Madison County Water Line Expansion
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66141-NONST-2025-000000009
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90740 Engineering Services, Non-Licensed (Not Otherwise Classified)
- 90772 Safety Engineering And Accident Studies; Osha Studies
- 91842 Engineering Consulting
- 92517 Civil Engineering
- 92528 Drainage Engineering
- 92536 Engineering Services (Not Otherwise Classified)
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- 92596 Waste Water Treatment Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 81101500 Civil engineering
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81101529 Acoustic engineering
- 81101531 Sanitation engineering service
- 81101606 Marine engineering
- 81101607 Textile engineering service
- 81102501 Mine permitting service
- 81102702 Process control system design and engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Madison County Board of Commissioners, with technical assistance from the Northeast Georgia Regional Commission (NEGRC), is issuing a Request for Qualifications (RFQ) for engineering firms to provide preliminary design services and, if funded, engineering services for a potential FY25 Community Development Block Grant (CDBG) project. The purpose of the project is to expand approximately 1.5 miles of water services to serve 56 residences along sections of Stone Stewart Road, Griffeth Road, Shady Lane, and Northwood Circle in Madison County. Responding firms must be technically qualified and licensed in the State of Georgia, and the selected vendor will be required to provide a draft Preliminary Engineering Report (PER) for the CDBG application no later than February 29, 2025. The RFQ outlines the required statement of qualifications content, the evaluation and selection process, and the project timeline, with qualifications due by 5:00 p.m. EST on November 14, 2024, and the selected vendor to be determined by December 2, 2024. The project may be subject to Section 3 requirements of the HUD Act of 1968, and all contracts are subject to federal and state contract provisions.
The RFQ does not specify any set-aside designations or restrictions on the types of organizations that can respond. The procurement is open to all qualified engineering firms. The RFQ does not list any incumbent vendors or current contractors, and it does not provide any information on existing infrastructure or technology that requires integration. The RFQ also does not indicate a specific award value or budget range for the project.
Opportunity text
General Statements of qualifications and proposals are being requested from engineering firms with a strong record in successfully assisting local governments with the implementation of Community Development Block Grant (CDBG) programs. Responding firms should be technically qualified and licensed in the State of Georgia to provide these services. The Madison County Board of Commissioners plans to contract for engineering preliminary design services required for a potential FY25 CDBG project and, if funded, for engineering services for the implementation of the project. The purpose of the project is to expand approximately 1.5 miles of water services to serve 56 residences along sections of Stone Stewart Road, Griffeth Road, Shady Lane, and Northwood Circle in Madison County. The RFQ is issued by the Madison County Board of Commissioners with technical assistance provided by the Northeast Georgia Regional Commission (NEGRC).
Files
| File | Type | Posted |
|---|---|---|
| RFQ_MadisonCo_Water.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity