valve specifications, pumping system design, and concrete coating repair standards, including quality assurance, inspection procedures, and performance standards.
The attached specification document (2026-053.pdf) establishes the technical requirements and construction methodologies required for project execution. Payment terms, project scheduling, bonding, and insurance requirements are governed by the associated bidding documents and contract terms.
Opportunity text
2 versions
Update #2 · Latest ·
The construction project includes the installation of three (3) warning sirens at various locations and associated appurtenances.
Update #1 ·
Project Scope: The scope of work for this project consists of repairs and improvements to the existing Main Lift Station. Major work elements include replacement of existing discharge piping within the wet well, improvements to the bypass pumping connection piping with installation of new valves, and implementation of temporary construction bypass pumping to maintain continuous operation of the lift station during construction. The project also includes supplemental bid items for concrete coating repairs to be performed if authorized.
Files
| File | Type | Posted |
|---|---|---|
| Emergency Sirens Phase 2 FEMA -HMGP 5420 FY2022 Post Fire.pdf | ||
| 2026-053.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity